| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - CYCLE CONSTRUCTION CO. L.L.C. |
- 3 - COMMAND CONSTRUCTION INDUSTRIES LLC |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
14,000.00 |
14,000.00 |
1,100.00 |
1,100.00 |
77,766.92 |
77,766.92 |
1,000.00 |
1,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
562   |
SQYD |
18.00 |
10,116.00 |
7.00 |
3,934.00 |
20.00 |
11,240.00 |
10.00 |
5,620.00 |
| 202-02-I |
removal of abandoned light pole
|
2   |
EACH |
800.00 |
1,600.00 |
1,250.00 |
2,500.00 |
300.00 |
600.00 |
1,500.00 |
3,000.00 |
| 202-03-A |
relocation of timber bollard
|
163   |
EACH |
40.00 |
6,520.00 |
40.00 |
6,520.00 |
50.00 |
8,150.00 |
40.00 |
6,520.00 |
| 202-03-B |
relocation of sign post
|
4   |
EACH |
50.00 |
200.00 |
70.00 |
280.00 |
75.00 |
300.00 |
70.00 |
280.00 |
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
0.50 |
500.00 |
2.50 |
2,500.00 |
2.00 |
2,000.00 |
2.00 |
2,000.00 |
| 302-01 |
class ii base course
|
667.9 |
CUYD |
180.00 |
120,222.00 |
260.00 |
173,654.00 |
100.00 |
66,790.00 |
190.00 |
126,901.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
60.6 |
CUYD |
30.00 |
1,818.00 |
50.00 |
3,030.00 |
150.00 |
9,090.00 |
80.00 |
4,848.00 |
| 502-01 |
superpave asphaltic concrete
|
8,409.1 |
TON |
95.00 |
798,864.50 |
115.00 |
967,046.50 |
120.00 |
1,009,092.00 |
105.00 |
882,955.50 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
622.7 |
TON |
196.00 |
122,049.20 |
164.00 |
102,122.80 |
180.00 |
112,086.00 |
150.00 |
93,405.00 |
| 509-01-A |
cold planing asphaltic pavement (1 1/2" avg. depth)
|
13,228   |
SQYD |
2.00 |
26,456.00 |
2.20 |
29,101.60 |
5.00 |
66,140.00 |
2.00 |
26,456.00 |
| 509-01-B |
cold planing asphaltic pavement (2" avg. depth)
|
52,910   |
SQYD |
2.00 |
105,820.00 |
2.20 |
116,402.00 |
5.00 |
264,550.00 |
2.00 |
105,820.00 |
| 602-02 |
cleaning and resealing existing longitudinal and
transverse pavement joints |
37,150   |
LNFT |
1.50 |
55,725.00 |
2.00 |
74,300.00 |
1.00 |
37,150.00 |
1.70 |
63,155.00 |
| 706-01-A |
concrete walk (4" thick)
|
347.1 |
SQYD |
77.00 |
26,726.70 |
70.00 |
24,297.00 |
65.00 |
22,561.50 |
85.00 |
29,503.50 |
| 706-02-C |
concrete drive (6" thick)
|
50.0 |
SQYD |
70.00 |
3,500.00 |
70.00 |
3,500.00 |
65.00 |
3,250.00 |
135.00 |
6,750.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
90,000.00 |
90,000.00 |
195,000.00 |
195,000.00 |
75,000.00 |
75,000.00 |
200,000.00 |
200,000.00 |
| 713-02-A |
temporary pavement markings (4" width)
|
500   |
LNFT |
0.20 |
100.00 |
0.22 |
110.00 |
0.25 |
125.00 |
0.30 |
150.00 |
| 713-02-C |
temporary pavement markings (8" width)
|
300   |
LNFT |
0.35 |
105.00 |
0.38 |
114.00 |
0.50 |
150.00 |
0.55 |
165.00 |
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
15.00 |
90.00 |
55.00 |
330.00 |
50.00 |
300.00 |
110.00 |
660.00 |
| 713-05-B |
temporary pavement legends and symbols (double arrow)
|
4   |
EACH |
15.00 |
60.00 |
110.00 |
440.00 |
75.00 |
300.00 |
130.00 |
520.00 |
| 713-05-C |
temporary pavement legends and symbols (only)
|
4   |
EACH |
15.00 |
60.00 |
66.00 |
264.00 |
75.00 |
300.00 |
110.00 |
440.00 |
| 715-01 |
topsoil
|
465   |
CUYD |
55.00 |
25,575.00 |
40.00 |
18,600.00 |
40.00 |
18,600.00 |
30.00 |
13,950.00 |
| 717-01 |
seeding
|
120   |
LB |
8.00 |
960.00 |
13.00 |
1,560.00 |
10.00 |
1,200.00 |
15.00 |
1,800.00 |
| 718-01 |
fertilizer
|
4,000   |
LB |
0.50 |
2,000.00 |
0.54 |
2,160.00 |
0.50 |
2,000.00 |
1.00 |
4,000.00 |
| 723-02 |
granular material (vehicular measurement)
|
675   |
CUYD |
48.00 |
32,400.00 |
18.00 |
12,150.00 |
28.00 |
18,900.00 |
28.00 |
18,900.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
280,000.00 |
280,000.00 |
415,000.00 |
415,000.00 |
490,000.00 |
490,000.00 |
510,000.00 |
510,000.00 |
| 729-01 |
sign (type a)
|
300.0 |
SQFT |
15.00 |
4,500.00 |
20.00 |
6,000.00 |
20.00 |
6,000.00 |
20.00 |
6,000.00 |
| 729-21 |
u-channel post
|
52   |
EACH |
40.00 |
2,080.00 |
57.00 |
2,964.00 |
60.00 |
3,120.00 |
57.00 |
2,964.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,268   |
EACH |
5.10 |
6,466.80 |
6.00 |
7,608.00 |
6.00 |
7,608.00 |
6.00 |
7,608.00 |
| 732-01-B |
plastic pavement striping (6" width)
|
6,493   |
LNFT |
0.75 |
4,869.75 |
1.00 |
6,493.00 |
1.00 |
6,493.00 |
0.80 |
5,194.40 |
| 732-01-C |
plastic pavement striping (8" width)
|
786   |
LNFT |
1.00 |
786.00 |
1.00 |
786.00 |
1.00 |
786.00 |
1.40 |
1,100.40 |
| 732-01-D |
plastic pavement striping (12" width)
|
1,068   |
LNFT |
2.10 |
2,242.80 |
2.50 |
2,670.00 |
2.00 |
2,136.00 |
2.80 |
2,990.40 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.074 |
MILE |
2,900.00 |
17,614.60 |
3,000.00 |
18,222.00 |
2,900.00 |
17,614.60 |
2,700.00 |
16,399.80 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.323 |
MILE |
780.00 |
1,031.94 |
800.00 |
1,058.40 |
750.00 |
992.25 |
900.00 |
1,190.70 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
49   |
EACH |
195.00 |
9,555.00 |
215.00 |
10,535.00 |
200.00 |
9,800.00 |
250.00 |
12,250.00 |
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
4   |
EACH |
420.00 |
1,680.00 |
440.00 |
1,760.00 |
400.00 |
1,600.00 |
440.00 |
1,760.00 |
| 732-04-F |
plastic pavement legends & symbols (bike lane)
|
49   |
EACH |
250.00 |
12,250.00 |
275.00 |
13,475.00 |
250.00 |
12,250.00 |
250.00 |
12,250.00 |
| 732-04-G |
plastic pavement legends & symbols (bike & chevron)
|
6   |
EACH |
300.00 |
1,800.00 |
300.00 |
1,800.00 |
275.00 |
1,650.00 |
575.00 |
3,450.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
47,000.00 |
47,000.00 |
100,000.00 |
100,000.00 |
30,000.00 |
30,000.00 |
| S-002 |
concrete pavement repair (18.0 sq.yd. & under)
|
107.7 |
SQYD |
208.00 |
22,401.60 |
240.00 |
25,848.00 |
220.00 |
23,694.00 |
211.00 |
22,724.70 |
| S-003 |
concrete pavement repair (18.1 sq.yd. to 48.0 sq.yd.)
|
358.6 |
SQYD |
143.00 |
51,279.80 |
190.00 |
68,134.00 |
175.00 |
62,755.00 |
191.00 |
68,492.60 |
| S-004 |
concrete pavement repair (48.1 sq.yd. & over)
|
6,163.3 |
SQYD |
118.00 |
727,269.40 |
136.00 |
838,208.80 |
125.00 |
770,412.50 |
186.00 |
1,146,373.80 |
| S-005 |
tree protection
|
lump |
LUMP |
2,000.00 |
2,000.00 |
29,000.00 |
29,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
| S-006 |
tree trimming
|
lump |
LUMP |
2,000.00 |
2,000.00 |
27,000.00 |
27,000.00 |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
| S-007 |
catch basin adjustment type a
|
3   |
EACH |
1,400.00 |
4,200.00 |
1,300.00 |
3,900.00 |
800.00 |
2,400.00 |
1,550.00 |
4,650.00 |
| S-008 |
catch basin adjustment type c
|
2   |
EACH |
2,000.00 |
4,000.00 |
3,300.00 |
6,600.00 |
1,500.00 |
3,000.00 |
2,500.00 |
5,000.00 |
| S-009 |
catch basin frame & cover
|
2   |
EACH |
1,700.00 |
3,400.00 |
1,400.00 |
2,800.00 |
1,200.00 |
2,400.00 |
1,000.00 |
2,000.00 |
| S-010 |
concrete walks (handicapped ramps - type a)
|
48   |
EACH |
1,800.00 |
86,400.00 |
2,000.00 |
96,000.00 |
1,900.00 |
91,200.00 |
1,800.00 |
86,400.00 |
| S-011 |
concrete walks (handicapped ramps - type b)
|
66   |
EACH |
1,800.00 |
118,800.00 |
2,000.00 |
132,000.00 |
1,900.00 |
125,400.00 |
1,800.00 |
118,800.00 |
| S-012 |
rehablitate existing catch basins
|
1   |
EACH |
3,100.00 |
3,100.00 |
330.00 |
330.00 |
1,250.00 |
1,250.00 |
900.00 |
900.00 |
| S-013 |
concrete walks at bridge approachs
|
480   |
SQYD |
88.00 |
42,240.00 |
80.00 |
38,400.00 |
75.00 |
36,000.00 |
135.00 |
64,800.00 |
| S-014 |
reconstruction of concrete curb & gutter bottom (8"
barrier curb) |
276   |
LNFT |
80.00 |
22,080.00 |
80.00 |
22,080.00 |
75.00 |
20,700.00 |
85.00 |
23,460.00 |
| S-015 |
manhole adjustment
|
2   |
EACH |
2,600.00 |
5,200.00 |
500.00 |
1,000.00 |
1,200.00 |
2,400.00 |
2,200.00 |
4,400.00 |
| S-016 |
root pruning
|
lump |
LUMP |
2,000.00 |
2,000.00 |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| S-017 |
hand formed and poured in-place concrete curb within
the limits of the tre e dripline |
50   |
LNFT |
72.00 |
3,600.00 |
30.00 |
1,500.00 |
50.00 |
2,500.00 |
120.00 |
6,000.00 |
| S-018 |
gravel bed and filter cloth over tree roots
|
100   |
SQYD |
25.00 |
2,500.00 |
25.00 |
2,500.00 |
20.00 |
2,000.00 |
18.00 |
1,800.00 |
| S-019 |
grate inlet frame & cover
|
4   |
EACH |
1,900.00 |
7,600.00 |
1,200.00 |
4,800.00 |
1,100.00 |
4,400.00 |
1,000.00 |
4,000.00 |
| S-021 |
12" diameter pvc water main with main line fittings
|
3,975   |
LNFT |
83.00 |
329,925.00 |
89.00 |
353,775.00 |
90.00 |
357,750.00 |
100.00 |
397,500.00 |
| S-022 |
8" diameter pvc water main with main line fittings
|
700   |
LNFT |
250.00 |
175,000.00 |
225.00 |
157,500.00 |
60.00 |
42,000.00 |
170.00 |
119,000.00 |
| S-023 |
12" diameter water main offset
|
2   |
EACH |
15,500.00 |
31,000.00 |
7,800.00 |
15,600.00 |
15,000.00 |
30,000.00 |
14,000.00 |
28,000.00 |
| S-024 |
8" diameter water main offset
|
2   |
EACH |
11,000.00 |
22,000.00 |
5,900.00 |
11,800.00 |
12,500.00 |
25,000.00 |
10,000.00 |
20,000.00 |
| S-025 |
portland cement concrete pavement for waterline
replacement |
4,175   |
SQYD |
144.00 |
601,200.00 |
121.00 |
505,175.00 |
160.00 |
668,000.00 |
145.50 |
607,462.50 |
| S-026 |
new fire hydrant
|
3   |
EACH |
5,000.00 |
15,000.00 |
3,400.00 |
10,200.00 |
10,000.00 |
30,000.00 |
4,300.00 |
12,900.00 |
| S-027 |
new water valve manhole
|
5   |
EACH |
5,000.00 |
25,000.00 |
3,200.00 |
16,000.00 |
5,500.00 |
27,500.00 |
2,500.00 |
12,500.00 |
| S-028 |
remove/abandon existing water valve manhole
|
5   |
EACH |
550.00 |
2,750.00 |
250.00 |
1,250.00 |
200.00 |
1,000.00 |
350.00 |
1,750.00 |
| S-029 |
plug and bypass 12" diameter and 8" diameter water
mains and fill with flow able material (sand) |
lump |
LUMP |
24,000.00 |
24,000.00 |
42,000.00 |
42,000.00 |
15,000.00 |
15,000.00 |
32,000.00 |
32,000.00 |
| S-030 |
3/4" & 1" whc's (by directional drilling)(use 1"
saddle whip and a reducer as needed) |
55   |
EACH |
1,500.00 |
82,500.00 |
1,000.00 |
55,000.00 |
750.00 |
41,250.00 |
1,600.00 |
88,000.00 |
| S-031 |
new 12" water valve
|
5   |
EACH |
13,500.00 |
67,500.00 |
8,500.00 |
42,500.00 |
15,000.00 |
75,000.00 |
9,000.00 |
45,000.00 |
| S-032 |
adjust water valve
|
1   |
EACH |
1,000.00 |
1,000.00 |
600.00 |
600.00 |
750.00 |
750.00 |
700.00 |
700.00 |
| S-033 |
type ix reflective sheeting (mutcd no. w1-8)
|
25   |
EACH |
16.00 |
400.00 |
16.00 |
400.00 |
15.00 |
375.00 |
17.00 |
425.00 |
| S-034 |
submerged roads program project sign
|
4   |
EACH |
275.00 |
1,100.00 |
250.00 |
1,000.00 |
300.00 |
1,200.00 |
300.00 |
1,200.00 |
| S-035 |
1 1/2" whc from new main to meter (by directional
drilling) |
3   |
EACH |
1,500.00 |
4,500.00 |
1,200.00 |
3,600.00 |
1,500.00 |
4,500.00 |
2,500.00 |
7,500.00 |
| S-036 |
2" whc from new main to meter (by directional drilling)
|
3   |
EACH |
1,500.00 |
4,500.00 |
1,400.00 |
4,200.00 |
1,750.00 |
5,250.00 |
2,700.00 |
8,100.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,297,790.09 |
|
4,847,088.10 |
|
4,977,777.77 |
|
5,196,795.30 |
|