| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - JB JAMES CONSTRUCTION LLC |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
100,000.00 |
100,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
38,000.00 |
38,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 100+00,19' wide, 240.4' long
timber bridge with steel girder center span and wingwalls) |
1   |
EACH |
65,000.00 |
65,000.00 |
100,000.00 |
100,000.00 |
110,000.00 |
110,000.00 |
175,000.00 |
175,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
795.0 |
SQYD |
9.00 |
7,155.00 |
10.00 |
7,950.00 |
7.00 |
5,565.00 |
15.00 |
11,925.00 |
| 202-02-I |
removal of railroad (rails & cross ties)
|
300   |
lnft |
9.00 |
2,700.00 |
45.00 |
13,500.00 |
28.00 |
8,400.00 |
30.00 |
9,000.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
65,000.00 |
65,000.00 |
150,000.00 |
150,000.00 |
65,000.00 |
65,000.00 |
80,000.00 |
80,000.00 |
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
20.00 |
600.00 |
12.00 |
360.00 |
23.00 |
690.00 |
140.00 |
4,200.00 |
| 204-03 |
temporary slope drains
|
165   |
LNFT |
20.00 |
3,300.00 |
15.00 |
2,475.00 |
12.50 |
2,062.50 |
20.00 |
3,300.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
350.00 |
1,400.00 |
150.00 |
600.00 |
270.00 |
1,080.00 |
300.00 |
1,200.00 |
| 204-06 |
temporary silt fencing
|
250   |
LNFT |
2.50 |
625.00 |
2.50 |
625.00 |
4.25 |
1,062.50 |
5.00 |
1,250.00 |
| 302-01-A |
class ii base course (stone)
|
305.6 |
CUYD |
120.00 |
36,672.00 |
180.00 |
55,008.00 |
115.00 |
35,144.00 |
130.00 |
39,728.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2   |
CUYD |
400.00 |
800.00 |
150.00 |
300.00 |
250.00 |
500.00 |
200.00 |
400.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
30.0 |
CUYD |
88.00 |
2,640.00 |
100.00 |
3,000.00 |
100.00 |
3,000.00 |
100.00 |
3,000.00 |
| 502-01 |
superpave asphaltic concrete
|
280.3 |
TON |
145.00 |
40,643.50 |
210.00 |
58,863.00 |
190.00 |
53,257.00 |
300.00 |
84,090.00 |
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
98   |
LNFT |
65.00 |
6,370.00 |
60.00 |
5,880.00 |
59.00 |
5,782.00 |
115.00 |
11,270.00 |
| 701-05-I |
side drain pipe (24")
|
100   |
LNFT |
68.00 |
6,800.00 |
70.00 |
7,000.00 |
73.00 |
7,300.00 |
175.00 |
17,500.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
135   |
LNFT |
70.00 |
9,450.00 |
70.00 |
9,450.00 |
64.00 |
8,640.00 |
200.00 |
27,000.00 |
| 701-12-U |
corrugated metal pipe (extension)(84")
|
32   |
LNFT |
250.00 |
8,000.00 |
240.00 |
7,680.00 |
300.00 |
9,600.00 |
700.00 |
22,400.00 |
| 701-15 |
concrete collar
|
1   |
EACH |
1,500.00 |
1,500.00 |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
4,500.00 |
4,500.00 |
4,000.00 |
4,000.00 |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
| 711-01-C |
riprap (30 lb,14" thick )
|
481   |
SQYD |
55.00 |
26,455.00 |
90.00 |
43,290.00 |
63.00 |
30,303.00 |
110.00 |
52,910.00 |
| 711-04 |
geotextile fabric
|
481   |
SQYD |
3.40 |
1,635.40 |
2.00 |
962.00 |
2.15 |
1,034.15 |
3.00 |
1,443.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
60,000.00 |
60,000.00 |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
| 716-01-A |
mulch (vegetative)
|
3.0 |
TON |
500.00 |
1,500.00 |
700.00 |
2,100.00 |
800.00 |
2,400.00 |
700.00 |
2,100.00 |
| 717-01 |
seeding
|
32   |
LB |
15.00 |
480.00 |
15.00 |
480.00 |
12.25 |
392.00 |
15.00 |
480.00 |
| 718-01 |
fertilizer
|
709   |
LB |
1.00 |
709.00 |
0.50 |
354.50 |
1.25 |
886.25 |
1.00 |
709.00 |
| 726-01 |
bedding material
|
1.7 |
CUYD |
170.00 |
289.00 |
200.00 |
340.00 |
475.00 |
807.50 |
600.00 |
1,020.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
170,000.00 |
170,000.00 |
220,000.00 |
220,000.00 |
452,000.00 |
452,000.00 |
240,000.00 |
240,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
115.00 |
460.00 |
100.00 |
400.00 |
100.00 |
400.00 |
100.00 |
400.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
30,000.00 |
30,000.00 |
| 804-01-F |
precast concrete piles (24")
|
2,520   |
LNFT |
90.00 |
226,800.00 |
120.00 |
302,400.00 |
157.40 |
396,648.00 |
150.00 |
378,000.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
35,000.00 |
35,000.00 |
1,000.00 |
1,000.00 |
| 805-01-F |
class a concrete (bents)
|
108.50 |
CUYD |
1,200.00 |
130,200.00 |
1,300.00 |
141,050.00 |
1,200.00 |
130,200.00 |
1,200.00 |
130,200.00 |
| 805-03 |
class aa concrete
|
322.98 |
CUYD |
1,100.00 |
355,278.00 |
1,100.00 |
355,278.00 |
1,100.00 |
355,278.00 |
1,200.00 |
387,576.00 |
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
2,212.0 |
LNFT |
65.00 |
143,780.00 |
78.00 |
172,536.00 |
70.00 |
154,840.00 |
85.00 |
188,020.00 |
| 806-01 |
deformed reinforcing steel
|
101,748   |
LB |
0.85 |
86,485.80 |
0.90 |
91,573.20 |
0.80 |
81,398.40 |
0.80 |
81,398.40 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
71,000.00 |
71,000.00 |
70,000.00 |
70,000.00 |
60,000.00 |
60,000.00 |
50,000.00 |
50,000.00 |
| 810-04 |
steel & concrete railing
|
560.00 |
LNFT |
160.00 |
89,600.00 |
200.00 |
112,000.00 |
225.00 |
126,000.00 |
250.00 |
140,000.00 |
| 813-01-A |
concrete approach slabs(with sidewalk parapet)
|
286.34 |
SQYD |
280.00 |
80,175.20 |
280.00 |
80,175.20 |
225.00 |
64,426.50 |
300.00 |
85,902.00 |
| S-001 |
vibration monitoring during(all pile driving
operations) |
lump |
lump |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
35,000.00 |
35,000.00 |
35,000.00 |
35,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,715,502.90 |
|
2,281,629.90 |
|
2,356,096.80 |
|
2,382,921.40 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - F. MILLER CONSTRUCTION LLC |
- 6 - AUSTIN BRIDGE & ROAD, LP |
- 7 - CECIL D. GASSIOTT LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
20,000.00 |
20,000.00 |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,500.00 |
5,500.00 |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta. 100+00,19' wide, 240.4' long
timber bridge with steel girder center span and wingwalls) |
1   |
EACH |
98,000.00 |
98,000.00 |
150,000.00 |
150,000.00 |
60,000.00 |
60,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
795.0 |
SQYD |
10.00 |
7,950.00 |
6.00 |
4,770.00 |
15.00 |
11,925.00 |
|
|
| 202-02-I |
removal of railroad (rails & cross ties)
|
300   |
lnft |
20.00 |
6,000.00 |
120.00 |
36,000.00 |
25.00 |
7,500.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
70,000.00 |
70,000.00 |
120,000.00 |
120,000.00 |
65,000.00 |
65,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
15.00 |
450.00 |
8.50 |
255.00 |
200.00 |
6,000.00 |
|
|
| 204-03 |
temporary slope drains
|
165   |
LNFT |
22.00 |
3,630.00 |
16.00 |
2,640.00 |
15.00 |
2,475.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
200.00 |
800.00 |
85.00 |
340.00 |
110.00 |
440.00 |
|
|
| 204-06 |
temporary silt fencing
|
250   |
LNFT |
3.50 |
875.00 |
19.31 |
4,827.50 |
5.00 |
1,250.00 |
|
|
| 302-01-A |
class ii base course (stone)
|
305.6 |
CUYD |
70.00 |
21,392.00 |
180.00 |
55,008.00 |
110.00 |
33,616.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2   |
CUYD |
125.00 |
250.00 |
400.00 |
800.00 |
110.00 |
220.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
30.0 |
CUYD |
75.00 |
2,250.00 |
180.00 |
5,400.00 |
100.00 |
3,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
280.3 |
TON |
200.00 |
56,060.00 |
225.00 |
63,067.50 |
215.00 |
60,264.50 |
|
|
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
98   |
LNFT |
120.00 |
11,760.00 |
80.00 |
7,840.00 |
35.00 |
3,430.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
100   |
LNFT |
190.00 |
19,000.00 |
65.00 |
6,500.00 |
48.00 |
4,800.00 |
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
135   |
LNFT |
212.00 |
28,620.00 |
65.00 |
8,775.00 |
48.00 |
6,480.00 |
|
|
| 701-12-U |
corrugated metal pipe (extension)(84")
|
32   |
LNFT |
650.00 |
20,800.00 |
190.00 |
6,080.00 |
125.00 |
4,000.00 |
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
400.00 |
400.00 |
1,000.00 |
1,000.00 |
8,500.00 |
8,500.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
4,200.00 |
4,200.00 |
2,450.00 |
2,450.00 |
6,500.00 |
6,500.00 |
|
|
| 711-01-C |
riprap (30 lb,14" thick )
|
481   |
SQYD |
55.00 |
26,455.00 |
140.00 |
67,340.00 |
75.00 |
36,075.00 |
|
|
| 711-04 |
geotextile fabric
|
481   |
SQYD |
3.50 |
1,683.50 |
10.00 |
4,810.00 |
3.00 |
1,443.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
36,000.00 |
36,000.00 |
50,000.00 |
50,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
3.0 |
TON |
400.00 |
1,200.00 |
400.00 |
1,200.00 |
5,000.00 |
15,000.00 |
|
|
| 717-01 |
seeding
|
32   |
LB |
10.00 |
320.00 |
1.20 |
38.40 |
10.00 |
320.00 |
|
|
| 718-01 |
fertilizer
|
709   |
LB |
0.65 |
460.85 |
0.65 |
460.85 |
1.00 |
709.00 |
|
|
| 726-01 |
bedding material
|
1.7 |
CUYD |
200.00 |
340.00 |
120.00 |
204.00 |
100.00 |
170.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
280,000.00 |
280,000.00 |
300,000.00 |
300,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
100.00 |
400.00 |
100.00 |
400.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
240,000.00 |
240,000.00 |
100,000.00 |
100,000.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
2,520   |
LNFT |
300.00 |
756,000.00 |
120.00 |
302,400.00 |
368.00 |
927,360.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
100.00 |
100.00 |
24,000.00 |
24,000.00 |
2,500.00 |
2,500.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
108.50 |
CUYD |
1,600.00 |
173,600.00 |
1,500.00 |
162,750.00 |
550.00 |
59,675.00 |
|
|
| 805-03 |
class aa concrete
|
322.98 |
CUYD |
1,500.00 |
484,470.00 |
1,300.00 |
419,874.00 |
900.00 |
290,682.00 |
|
|
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
2,212.0 |
LNFT |
100.00 |
221,200.00 |
100.00 |
221,200.00 |
200.00 |
442,400.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
101,748   |
LB |
1.00 |
101,748.00 |
0.90 |
91,573.20 |
1.00 |
101,748.00 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
68,000.00 |
68,000.00 |
76,000.00 |
76,000.00 |
5,000.00 |
5,000.00 |
|
|
| 810-04 |
steel & concrete railing
|
560.00 |
LNFT |
220.00 |
123,200.00 |
140.00 |
78,400.00 |
100.00 |
56,000.00 |
|
|
| 813-01-A |
concrete approach slabs(with sidewalk parapet)
|
286.34 |
SQYD |
320.00 |
91,628.80 |
250.00 |
71,585.00 |
100.00 |
28,634.00 |
|
|
| S-001 |
vibration monitoring during(all pile driving
operations) |
lump |
lump |
50,400.00 |
50,400.00 |
36,000.00 |
36,000.00 |
50,000.00 |
50,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,794,143.15 |
|
2,809,988.45 |
|
2,953,516.50 |
|
|
|