Each project in the letting is listed with descriptive information. Click on a project to obtain a tabulation of item bids
for each bidder. It includes the unit bid for each item as well as the total item bid. Also shown are the bidder totals and ranking
for each project.
| | |
| DBE GOAL FED |
| Lead Project: 063-04-0034 |
| Parish: JEFFERSON |
| Routes: LA 18 |
| Description: LA 18 WIDENING (RIVER ROAD TO HIGHWAY 90) |
Type Const:
grading, lime treatment, class ii base course, drainage structures, superpave asphaltic
concrete pavement, and related work. |
| Low Bidder: BARRIERE CONSTRUCTION CO., LLC. |
| Amount: $4,913,222.95 |
| Estimated Construction Cost: $6,295,704.00 |
| Federal Number: STP-2603(503) |
| | |
| DBE GOAL FED |
| Lead Project: 450-17-0032 |
| Parish: ST TAMMANY, ORLEANS |
| Routes: I-10 |
| Description: ACROW DISASSEMBLY, TRANSPORTATION, RELOCATION, AND STORAGE |
Type Const:
disassembly, transportation, relocation, and storage of acrow temp. panel bridging,
repair of galvanized coatings, construction of metal storage buildings and related work. |
| Low Bidder: BOH BROS. CONSTRUCTION CO., LLC. |
| Amount: $3,881,467.28 |
| Estimated Construction Cost: $3,518,199.98 |
| Federal Number: ER-ERP1(115) |
| REBID | |
| DBE GOAL FED |
| Lead Project: 704-36-0028 |
| Parish: ORLEANS |
| Routes: |
| Description: PERMANENT REPAIR TO FEDERAL AID ELIGIBLE ROADS |
Type Const:
cold plane asphaltic concrete, pcc patching, asphaltic overl ay striping, pavement
widening, water line replacement & ada ramps |
| Low Bidder: BARRIERE CONSTRUCTION CO., LLC |
| Amount: $4,297,790.09 |
| Estimated Construction Cost: $4,609,093.14 |
| Federal Number: ER-ERP1(044) |
| REBID | |
| DBE GOAL FED |
| Lead Project: 713-36-0100 |
| Parish: ORLEANS |
| Routes: |
| Description: BAYOU ST. JOHN (PARK ISLAND) |
Type Const:
class ii bc, superpave asphaltic concrete pavement, portland cement concrete pavement,
landscaping, slab span bridge, water and sewer mains, and related work |
| Low Bidder: CYCLE CONSTRUCTION CO. L.L.C. |
| Amount: $1,988,131.60 |
| Estimated Construction Cost: $1,560,905.35 |
| Federal Number: BRO-002S(391)M |
| | |
| DBE GOAL FED |
| Lead Project: 713-50-0107 |
| Parish: ST MARTIN |
| Routes: |
| Description: BRIDGE OVER BAYOU TECHE |
Type Const:
grading, class ii base course, superpave asphaltic concrete pavement, drainage
structures, precast prestressed concrete girders span bridge, and related work. |
| Low Bidder: GILCHRIST CONSTRUCTION CO. LLC |
| Amount: $1,715,502.90 |
| Estimated Construction Cost: $2,502,256.90 |
| Federal Number: ARR-5003(501) |
| | |
| DBE GOAL FED |
| Lead Project: 713-53-0112 |
| Parish: TANGIPAHOA |
| Routes: |
| Description: J.W. DAVIS & LITTLE ITALY ROAD BRIDGES |
Type Const:
clearing and grubbing, grading, class ii base course, superpave asphaltic concrete
pavement, concrete slab bridges and related work. |
| Low Bidder: KEY CONSTRUCTORS, INC. |
| Amount: $1,426,691.30 |
| Estimated Construction Cost: $1,407,992.00 |
| Federal Number: ARR-5302(508) |
| | |
| DBE GOAL FED |
| Lead Project: 713-53-0114 |
| Parish: TANGIPAHOA |
| Routes: |
| Description: BENNETT RD OVR NATALBANY CRK, COOPER RD OVR COOPER CRK BRDGS |
Type Const:
grading, class ii base course, superpave ashpaltic concrete, concrete slab span
bridges, and related work. |
| Low Bidder: T. L. WALLACE CONSTRUCTION, INC. |
| Amount: $993,138.00 |
| Estimated Construction Cost: $1,051,542.50 |
| Federal Number: ARR-5302(510) |
| | |
| DBE GOAL FED |
| Lead Project: 853-10-0016 |
| Parish: TANGIPAHOA |
| Routes: LA 1040 |
| Description: REALIGNMENT OF LA 1040 |
Type Const:
grading, drainage structures, class ii base course, lime treatment, superpave asphaltic
concrete pavement, portland cement concrete pavement, and related work. |
| Low Bidder: BYRON E. TALBOT CONTRACTOR, INC. |
| Amount: $1,508,076.11 |
| Estimated Construction Cost: $2,034,732.32 |
| Federal Number: STP-5305(514) |