| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PROGRESSIVE CONSTRUCTION CO., LLC. |
- 2 - T.L. CONSTRUCTION INC |
- 3 - SPECIALTY CONTRACTORS |
- 4 - GERACE CONSTRUCTION LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
32,000.00 |
32,000.00 |
25,000.00 |
25,000.00 |
68,000.00 |
68,000.00 |
19,000.00 |
19,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
7,500.00 |
7,500.00 |
14,000.00 |
14,000.00 |
7,500.00 |
7,500.00 |
| 203-01 |
general excavation
|
2,949   |
CUYD |
6.00 |
17,694.00 |
5.00 |
14,745.00 |
5.50 |
16,219.50 |
8.00 |
23,592.00 |
| 203-03 |
embankment
|
4,345   |
CUYD |
15.00 |
65,175.00 |
13.00 |
56,485.00 |
9.50 |
41,277.50 |
16.00 |
69,520.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
23   |
EACH |
120.00 |
2,760.00 |
250.00 |
5,750.00 |
100.00 |
2,300.00 |
100.00 |
2,300.00 |
| 204-06 |
temporary silt fencing
|
695   |
LNFT |
3.00 |
2,085.00 |
3.00 |
2,085.00 |
2.00 |
1,390.00 |
1.50 |
1,042.50 |
| 302-02-D-01 |
class ii base course (8 1/2" thick) (crushed stone or
recycled pccp only) |
4,478.8 |
SQYD |
21.50 |
96,294.20 |
24.00 |
107,491.20 |
25.00 |
111,970.00 |
20.00 |
89,576.00 |
| 304-05 |
lime treatment (type e)
|
12.70 |
TON |
777.00 |
9,867.90 |
1,000.00 |
12,700.00 |
300.00 |
3,810.00 |
400.00 |
5,080.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
195   |
CUYD |
81.00 |
15,795.00 |
75.00 |
14,625.00 |
87.90 |
17,140.50 |
85.00 |
16,575.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
81.00 |
40,500.00 |
73.00 |
36,500.00 |
45.00 |
22,500.00 |
65.00 |
32,500.00 |
| 502-01 |
superpave asphaltic concrete
|
699.8 |
TON |
98.50 |
68,930.30 |
100.00 |
69,980.00 |
118.00 |
82,576.40 |
145.00 |
101,471.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
156.1 |
TON |
108.50 |
16,936.85 |
165.00 |
25,756.50 |
150.00 |
23,415.00 |
225.00 |
35,122.50 |
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
64   |
LNFT |
78.00 |
4,992.00 |
125.00 |
8,000.00 |
105.00 |
6,720.00 |
100.00 |
6,400.00 |
| 701-01-P/Q |
cross drain pipe (54" rcp/pcp or 60" cmp)
|
264   |
LNFT |
292.00 |
77,088.00 |
225.00 |
59,400.00 |
181.00 |
47,784.00 |
175.00 |
46,200.00 |
| 701-05-I |
side drain pipe (24")
|
125   |
LNFT |
52.50 |
6,562.50 |
75.00 |
9,375.00 |
73.00 |
9,125.00 |
75.00 |
9,375.00 |
| 705-02 |
combination mesh & barbed wire fence
|
175   |
LNFT |
12.00 |
2,100.00 |
20.00 |
3,500.00 |
10.00 |
1,750.00 |
7.00 |
1,225.00 |
| 708-01 |
right-of-way monument
|
15   |
EACH |
150.00 |
2,250.00 |
150.00 |
2,250.00 |
120.00 |
1,800.00 |
175.00 |
2,625.00 |
| 708-02 |
right-of-way monument witness post
|
15   |
EACH |
150.00 |
2,250.00 |
150.00 |
2,250.00 |
120.00 |
1,800.00 |
65.00 |
975.00 |
| 712-02 |
sacked concrete revetment
|
22   |
SQYD |
165.00 |
3,630.00 |
100.00 |
2,200.00 |
344.00 |
7,568.00 |
250.00 |
5,500.00 |
| 712-04 |
flexible revetment
|
58   |
SQYD |
165.00 |
9,570.00 |
65.00 |
3,770.00 |
35.00 |
2,030.00 |
100.00 |
5,800.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
12,000.00 |
12,000.00 |
6,000.00 |
6,000.00 |
7,500.00 |
7,500.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
11   |
LNFT |
1.10 |
12.10 |
1.25 |
13.75 |
100.00 |
1,100.00 |
1.25 |
13.75 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.592 |
MILE |
5,780.00 |
3,421.76 |
1,000.00 |
592.00 |
300.00 |
177.60 |
400.00 |
236.80 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.208 |
MILE |
330.00 |
68.64 |
1,200.00 |
249.60 |
330.00 |
68.64 |
400.00 |
83.20 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
0.962 |
MILE |
660.00 |
634.92 |
1,200.00 |
1,154.40 |
880.00 |
846.56 |
700.00 |
673.40 |
| 716-01-A |
mulch (vegetative)
|
6.4 |
TON |
525.00 |
3,360.00 |
500.00 |
3,200.00 |
2,000.00 |
12,800.00 |
500.00 |
3,200.00 |
| 717-01 |
seeding
|
258   |
LB |
8.00 |
2,064.00 |
10.00 |
2,580.00 |
10.00 |
2,580.00 |
10.00 |
2,580.00 |
| 718-01 |
fertilizer
|
3,220   |
LB |
0.55 |
1,771.00 |
0.50 |
1,610.00 |
1.00 |
3,220.00 |
0.75 |
2,415.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
3,826   |
SQYD |
1.30 |
4,973.80 |
1.35 |
5,165.10 |
1.75 |
6,695.50 |
1.50 |
5,739.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
150   |
SQYD |
3.10 |
465.00 |
8.00 |
1,200.00 |
10.00 |
1,500.00 |
2.75 |
412.50 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
100   |
SQYD |
3.10 |
310.00 |
10.00 |
1,000.00 |
10.00 |
1,000.00 |
2.75 |
275.00 |
| 726-01 |
bedding material
|
178.2 |
CUYD |
80.50 |
14,345.10 |
80.00 |
14,256.00 |
90.00 |
16,038.00 |
85.00 |
15,147.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
130.00 |
260.00 |
150.00 |
300.00 |
100.00 |
200.00 |
125.00 |
250.00 |
| 731-02 |
reflectorized raised pavement markers
|
41   |
EACH |
11.00 |
451.00 |
12.00 |
492.00 |
11.00 |
451.00 |
12.00 |
492.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
11   |
LNFT |
11.00 |
121.00 |
12.00 |
132.00 |
11.00 |
121.00 |
12.00 |
132.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.962 |
MILE |
5,500.00 |
5,291.00 |
6,000.00 |
5,772.00 |
5,500.00 |
5,291.00 |
6,000.00 |
5,772.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.208 |
MILE |
1,100.00 |
228.80 |
2,000.00 |
416.00 |
1,100.00 |
228.80 |
1,200.00 |
249.60 |
| 735-01 |
mailboxes
|
3   |
EACH |
13.00 |
39.00 |
10.00 |
30.00 |
20.00 |
60.00 |
1.00 |
3.00 |
| 735-02 |
mailbox supports (single)
|
3   |
EACH |
118.00 |
354.00 |
150.00 |
450.00 |
165.00 |
495.00 |
350.00 |
1,050.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
6,000.00 |
6,000.00 |
13,000.00 |
13,000.00 |
12,000.00 |
12,000.00 |
| S-001 |
full depth sawcut in asphaltic concrete roadway
|
180   |
inft |
7.00 |
1,260.00 |
12.00 |
2,160.00 |
10.00 |
1,800.00 |
12.00 |
2,160.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
551,411.87 |
|
553,135.55 |
|
571,849.00 |
|
591,763.25 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - S.F.C. CONTRACT SERVICES, INC. |
C & J DIRT INC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 203-01 |
general excavation
|
2,949   |
CUYD |
6.00 |
17,694.00 |
3.00 |
8,847.00 |
|
|
|
|
| 203-03 |
embankment
|
4,345   |
CUYD |
17.50 |
76,037.50 |
11.00 |
47,795.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
23   |
EACH |
150.00 |
3,450.00 |
100.00 |
2,300.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
695   |
LNFT |
4.00 |
2,780.00 |
4.00 |
2,780.00 |
|
|
|
|
| 302-02-D-01 |
class ii base course (8 1/2" thick) (crushed stone or
recycled pccp only) |
4,478.8 |
SQYD |
22.00 |
98,533.60 |
30.00 |
134,364.00 |
|
|
|
|
| 304-05 |
lime treatment (type e)
|
12.70 |
TON |
360.00 |
4,572.00 |
900.00 |
11,430.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
195   |
CUYD |
92.00 |
17,940.00 |
50.00 |
9,750.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
92.00 |
46,000.00 |
50.00 |
25,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
699.8 |
TON |
121.00 |
84,675.80 |
100.00 |
69,980.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
156.1 |
TON |
215.00 |
33,561.50 |
175.00 |
27,317.50 |
|
|
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
64   |
LNFT |
60.00 |
3,840.00 |
50.00 |
3,200.00 |
|
|
|
|
| 701-01-P/Q |
cross drain pipe (54" rcp/pcp or 60" cmp)
|
264   |
LNFT |
141.00 |
37,224.00 |
175.00 |
46,200.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
125   |
LNFT |
69.00 |
8,625.00 |
50.00 |
6,250.00 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
175   |
LNFT |
11.00 |
1,925.00 |
10.00 |
1,750.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
15   |
EACH |
150.00 |
2,250.00 |
150.00 |
2,250.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
15   |
EACH |
150.00 |
2,250.00 |
40.00 |
600.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
22   |
SQYD |
208.00 |
4,576.00 |
100.00 |
2,200.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
58   |
SQYD |
48.00 |
2,784.00 |
75.00 |
4,350.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,000.00 |
6,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
11   |
LNFT |
5.00 |
55.00 |
13.00 |
143.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.592 |
MILE |
3,700.00 |
2,190.40 |
800.00 |
473.60 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.208 |
MILE |
900.00 |
187.20 |
500.00 |
104.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
0.962 |
MILE |
1,000.00 |
962.00 |
800.00 |
769.60 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
6.4 |
TON |
1,000.00 |
6,400.00 |
500.00 |
3,200.00 |
|
|
|
|
| 717-01 |
seeding
|
258   |
LB |
13.00 |
3,354.00 |
9.00 |
2,322.00 |
|
|
|
|
| 718-01 |
fertilizer
|
3,220   |
LB |
0.80 |
2,576.00 |
1.00 |
3,220.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
3,826   |
SQYD |
5.00 |
19,130.00 |
1.50 |
5,739.00 |
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
150   |
SQYD |
2.00 |
300.00 |
3.00 |
450.00 |
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
100   |
SQYD |
2.00 |
200.00 |
2.80 |
280.00 |
|
|
|
|
| 726-01 |
bedding material
|
178.2 |
CUYD |
90.00 |
16,038.00 |
75.00 |
13,365.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
7,500.00 |
7,500.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
60.00 |
120.00 |
80.00 |
160.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
41   |
EACH |
11.00 |
451.00 |
20.00 |
820.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
11   |
LNFT |
5.00 |
55.00 |
20.00 |
220.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.962 |
MILE |
5,000.00 |
4,810.00 |
6,000.00 |
5,772.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.208 |
MILE |
2,000.00 |
416.00 |
1,200.00 |
249.60 |
|
|
|
|
| 735-01 |
mailboxes
|
3   |
EACH |
120.00 |
360.00 |
50.00 |
150.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
3   |
EACH |
120.00 |
360.00 |
50.00 |
150.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
full depth sawcut in asphaltic concrete roadway
|
180   |
inft |
2.00 |
360.00 |
6.00 |
1,080.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
606,043.00 |
|
IRREGULAR |
|
|
|
|
|