DBE GOAL FED
Lead Project: 853-10-0016
Parish: TANGIPAHOA
Routes: LA 1040
Description: REALIGNMENT OF LA 1040
Type Const: grading, drainage structures, class ii base course, lime treatment, superpave asphaltic
concrete pavement, portland cement concrete pavement, and related work.
Estimated Construction Cost: $2,034,732.32
 
RankLicenseBidderConstruction Bid
1 12198 BYRON E. TALBOT CONTRACTOR, INC. $1,508,076.11
2 14807 RICHARD PRICE CONTRACTING CO, LLC $1,732,990.86
3 38610 THREE C'S PROPERTIES INC $1,748,831.98
4 39580 GERACE CONSTRUCTION LLC $1,855,698.90
5 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,984,945.26
6 48896 COMMAND CONSTRUCTION INDUSTRIES LLC $2,123,123.00
7 00046 BARBER BROS. CONTRACTING CO., L.L.C $2,758,926.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
BYRON E. TALBOT CONTRACTOR, INC.
- 2 -
RICHARD PRICE CONTRACTING CO, LLC
- 3 -
THREE C'S PROPERTIES INC
- 4 -
GERACE CONSTRUCTION LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 65,000.00 65,000.00 46,500.00 46,500.00 60,000.00 60,000.00 110,000.00 110,000.00
202-01 removal of structures & obstructions lump      LUMP 5,500.00 5,500.00 25,000.00 25,000.00 6,000.00 6,000.00 3,500.00 3,500.00
202-02-D removal of concrete walks & drives 181      SQYD 3.75 678.75 6.00 1,086.00 7.50 1,357.50 10.00 1,810.00
202-02-E removal of concrete curbs 300.0    LNFT 1.50 450.00 6.00 1,800.00 4.50 1,350.00 5.00 1,500.00
202-02-G removal of surfacing & stabilized base 1,122.4    SQYD 11.75 13,188.20 4.00 4,489.60 3.00 3,367.20 5.00 5,612.00
202-02-01 removal of house (sta. 109+70; 3,300 sqft with brick
veneer)
1      EACH 10,000.00 10,000.00 6,000.00 6,000.00 9,000.00 9,000.00 12,000.00 12,000.00
202-02-02 removal of house (sta. 110+40; 2,500 sqft with brick
veneer)
1      EACH 10,000.00 10,000.00 6,000.00 6,000.00 8,000.00 8,000.00 12,000.00 12,000.00
202-02-03 removal of concrete drainage inlet structure (sta.
123+48)
1      EACH 1,100.00 1,100.00 2,500.00 2,500.00 1,500.00 1,500.00 3,000.00 3,000.00
203-02 drainage excavation 60      CUYD 4.50 270.00 20.00 1,200.00 23.50 1,410.00 30.00 1,800.00
203-05 excavation and embankment lump      LUMP 40,000.00 40,000.00 54,000.00 54,000.00 36,000.00 36,000.00 50,000.00 50,000.00
204-02 temporary hay or straw bales 350      EACH 9.35 3,272.50 25.00 8,750.00 13.00 4,550.00 10.00 3,500.00
204-06 temporary silt fencing 6,300      LNFT 2.25 14,175.00 3.00 18,900.00 0.75 4,725.00 1.50 9,450.00
302-02-E class ii base course (10" thick) 9,815.3    SQYD 21.85 214,464.31 19.80 194,342.94 17.50 171,767.75 23.00 225,751.90
304-05 lime treatment (type e) 150.00   TON 230.00 34,500.00 231.00 34,650.00 470.00 70,500.00 230.00 34,500.00
401-02 aggregate surface course (adjusted vehicular
measurement)
20      CUYD 70.00 1,400.00 117.00 2,340.00 58.75 1,175.00 100.00 2,000.00
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 69.75 6,975.00 90.00 9,000.00 53.75 5,375.00 60.00 6,000.00
502-01 superpave asphaltic concrete 745.5    TON 135.00 100,642.50 150.00 111,825.00 130.00 96,915.00 150.00 111,825.00
509-01 cold planing asphaltic pavement 369      SQYD 8.80 3,247.20 27.00 9,963.00 23.50 8,671.50 25.00 9,225.00
509-02 contractor retained reclaimed asphaltic pavement - 21      CUYD 5.00 - 105.00 5.75 - 120.75 5.00 - 105.00 5.00 - 105.00
601-01-G portland cement concrete pavement (8" thick) 8,279.6    SQYD 48.75 403,630.50 56.25 465,727.50 68.00 563,012.80 55.00 455,378.00
601-04 portland cement concrete pavement coring 10      EACH 55.00 550.00 150.00 1,500.00 72.00 720.00 300.00 3,000.00
701-03-F storm drain pipe (15" rcp/pcp) 863      LNFT 29.00 25,027.00 37.50 32,362.50 38.50 33,225.50 65.00 56,095.00
701-03-F/G-01 storm drain pipe (15" pcp or 18" cmp)(outfall) 11      LNFT 30.00 330.00 70.00 770.00 47.00 517.00 100.00 1,100.00
701-03-G storm drain pipe (18" rcp/pcp) 421      LNFT 32.00 13,472.00 44.75 18,839.75 45.50 19,155.50 65.00 27,365.00
701-03-I storm drain pipe (24" rcp/pcp) 744      LNFT 52.00 38,688.00 60.25 44,826.00 57.00 42,408.00 75.00 55,800.00
701-04-A storm drain pipe arch (15" equiv. rcpa) 290      LNFT 39.00 11,310.00 52.00 15,080.00 77.00 22,330.00 65.00 18,850.00
701-04-A-01 storm drain pipe arch (15" equiv. cmpa)(outfall) 138      LNFT 37.25 5,140.50 46.00 6,348.00 76.00 10,488.00 60.00 8,280.00
701-04-J storm drain pipe arch (60" equiv. rcpa) 279      LNFT 213.00 59,427.00 230.00 64,170.00 265.00 73,935.00 250.00 69,750.00
701-04-L storm drain pipe arch (72" equiv. rcpa) 102      LNFT 305.00 31,110.00 320.00 32,640.00 320.00 32,640.00 325.00 33,150.00
701-05-G side drain pipe (18") 52      LNFT 37.50 1,950.00 44.50 2,314.00 56.00 2,912.00 70.00 3,640.00
701-09 fabricating pipe fittings 1      EACH 275.00 275.00 1,700.00 1,700.00 1,300.00 1,300.00 1,500.00 1,500.00
702-02 manholes (mh-12.5x9) 1      EACH 16,000.00 16,000.00 17,700.00 17,700.00 14,000.00 14,000.00 10,000.00 10,000.00
702-03 catch basins (cb-sd08) 1      EACH 9,000.00 9,000.00 23,200.00 23,200.00 18,000.00 18,000.00 11,000.00 11,000.00
702-03-A catch basins (cb-01) 2      EACH 1,665.00 3,330.00 2,800.00 5,600.00 2,500.00 5,000.00 2,500.00 5,000.00
702-03-C catch basins (cb-06) 23      EACH 2,400.00 55,200.00 3,200.00 73,600.00 2,800.00 64,400.00 4,000.00 92,000.00
702-03-F catch basins (cb-08) 6      EACH 5,200.00 31,200.00 7,000.00 42,000.00 4,800.00 28,800.00 6,000.00 36,000.00
702-03-I catch basins (cb-04) 12      EACH 1,000.00 12,000.00 1,850.00 22,200.00 1,800.00 21,600.00 1,300.00 15,600.00
702-04-B adjusting catch basins 3      EACH 500.00 1,500.00 700.00 2,100.00 1,000.00 3,000.00 800.00 2,400.00
703-03 perforated pipe underdrains 2,938      LNFT 9.00 26,442.00 7.00 20,566.00 7.00 20,566.00 14.00 41,132.00
706-02-C concrete drive (6" thick) 132.1    SQYD 58.85 7,774.09 75.00 9,907.50 75.00 9,907.50 65.00 8,586.50
706-03-C incidental concrete paving (6" thick) 228.7    SQYD 64.00 14,636.80 87.00 19,896.90 70.00 16,009.00 45.00 10,291.50
707-01 concrete curb 3,206.4    LNFT 4.60 14,749.44 9.35 29,979.84 8.00 25,651.20 8.00 25,651.20
707-03 combination concrete curb & gutter 454.0    LNFT 20.60 9,352.40 26.25 11,917.50 28.00 12,712.00 25.00 11,350.00
708-01 right-of-way monument 26      EACH 7.50 195.00 250.00 6,500.00 110.00 2,860.00 150.00 3,900.00
708-02 right-of-way monument witness post 26      EACH 18.75 487.50 220.00 5,720.00 60.00 1,560.00 65.00 1,690.00
710-01 flowable fill 2      CUYD 110.00 220.00 400.00 800.00 250.00 500.00 150.00 300.00
711-01-C riprap (30 lb, 12" thick) 25      SQYD 45.00 1,125.00 125.00 3,125.00 100.00 2,500.00 65.00 1,625.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 9,500.00 9,500.00 7,500.00 7,500.00 16,000.00 16,000.00
713-02-E temporary pavement markings (24" width) 50      LNFT 1.35 67.50 1.20 60.00 1.25 62.50 1.50 75.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
0.750  MILE 355.00 266.25 353.50 265.13 340.00 255.00 400.00 300.00
713-04-A temporary pavement markings (solid line)(4" width) 1.500  MILE 836.00 1,254.00 353.50 530.25 780.00 1,170.00 900.00 1,350.00
713-05-A temporary pavement legends and symbols (arrow) 1      EACH 55.00 55.00 88.25 88.25 52.00 52.00 60.00 60.00
713-05-B temporary pavement legends and symbols (double arrow) 1      EACH 88.00 88.00 117.75 117.75 84.00 84.00 100.00 100.00
727-01 mobilization lump      LUMP 80,000.00 80,000.00 85,000.00 85,000.00 80,000.00 80,000.00 75,000.00 75,000.00
731-02 reflectorized raised pavement markers 485      EACH 5.61 2,720.85 6.20 3,007.00 5.25 2,546.25 6.00 2,910.00
732-01-E plastic pavement striping (24" width) 460      LNFT 4.35 2,001.00 5.30 2,438.00 4.00 1,840.00 5.00 2,300.00
732-02-A plastic pavement striping (solid line) (4" width) 2.988  MILE 3,190.00 9,531.72 2,820.50 8,427.65 3,000.00 8,964.00 3,500.00 10,458.00
732-02-C plastic pavement striping (solid line) (8" width) 0.126  MILE 6,400.00 806.40 7,051.50 888.49 6,000.00 756.00 7,000.00 882.00
732-03-A plastic pavement striping (broken line)(4" width) 1.121  MILE 825.00 924.83 942.00 1,055.98 775.00 868.78 800.00 896.80
732-03-C plastic pavement striping (broken line)(8" width) 0.119  MILE 5,230.00 622.37 1,425.00 169.58 5,000.00 595.00 6,000.00 714.00
732-04-A plastic pavement legends & symbols (arrow) 43      EACH 220.00 9,460.00 235.50 10,126.50 210.00 9,030.00 250.00 10,750.00
732-04-B plastic pavement legends & symbols (double arrow) 4      EACH 240.00 960.00 294.50 1,178.00 230.00 920.00 250.00 1,000.00
732-04-C plastic pavement legends & symbols (only) 18      EACH 230.00 4,140.00 241.50 4,347.00 220.00 3,960.00 250.00 4,500.00
732-05 removal of existing markings 1.000  MILE 5,885.00 5,885.00 5,900.00 5,900.00 5,500.00 5,500.00 6,500.00 6,500.00
739-01 hydro-seeding 1.75   ACRE 1,800.00 3,150.00 1,300.00 2,275.00 4,300.00 7,525.00 3,000.00 5,250.00
740-01 construction layout lump      LUMP 27,000.00 27,000.00 40,000.00 40,000.00 34,000.00 34,000.00 75,000.00 75,000.00
740-02 utility oversight and coordination lump      LUMP 3,000.00 3,000.00 500.00 500.00 3,500.00 3,500.00 10,000.00 10,000.00
742-04 casing (8" diameter)(concrete) 5      LNFT 50.00 250.00 100.00 500.00 300.00 1,500.00 150.00 750.00
S-001 cleaning existing ditches 150      LNFT 6.75 1,012.50 14.00 2,100.00 10.50 1,575.00 10.00 1,500.00
S-002 saw cutting of portland cement concrete pavement
and/or asphaltic concrete pavement (full depth)
2,400      INFT 1.50 3,600.00 5.50 13,200.00 1.40 3,360.00 1.50 3,600.00
S-003 dynamic message sign unit 4      EACH 5,600.00 22,400.00 5,500.00 22,000.00 8,000.00 32,000.00 3,000.00 12,000.00
                       
 CONTRACTOR TOTAL       1,508,076.11   1,732,990.86   1,748,831.98   1,855,698.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
BOH BROS. CONSTRUCTION CO., LLC.
- 6 -
COMMAND CONSTRUCTION INDUSTRIES LLC
- 7 -
BARBER BROS. CONTRACTING CO., L.L.C

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 125,000.00 125,000.00 100,000.00 100,000.00 250,000.00 250,000.00    
202-01 removal of structures & obstructions lump      LUMP 3,300.00 3,300.00 50,000.00 50,000.00 50,000.00 50,000.00    
202-02-D removal of concrete walks & drives 181      SQYD 7.00 1,267.00 10.00 1,810.00 35.00 6,335.00    
202-02-E removal of concrete curbs 300.0    LNFT 5.00 1,500.00 4.00 1,200.00 10.00 3,000.00    
202-02-G removal of surfacing & stabilized base 1,122.4    SQYD 11.00 12,346.40 6.00 6,734.40 10.00 11,224.00    
202-02-01 removal of house (sta. 109+70; 3,300 sqft with brick
veneer)
1      EACH 19,000.00 19,000.00 10,000.00 10,000.00 25,000.00 25,000.00    
202-02-02 removal of house (sta. 110+40; 2,500 sqft with brick
veneer)
1      EACH 19,000.00 19,000.00 10,000.00 10,000.00 25,000.00 25,000.00    
202-02-03 removal of concrete drainage inlet structure (sta.
123+48)
1      EACH 1,750.00 1,750.00 250.00 250.00 10,000.00 10,000.00    
203-02 drainage excavation 60      CUYD 22.00 1,320.00 20.00 1,200.00 100.00 6,000.00    
203-05 excavation and embankment lump      LUMP 53,000.00 53,000.00 50,000.00 50,000.00 150,000.00 150,000.00    
204-02 temporary hay or straw bales 350      EACH 16.00 5,600.00 10.00 3,500.00 20.00 7,000.00    
204-06 temporary silt fencing 6,300      LNFT 2.00 12,600.00 2.00 12,600.00 1.50 9,450.00    
302-02-E class ii base course (10" thick) 9,815.3    SQYD 26.00 255,197.80 25.00 245,382.50 40.00 392,612.00    
304-05 lime treatment (type e) 150.00   TON 1.00 150.00 350.00 52,500.00 300.00 45,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
20      CUYD 110.00 2,200.00 200.00 4,000.00 120.00 2,400.00    
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 90.00 9,000.00 50.00 5,000.00 60.00 6,000.00    
502-01 superpave asphaltic concrete 745.5    TON 150.00 111,825.00 175.00 130,462.50 120.00 89,460.00    
509-01 cold planing asphaltic pavement 369      SQYD 25.00 9,225.00 25.00 9,225.00 15.00 5,535.00    
509-02 contractor retained reclaimed asphaltic pavement - 21      CUYD 1.00 - 21.00 5.00 - 105.00 0.00 0.00    
601-01-G portland cement concrete pavement (8" thick) 8,279.6    SQYD 45.00 372,582.00 58.00 480,216.80 60.00 496,776.00    
601-04 portland cement concrete pavement coring 10      EACH 115.00 1,150.00 200.00 2,000.00 300.00 3,000.00    
701-03-F storm drain pipe (15" rcp/pcp) 863      LNFT 47.00 40,561.00 60.00 51,780.00 50.00 43,150.00    
701-03-F/G-01 storm drain pipe (15" pcp or 18" cmp)(outfall) 11      LNFT 72.00 792.00 70.00 770.00 100.00 1,100.00    
701-03-G storm drain pipe (18" rcp/pcp) 421      LNFT 44.00 18,524.00 70.00 29,470.00 55.00 23,155.00    
701-03-I storm drain pipe (24" rcp/pcp) 744      LNFT 66.00 49,104.00 75.00 55,800.00 70.00 52,080.00    
701-04-A storm drain pipe arch (15" equiv. rcpa) 290      LNFT 67.00 19,430.00 75.00 21,750.00 65.00 18,850.00    
701-04-A-01 storm drain pipe arch (15" equiv. cmpa)(outfall) 138      LNFT 57.00 7,866.00 80.00 11,040.00 75.00 10,350.00    
701-04-J storm drain pipe arch (60" equiv. rcpa) 279      LNFT 275.00 76,725.00 250.00 69,750.00 300.00 83,700.00    
701-04-L storm drain pipe arch (72" equiv. rcpa) 102      LNFT 350.00 35,700.00 300.00 30,600.00 450.00 45,900.00    
701-05-G side drain pipe (18") 52      LNFT 57.00 2,964.00 60.00 3,120.00 120.00 6,240.00    
701-09 fabricating pipe fittings 1      EACH 1,800.00 1,800.00 2,500.00 2,500.00 2,000.00 2,000.00    
702-02 manholes (mh-12.5x9) 1      EACH 14,000.00 14,000.00 4,000.00 4,000.00 25,000.00 25,000.00    
702-03 catch basins (cb-sd08) 1      EACH 16,500.00 16,500.00 7,500.00 7,500.00 25,000.00 25,000.00    
702-03-A catch basins (cb-01) 2      EACH 3,600.00 7,200.00 2,500.00 5,000.00 3,500.00 7,000.00    
702-03-C catch basins (cb-06) 23      EACH 3,800.00 87,400.00 3,500.00 80,500.00 4,000.00 92,000.00    
702-03-F catch basins (cb-08) 6      EACH 4,400.00 26,400.00 6,000.00 36,000.00 8,000.00 48,000.00    
702-03-I catch basins (cb-04) 12      EACH 3,300.00 39,600.00 1,750.00 21,000.00 2,000.00 24,000.00    
702-04-B adjusting catch basins 3      EACH 1,200.00 3,600.00 500.00 1,500.00 2,500.00 7,500.00    
703-03 perforated pipe underdrains 2,938      LNFT 15.00 44,070.00 10.00 29,380.00 10.00 29,380.00    
706-02-C concrete drive (6" thick) 132.1    SQYD 75.00 9,907.50 45.00 5,944.50 65.00 8,586.50    
706-03-C incidental concrete paving (6" thick) 228.7    SQYD 80.00 18,296.00 45.00 10,291.50 150.00 34,305.00    
707-01 concrete curb 3,206.4    LNFT 8.50 27,254.40 6.00 19,238.40 8.00 25,651.20    
707-03 combination concrete curb & gutter 454.0    LNFT 40.00 18,160.00 20.00 9,080.00 35.00 15,890.00    
708-01 right-of-way monument 26      EACH 165.00 4,290.00 200.00 5,200.00 350.00 9,100.00    
708-02 right-of-way monument witness post 26      EACH 11.00 286.00 200.00 5,200.00 400.00 10,400.00    
710-01 flowable fill 2      CUYD 150.00 300.00 400.00 800.00 500.00 1,000.00    
711-01-C riprap (30 lb, 12" thick) 25      SQYD 117.00 2,925.00 150.00 3,750.00 120.00 3,000.00    
713-01 temporary signs & barricades lump      LUMP 65,000.00 65,000.00 50,000.00 50,000.00 100,000.00 100,000.00    
713-02-E temporary pavement markings (24" width) 50      LNFT 1.00 50.00 1.00 50.00 4.00 200.00    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
0.750  MILE 330.00 247.50 300.00 225.00 400.00 300.00    
713-04-A temporary pavement markings (solid line)(4" width) 1.500  MILE 330.00 495.00 300.00 450.00 350.00 525.00    
713-05-A temporary pavement legends and symbols (arrow) 1      EACH 82.00 82.00 100.00 100.00 85.00 85.00    
713-05-B temporary pavement legends and symbols (double arrow) 1      EACH 110.00 110.00 100.00 100.00 125.00 125.00    
727-01 mobilization lump      LUMP 197,000.00 197,000.00 250,000.00 250,000.00 275,000.00 275,000.00    
731-02 reflectorized raised pavement markers 485      EACH 5.50 2,667.50 6.00 2,910.00 6.00 2,910.00    
732-01-E plastic pavement striping (24" width) 460      LNFT 5.50 2,530.00 5.00 2,300.00 6.00 2,760.00    
732-02-A plastic pavement striping (solid line) (4" width) 2.988  MILE 2,600.00 7,768.80 2,700.00 8,067.60 3,000.00 8,964.00    
732-02-C plastic pavement striping (solid line) (8" width) 0.126  MILE 6,300.00 793.80 6,700.00 844.20 6,500.00 819.00    
732-03-A plastic pavement striping (broken line)(4" width) 1.121  MILE 880.00 986.48 800.00 896.80 1,000.00 1,121.00    
732-03-C plastic pavement striping (broken line)(8" width) 0.119  MILE 1,320.00 157.08 1,200.00 142.80 2,000.00 238.00    
732-04-A plastic pavement legends & symbols (arrow) 43      EACH 220.00 9,460.00 200.00 8,600.00 250.00 10,750.00    
732-04-B plastic pavement legends & symbols (double arrow) 4      EACH 275.00 1,100.00 250.00 1,000.00 300.00 1,200.00    
732-04-C plastic pavement legends & symbols (only) 18      EACH 225.00 4,050.00 200.00 3,600.00 250.00 4,500.00    
732-05 removal of existing markings 1.000  MILE 5,500.00 5,500.00 5,000.00 5,000.00 6,000.00 6,000.00    
739-01 hydro-seeding 1.75   ACRE 2,400.00 4,200.00 1,200.00 2,100.00 2,000.00 3,500.00    
740-01 construction layout lump      LUMP 55,000.00 55,000.00 50,000.00 50,000.00 50,000.00 50,000.00    
740-02 utility oversight and coordination lump      LUMP 5,000.00 5,000.00 24,246.00 24,246.00 15,000.00 15,000.00    
742-04 casing (8" diameter)(concrete) 5      LNFT 150.00 750.00 250.00 1,250.00 200.00 1,000.00    
S-001 cleaning existing ditches 150      LNFT 17.00 2,550.00 10.00 1,500.00 20.00 3,000.00    
S-002 saw cutting of portland cement concrete pavement
and/or asphaltic concrete pavement (full depth)
2,400      INFT 2.00 4,800.00 2.00 4,800.00 2.00 4,800.00    
S-003 dynamic message sign unit 4      EACH 6,000.00 24,000.00 2,000.00 8,000.00 5,000.00 20,000.00    
                       
 CONTRACTOR TOTAL       1,984,945.26   2,123,123.00   2,758,926.70    