Letting of 4/22/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-20-0116
Parish: EVANGELINE
Routes:
Description: RED FOX LANE BRIDGE & 1ST STREET BRIDGE IN CHATAIGNIER
Type Const: grading, drainage structures, class ii base course, superpav e asphaltic concrete
pavement, and related work.
Estimated Construction Cost: $528,362.00
 
RankLicenseBidderConstruction Bid
1 49239 W L BASS CONSTRUCTION INC. $494,209.00
2 39580 GERACE CONSTRUCTION LLC $549,414.40
3 00060 F. MILLER CONSTRUCTION LLC $651,989.00
4 09090 GUINN BROTHERS, LLC. $753,760.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
W L BASS CONSTRUCTION INC.
- 2 -
GERACE CONSTRUCTION LLC
- 3 -
F. MILLER CONSTRUCTION LLC
- 4 -
GUINN BROTHERS, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 18,000.00 18,000.00 8,500.00 8,500.00 10,000.00 10,000.00 25,000.00 25,000.00
202-01 removal of structures & obstructions lump      LUMP 15,000.00 15,000.00 5,000.00 5,000.00 2,700.00 2,700.00 20,000.00 20,000.00
202-02-A-01 removal of bridge(sta. 10+000.000;18' x 28.7'timber
bridge)
1      EACH 5,000.00 5,000.00 4,500.00 4,500.00 12,000.00 12,000.00 15,000.00 15,000.00
202-02-A-02 removal of bridge(sta. 10+000.000; 20.2' x 29.5'
timber bridge)
1      EACH 5,000.00 5,000.00 4,500.00 4,500.00 8,500.00 8,500.00 15,000.00 15,000.00
202-02-G removal of surfacing & stabilized base 464.3    SQYD 10.00 4,643.00 8.00 3,714.40 25.00 11,607.50 10.00 4,643.00
203-05 excavation and embankment lump      LUMP 10,000.00 10,000.00 35,000.00 35,000.00 30,000.00 30,000.00 50,000.00 50,000.00
204-02 temporary hay or straw bales 20      EACH 10.00 200.00 10.00 200.00 20.00 400.00 100.00 2,000.00
204-03 temporary slope drains 200      LNFT 1.00 200.00 8.00 1,600.00 55.00 11,000.00 10.00 2,000.00
204-05-A temporary sediment check dams (hay) 16      EACH 200.00 3,200.00 85.00 1,360.00 200.00 3,200.00 250.00 4,000.00
204-06 temporary silt fencing 900      LNFT 1.00 900.00 1.50 1,350.00 2.75 2,475.00 6.00 5,400.00
302-01 class ii base course 178.2    CUYD 125.00 22,275.00 125.00 22,275.00 170.00 30,294.00 115.00 20,493.00
401-02 aggregate surface course (adjusted vehicular
measurement)
11      CUYD 125.00 1,375.00 100.00 1,100.00 440.00 4,840.00 115.00 1,265.00
502-01 superpave asphaltic concrete 138.8    TON 300.00 41,640.00 350.00 48,580.00 235.00 32,618.00 375.00 52,050.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
9.3    TON 300.00 2,790.00 450.00 4,185.00 340.00 3,162.00 500.00 4,650.00
701-05-G side drain pipe (18") 158      LNFT 45.00 7,110.00 75.00 11,850.00 70.00 11,060.00 60.00 9,480.00
701-05-I side drain pipe (24") 38      LNFT 91.00 3,458.00 85.00 3,230.00 100.00 3,800.00 95.00 3,610.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 60.00 6,000.00 75.00 7,500.00 60.00 6,000.00 75.00 7,500.00
704-09 guard rail anchor sections (turndown) 100.0    LNFT 35.00 3,500.00 50.00 5,000.00 30.00 3,000.00 40.00 4,000.00
705-01 barbed wire fence 354      LNFT 25.00 8,850.00 10.00 3,540.00 7.00 2,478.00 10.00 3,540.00
711-01-C riprap (30 lb,14") 121      SQYD 80.00 9,680.00 65.00 7,865.00 120.00 14,520.00 100.00 12,100.00
711-04 geotextile fabric 121      SQYD 1.00 121.00 8.00 968.00 4.50 544.50 10.00 1,210.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 16,000.00 16,000.00 25,000.00 25,000.00
716-01-A mulch (vegetative) 0.70   TON 3,000.00 2,100.00 550.00 385.00 500.00 350.00 3,000.00 2,100.00
717-01 seeding 15      LB 10.00 150.00 25.00 375.00 25.00 375.00 25.00 375.00
718-01 fertilizer 332      LB 5.00 1,660.00 1.00 332.00 1.00 332.00 3.00 996.00
726-01 bedding material 31.1    CUYD 100.00 3,110.00 100.00 3,110.00 120.00 3,732.00 115.00 3,576.50
727-01 mobilization lump      LUMP 51,000.00 51,000.00 50,000.00 50,000.00 65,000.00 65,000.00 125,000.00 125,000.00
729-16-B object marker assembly (type 2) 4      EACH 75.00 300.00 75.00 300.00 100.00 400.00 100.00 400.00
729-16-C object marker assembly (type 3) 8      EACH 75.00 600.00 85.00 680.00 120.00 960.00 150.00 1,200.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 25,000.00 25,000.00 35,000.00 35,000.00 15,000.00 15,000.00
804-01-B precast concrete piles (14") 522      LNFT 150.00 78,300.00 100.00 52,200.00 90.00 46,980.00 60.00 31,320.00
804-12 loading permanent piles 1      EACH 1.00 1.00 1,000.00 1,000.00 100.00 100.00 1.00 1.00
805-01-B class a concrete (box culvert headwalls) 17.66   CUYD 1,100.00 19,426.00 1,500.00 26,490.00 2,600.00 45,916.00 1,850.00 32,671.00
805-10 bridge superstructure & substructure (24" clr rdwy,
90 deg crossing)
2      SPAN 35,000.00 70,000.00 38,000.00 76,000.00 52,000.00 104,000.00 55,000.00 110,000.00
805-12-F reinforced concrete box culverts (5'x 4') 176.0    LNFT 340.00 59,840.00 500.00 88,000.00 570.00 100,320.00 650.00 114,400.00
806-01 deformed reinforcing steel 1,890      LB 2.00 3,780.00 2.50 4,725.00 2.50 4,725.00 2.00 3,780.00
S-101 concrete approach slabs (24" clr rdwy, 90 deg crossing)
(w/o asphalt)
2      EACH 7,500.00 15,000.00 12,000.00 24,000.00 11,800.00 23,600.00 12,500.00 25,000.00
                       
 CONTRACTOR TOTAL       494,209.00   549,414.40   651,989.00   753,760.50