Letting of 4/22/2009 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 369-02-0016
Parish: RAPIDES
Routes: LA 1203
Description: LA 1203 ROADWAY FLOODING PROJECT
Type Const: clearing and grubbing, grading, base course, asphaltic concrete roadway, drainage
structures, and earthwork
Estimated Construction Cost: $492,782.01
 
RankLicenseBidderConstruction Bid
1 30774 PROGRESSIVE CONSTRUCTION CO., LLC. $551,411.87
2 35849 T.L. CONSTRUCTION INC $553,135.55
3 33685 SPECIALTY CONTRACTORS $571,849.00
4 39580 GERACE CONSTRUCTION LLC $591,763.25
5 31970 S.F.C. CONTRACT SERVICES, INC. $606,043.00
 39438 C & J DIRT INC IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
PROGRESSIVE CONSTRUCTION CO., LLC.
- 2 -
T.L. CONSTRUCTION INC
- 3 -
SPECIALTY CONTRACTORS
- 4 -
GERACE CONSTRUCTION LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 32,000.00 32,000.00 25,000.00 25,000.00 68,000.00 68,000.00 19,000.00 19,000.00
202-01 removal of structures & obstructions lump      LUMP 3,000.00 3,000.00 7,500.00 7,500.00 14,000.00 14,000.00 7,500.00 7,500.00
203-01 general excavation 2,949      CUYD 6.00 17,694.00 5.00 14,745.00 5.50 16,219.50 8.00 23,592.00
203-03 embankment 4,345      CUYD 15.00 65,175.00 13.00 56,485.00 9.50 41,277.50 16.00 69,520.00
204-05-A temporary sediment check dams (hay) 23      EACH 120.00 2,760.00 250.00 5,750.00 100.00 2,300.00 100.00 2,300.00
204-06 temporary silt fencing 695      LNFT 3.00 2,085.00 3.00 2,085.00 2.00 1,390.00 1.50 1,042.50
302-02-D-01 class ii base course (8 1/2" thick) (crushed stone or
recycled pccp only)
4,478.8    SQYD 21.50 96,294.20 24.00 107,491.20 25.00 111,970.00 20.00 89,576.00
304-05 lime treatment (type e) 12.70   TON 777.00 9,867.90 1,000.00 12,700.00 300.00 3,810.00 400.00 5,080.00
401-02 aggregate surface course (adjusted vehicular
measurement)
195      CUYD 81.00 15,795.00 75.00 14,625.00 87.90 17,140.50 85.00 16,575.00
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 81.00 40,500.00 73.00 36,500.00 45.00 22,500.00 65.00 32,500.00
502-01 superpave asphaltic concrete 699.8    TON 98.50 68,930.30 100.00 69,980.00 118.00 82,576.40 145.00 101,471.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
156.1    TON 108.50 16,936.85 165.00 25,756.50 150.00 23,415.00 225.00 35,122.50
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 64      LNFT 78.00 4,992.00 125.00 8,000.00 105.00 6,720.00 100.00 6,400.00
701-01-P/Q cross drain pipe (54" rcp/pcp or 60" cmp) 264      LNFT 292.00 77,088.00 225.00 59,400.00 181.00 47,784.00 175.00 46,200.00
701-05-I side drain pipe (24") 125      LNFT 52.50 6,562.50 75.00 9,375.00 73.00 9,125.00 75.00 9,375.00
705-02 combination mesh & barbed wire fence 175      LNFT 12.00 2,100.00 20.00 3,500.00 10.00 1,750.00 7.00 1,225.00
708-01 right-of-way monument 15      EACH 150.00 2,250.00 150.00 2,250.00 120.00 1,800.00 175.00 2,625.00
708-02 right-of-way monument witness post 15      EACH 150.00 2,250.00 150.00 2,250.00 120.00 1,800.00 65.00 975.00
712-02 sacked concrete revetment 22      SQYD 165.00 3,630.00 100.00 2,200.00 344.00 7,568.00 250.00 5,500.00
712-04 flexible revetment 58      SQYD 165.00 9,570.00 65.00 3,770.00 35.00 2,030.00 100.00 5,800.00
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 12,000.00 12,000.00 6,000.00 6,000.00 7,500.00 7,500.00
713-02-E temporary pavement markings (24" width) 11      LNFT 1.10 12.10 1.25 13.75 100.00 1,100.00 1.25 13.75
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
0.592  MILE 5,780.00 3,421.76 1,000.00 592.00 300.00 177.60 400.00 236.80
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
0.208  MILE 330.00 68.64 1,200.00 249.60 330.00 68.64 400.00 83.20
713-04-A temporary pavement markings (solid line)(4" width) 0.962  MILE 660.00 634.92 1,200.00 1,154.40 880.00 846.56 700.00 673.40
716-01-A mulch (vegetative) 6.4    TON 525.00 3,360.00 500.00 3,200.00 2,000.00 12,800.00 500.00 3,200.00
717-01 seeding 258      LB 8.00 2,064.00 10.00 2,580.00 10.00 2,580.00 10.00 2,580.00
718-01 fertilizer 3,220      LB 0.55 1,771.00 0.50 1,610.00 1.00 3,220.00 0.75 2,415.00
720-01-A erosion control system, slope protection (type a) 3,826      SQYD 1.30 4,973.80 1.35 5,165.10 1.75 6,695.50 1.50 5,739.00
720-01-C erosion control system, flexible channel liner (type c) 150      SQYD 3.10 465.00 8.00 1,200.00 10.00 1,500.00 2.75 412.50
720-01-D erosion control system, flexible channel liner (type d) 100      SQYD 3.10 310.00 10.00 1,000.00 10.00 1,000.00 2.75 275.00
726-01 bedding material 178.2    CUYD 80.50 14,345.10 80.00 14,256.00 90.00 16,038.00 85.00 15,147.00
727-01 mobilization lump      LUMP 25,000.00 25,000.00 25,000.00 25,000.00 15,000.00 15,000.00 50,000.00 50,000.00
729-16-B object marker assembly (type 2) 2      EACH 130.00 260.00 150.00 300.00 100.00 200.00 125.00 250.00
731-02 reflectorized raised pavement markers 41      EACH 11.00 451.00 12.00 492.00 11.00 451.00 12.00 492.00
732-01-E plastic pavement striping (24" width) 11      LNFT 11.00 121.00 12.00 132.00 11.00 121.00 12.00 132.00
732-02-A plastic pavement striping (solid line) (4" width) 0.962  MILE 5,500.00 5,291.00 6,000.00 5,772.00 5,500.00 5,291.00 6,000.00 5,772.00
732-03-A plastic pavement striping (broken line)(4" width) 0.208  MILE 1,100.00 228.80 2,000.00 416.00 1,100.00 228.80 1,200.00 249.60
735-01 mailboxes 3      EACH 13.00 39.00 10.00 30.00 20.00 60.00 1.00 3.00
735-02 mailbox supports (single) 3      EACH 118.00 354.00 150.00 450.00 165.00 495.00 350.00 1,050.00
740-01 construction layout lump      LUMP 2,500.00 2,500.00 6,000.00 6,000.00 13,000.00 13,000.00 12,000.00 12,000.00
S-001 full depth sawcut in asphaltic concrete roadway 180      inft 7.00 1,260.00 12.00 2,160.00 10.00 1,800.00 12.00 2,160.00
                       
 CONTRACTOR TOTAL       551,411.87   553,135.55   571,849.00   591,763.25
 
Item Number Item Description Quantity Unit of Measure - 5 -
S.F.C. CONTRACT SERVICES, INC.

C & J DIRT INC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 25,000.00 25,000.00 10,000.00 10,000.00        
202-01 removal of structures & obstructions lump      LUMP 3,000.00 3,000.00 1,000.00 1,000.00        
203-01 general excavation 2,949      CUYD 6.00 17,694.00 3.00 8,847.00        
203-03 embankment 4,345      CUYD 17.50 76,037.50 11.00 47,795.00        
204-05-A temporary sediment check dams (hay) 23      EACH 150.00 3,450.00 100.00 2,300.00        
204-06 temporary silt fencing 695      LNFT 4.00 2,780.00 4.00 2,780.00        
302-02-D-01 class ii base course (8 1/2" thick) (crushed stone or
recycled pccp only)
4,478.8    SQYD 22.00 98,533.60 30.00 134,364.00        
304-05 lime treatment (type e) 12.70   TON 360.00 4,572.00 900.00 11,430.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
195      CUYD 92.00 17,940.00 50.00 9,750.00        
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 92.00 46,000.00 50.00 25,000.00        
502-01 superpave asphaltic concrete 699.8    TON 121.00 84,675.80 100.00 69,980.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
156.1    TON 215.00 33,561.50 175.00 27,317.50        
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 64      LNFT 60.00 3,840.00 50.00 3,200.00        
701-01-P/Q cross drain pipe (54" rcp/pcp or 60" cmp) 264      LNFT 141.00 37,224.00 175.00 46,200.00        
701-05-I side drain pipe (24") 125      LNFT 69.00 8,625.00 50.00 6,250.00        
705-02 combination mesh & barbed wire fence 175      LNFT 11.00 1,925.00 10.00 1,750.00        
708-01 right-of-way monument 15      EACH 150.00 2,250.00 150.00 2,250.00        
708-02 right-of-way monument witness post 15      EACH 150.00 2,250.00 40.00 600.00        
712-02 sacked concrete revetment 22      SQYD 208.00 4,576.00 100.00 2,200.00        
712-04 flexible revetment 58      SQYD 48.00 2,784.00 75.00 4,350.00        
713-01 temporary signs & barricades lump      LUMP 6,000.00 6,000.00 8,000.00 8,000.00        
713-02-E temporary pavement markings (24" width) 11      LNFT 5.00 55.00 13.00 143.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
0.592  MILE 3,700.00 2,190.40 800.00 473.60        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
0.208  MILE 900.00 187.20 500.00 104.00        
713-04-A temporary pavement markings (solid line)(4" width) 0.962  MILE 1,000.00 962.00 800.00 769.60        
716-01-A mulch (vegetative) 6.4    TON 1,000.00 6,400.00 500.00 3,200.00        
717-01 seeding 258      LB 13.00 3,354.00 9.00 2,322.00        
718-01 fertilizer 3,220      LB 0.80 2,576.00 1.00 3,220.00        
720-01-A erosion control system, slope protection (type a) 3,826      SQYD 5.00 19,130.00 1.50 5,739.00        
720-01-C erosion control system, flexible channel liner (type c) 150      SQYD 2.00 300.00 3.00 450.00        
720-01-D erosion control system, flexible channel liner (type d) 100      SQYD 2.00 200.00 2.80 280.00        
726-01 bedding material 178.2    CUYD 90.00 16,038.00 75.00 13,365.00        
727-01 mobilization lump      LUMP 50,000.00 50,000.00 7,500.00 7,500.00        
729-16-B object marker assembly (type 2) 2      EACH 60.00 120.00 80.00 160.00        
731-02 reflectorized raised pavement markers 41      EACH 11.00 451.00 20.00 820.00        
732-01-E plastic pavement striping (24" width) 11      LNFT 5.00 55.00 20.00 220.00        
732-02-A plastic pavement striping (solid line) (4" width) 0.962  MILE 5,000.00 4,810.00 6,000.00 5,772.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.208  MILE 2,000.00 416.00 1,200.00 249.60        
735-01 mailboxes 3      EACH 120.00 360.00 50.00 150.00        
735-02 mailbox supports (single) 3      EACH 120.00 360.00 50.00 150.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00        
S-001 full depth sawcut in asphaltic concrete roadway 180      inft 2.00 360.00 6.00 1,080.00        
                       
 CONTRACTOR TOTAL       606,043.00   IRREGULAR        