| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W L BASS CONSTRUCTION INC. |
- 2 - GERACE CONSTRUCTION LLC |
- 3 - F. MILLER CONSTRUCTION LLC |
- 4 - GUINN BROTHERS, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
18,000.00 |
18,000.00 |
8,500.00 |
8,500.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
2,700.00 |
2,700.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 10+000.000;18' x 28.7'timber
bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
| 202-02-A-02 |
removal of bridge(sta. 10+000.000; 20.2' x 29.5'
timber bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
8,500.00 |
8,500.00 |
15,000.00 |
15,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
464.3 |
SQYD |
10.00 |
4,643.00 |
8.00 |
3,714.40 |
25.00 |
11,607.50 |
10.00 |
4,643.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
35,000.00 |
35,000.00 |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
10.00 |
200.00 |
10.00 |
200.00 |
20.00 |
400.00 |
100.00 |
2,000.00 |
| 204-03 |
temporary slope drains
|
200   |
LNFT |
1.00 |
200.00 |
8.00 |
1,600.00 |
55.00 |
11,000.00 |
10.00 |
2,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
16   |
EACH |
200.00 |
3,200.00 |
85.00 |
1,360.00 |
200.00 |
3,200.00 |
250.00 |
4,000.00 |
| 204-06 |
temporary silt fencing
|
900   |
LNFT |
1.00 |
900.00 |
1.50 |
1,350.00 |
2.75 |
2,475.00 |
6.00 |
5,400.00 |
| 302-01 |
class ii base course
|
178.2 |
CUYD |
125.00 |
22,275.00 |
125.00 |
22,275.00 |
170.00 |
30,294.00 |
115.00 |
20,493.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
11   |
CUYD |
125.00 |
1,375.00 |
100.00 |
1,100.00 |
440.00 |
4,840.00 |
115.00 |
1,265.00 |
| 502-01 |
superpave asphaltic concrete
|
138.8 |
TON |
300.00 |
41,640.00 |
350.00 |
48,580.00 |
235.00 |
32,618.00 |
375.00 |
52,050.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
9.3 |
TON |
300.00 |
2,790.00 |
450.00 |
4,185.00 |
340.00 |
3,162.00 |
500.00 |
4,650.00 |
| 701-05-G |
side drain pipe (18")
|
158   |
LNFT |
45.00 |
7,110.00 |
75.00 |
11,850.00 |
70.00 |
11,060.00 |
60.00 |
9,480.00 |
| 701-05-I |
side drain pipe (24")
|
38   |
LNFT |
91.00 |
3,458.00 |
85.00 |
3,230.00 |
100.00 |
3,800.00 |
95.00 |
3,610.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
75.00 |
7,500.00 |
60.00 |
6,000.00 |
75.00 |
7,500.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
35.00 |
3,500.00 |
50.00 |
5,000.00 |
30.00 |
3,000.00 |
40.00 |
4,000.00 |
| 705-01 |
barbed wire fence
|
354   |
LNFT |
25.00 |
8,850.00 |
10.00 |
3,540.00 |
7.00 |
2,478.00 |
10.00 |
3,540.00 |
| 711-01-C |
riprap (30 lb,14")
|
121   |
SQYD |
80.00 |
9,680.00 |
65.00 |
7,865.00 |
120.00 |
14,520.00 |
100.00 |
12,100.00 |
| 711-04 |
geotextile fabric
|
121   |
SQYD |
1.00 |
121.00 |
8.00 |
968.00 |
4.50 |
544.50 |
10.00 |
1,210.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
25,000.00 |
25,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.70 |
TON |
3,000.00 |
2,100.00 |
550.00 |
385.00 |
500.00 |
350.00 |
3,000.00 |
2,100.00 |
| 717-01 |
seeding
|
15   |
LB |
10.00 |
150.00 |
25.00 |
375.00 |
25.00 |
375.00 |
25.00 |
375.00 |
| 718-01 |
fertilizer
|
332   |
LB |
5.00 |
1,660.00 |
1.00 |
332.00 |
1.00 |
332.00 |
3.00 |
996.00 |
| 726-01 |
bedding material
|
31.1 |
CUYD |
100.00 |
3,110.00 |
100.00 |
3,110.00 |
120.00 |
3,732.00 |
115.00 |
3,576.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
51,000.00 |
51,000.00 |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
125,000.00 |
125,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
75.00 |
300.00 |
75.00 |
300.00 |
100.00 |
400.00 |
100.00 |
400.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
85.00 |
680.00 |
120.00 |
960.00 |
150.00 |
1,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
15,000.00 |
15,000.00 |
| 804-01-B |
precast concrete piles (14")
|
522   |
LNFT |
150.00 |
78,300.00 |
100.00 |
52,200.00 |
90.00 |
46,980.00 |
60.00 |
31,320.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
1.00 |
1.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
17.66 |
CUYD |
1,100.00 |
19,426.00 |
1,500.00 |
26,490.00 |
2,600.00 |
45,916.00 |
1,850.00 |
32,671.00 |
| 805-10 |
bridge superstructure & substructure (24" clr rdwy,
90 deg crossing) |
2   |
SPAN |
35,000.00 |
70,000.00 |
38,000.00 |
76,000.00 |
52,000.00 |
104,000.00 |
55,000.00 |
110,000.00 |
| 805-12-F |
reinforced concrete box culverts (5'x 4')
|
176.0 |
LNFT |
340.00 |
59,840.00 |
500.00 |
88,000.00 |
570.00 |
100,320.00 |
650.00 |
114,400.00 |
| 806-01 |
deformed reinforcing steel
|
1,890   |
LB |
2.00 |
3,780.00 |
2.50 |
4,725.00 |
2.50 |
4,725.00 |
2.00 |
3,780.00 |
| S-101 |
concrete approach slabs (24" clr rdwy, 90 deg crossing)
(w/o asphalt) |
2   |
EACH |
7,500.00 |
15,000.00 |
12,000.00 |
24,000.00 |
11,800.00 |
23,600.00 |
12,500.00 |
25,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
494,209.00 |
|
549,414.40 |
|
651,989.00 |
|
753,760.50 |
|