| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - KEY CONSTRUCTORS, INC. |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
- 4 - GUINN BROTHERS, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
51,900.00 |
51,900.00 |
45,000.00 |
45,000.00 |
| 202-02-A-01 |
removal of bridge(sta.100+00;154' x 25' timber bridge
|
1   |
EACH |
16,000.00 |
16,000.00 |
50,000.00 |
50,000.00 |
44,700.00 |
44,700.00 |
50,000.00 |
50,000.00 |
| 202-02-A-02 |
removal of bridge(sta.100+00;39' x 25' timber bridge
|
1   |
EACH |
10,500.00 |
10,500.00 |
15,000.00 |
15,000.00 |
23,300.00 |
23,300.00 |
17,500.00 |
17,500.00 |
| 202-02-G |
removal of surfacing and stabilized base
|
729   |
SQYD |
9.50 |
6,925.50 |
20.00 |
14,580.00 |
18.00 |
13,122.00 |
7.00 |
5,103.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
60,500.00 |
60,500.00 |
125,000.00 |
125,000.00 |
125,000.00 |
125,000.00 |
115,000.00 |
115,000.00 |
| 204-02 |
temporary hay or straw bales
|
16   |
EACH |
15.00 |
240.00 |
20.00 |
320.00 |
15.00 |
240.00 |
100.00 |
1,600.00 |
| 204-03 |
temporary slope drains
|
110   |
LNFT |
10.00 |
1,100.00 |
30.00 |
3,300.00 |
35.00 |
3,850.00 |
10.00 |
1,100.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
130.00 |
1,040.00 |
150.00 |
1,200.00 |
350.00 |
2,800.00 |
200.00 |
1,600.00 |
| 204-06 |
temporary silt fencing
|
966   |
LNFT |
2.70 |
2,608.20 |
5.00 |
4,830.00 |
4.00 |
3,864.00 |
6.00 |
5,796.00 |
| 302-01 |
class ii base course
|
303.4 |
CUYD |
95.00 |
28,823.00 |
150.00 |
45,510.00 |
97.00 |
29,429.80 |
115.00 |
34,891.00 |
| 502-01 |
superpave asphaltic concrete
|
237.8 |
TON |
210.00 |
49,938.00 |
250.00 |
59,450.00 |
228.00 |
54,218.40 |
300.00 |
71,340.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
6.3 |
TON |
210.00 |
1,323.00 |
250.00 |
1,575.00 |
228.00 |
1,436.40 |
500.00 |
3,150.00 |
| 701-05-G |
side drain pipe (18")
|
26   |
LNFT |
65.50 |
1,703.00 |
60.00 |
1,560.00 |
49.00 |
1,274.00 |
75.00 |
1,950.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
60   |
LNFT |
76.00 |
4,560.00 |
125.00 |
7,500.00 |
112.00 |
6,720.00 |
95.00 |
5,700.00 |
| 701-05-Q-01 |
side drain pipe (60")(erosion)
|
148   |
LNFT |
135.50 |
20,054.00 |
310.00 |
45,880.00 |
240.00 |
35,520.00 |
500.00 |
74,000.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
70.00 |
7,000.00 |
69.00 |
6,900.00 |
75.00 |
7,500.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
30.00 |
3,000.00 |
40.00 |
4,000.00 |
40.00 |
4,000.00 |
50.00 |
5,000.00 |
| 706-02-C |
concrete drive (6" thick)
|
81.4 |
SQYD |
130.00 |
10,582.00 |
85.00 |
6,919.00 |
75.00 |
6,105.00 |
95.00 |
7,733.00 |
| 711-01-D |
riprap (55 lb, 18" thick )
|
1,232   |
SQYD |
65.00 |
80,080.00 |
55.00 |
67,760.00 |
62.00 |
76,384.00 |
90.00 |
110,880.00 |
| 711-04 |
geotextile fabric
|
1,232   |
SQYD |
2.05 |
2,525.60 |
5.00 |
6,160.00 |
5.00 |
6,160.00 |
5.00 |
6,160.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
30,000.00 |
30,000.00 |
29,700.00 |
29,700.00 |
30,000.00 |
30,000.00 |
| 716-01-A |
mulch (vegetative)
|
2.2 |
TON |
795.00 |
1,749.00 |
1,000.00 |
2,200.00 |
1,100.00 |
2,420.00 |
2,000.00 |
4,400.00 |
| 717-01 |
seeding
|
50   |
LB |
9.00 |
450.00 |
10.00 |
500.00 |
13.50 |
675.00 |
20.00 |
1,000.00 |
| 718-01 |
fertilizer
|
1,100   |
LB |
0.80 |
880.00 |
1.00 |
1,100.00 |
0.75 |
825.00 |
3.00 |
3,300.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
215,000.00 |
215,000.00 |
130,000.00 |
130,000.00 |
241,500.00 |
241,500.00 |
150,000.00 |
150,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
75.00 |
900.00 |
100.00 |
1,200.00 |
85.00 |
1,020.00 |
150.00 |
1,800.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
31,000.00 |
31,000.00 |
25,000.00 |
25,000.00 |
| 804-01-B |
precast concrete piles (14")
|
3,114   |
LNFT |
65.00 |
202,410.00 |
62.00 |
193,068.00 |
72.00 |
224,208.00 |
50.00 |
155,700.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
5,000.00 |
10,000.00 |
1,000.00 |
2,000.00 |
5,000.00 |
10,000.00 |
1.00 |
2.00 |
| 805-10-A |
bridge superstructure & substructure(28' clr. roadway;
45 degree crossing) |
9   |
SPAN |
37,700.00 |
339,300.00 |
42,000.00 |
378,000.00 |
33,000.00 |
297,000.00 |
44,500.00 |
400,500.00 |
| 805-10-B |
bridge superstructure & substructure(28' clr. roadway;
90 degree crossing) |
4   |
SPAN |
38,500.00 |
154,000.00 |
38,000.00 |
152,000.00 |
33,000.00 |
132,000.00 |
42,500.00 |
170,000.00 |
| S-001 |
vibration monitoring
|
lump |
lump |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
| S-101 |
concrete approach slabs(28'clr. roadway;45 degree
crossing without asphalt) |
2   |
EACH |
14,000.00 |
28,000.00 |
10,000.00 |
20,000.00 |
11,000.00 |
22,000.00 |
12,500.00 |
25,000.00 |
| S-102 |
concrete approach slabs with tapered barrier rails(28'
clr. roadway; 90 degree crossing without asphalt) |
2   |
EACH |
13,500.00 |
27,000.00 |
15,000.00 |
30,000.00 |
11,000.00 |
22,000.00 |
12,500.00 |
25,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,426,691.30 |
|
1,497,612.00 |
|
1,536,271.60 |
|
1,587,705.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - JB JAMES CONSTRUCTION LLC |
- 6 - CYCLE CONSTRUCTION CO. L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100,000.00 |
100,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta.100+00;154' x 25' timber bridge
|
1   |
EACH |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta.100+00;39' x 25' timber bridge
|
1   |
EACH |
10,000.00 |
10,000.00 |
18,000.00 |
18,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing and stabilized base
|
729   |
SQYD |
10.00 |
7,290.00 |
9.00 |
6,561.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
120,000.00 |
120,000.00 |
175,000.00 |
175,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
16   |
EACH |
15.00 |
240.00 |
30.00 |
480.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
110   |
LNFT |
30.00 |
3,300.00 |
17.00 |
1,870.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
130.00 |
1,040.00 |
250.00 |
2,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
966   |
LNFT |
3.00 |
2,898.00 |
3.50 |
3,381.00 |
|
|
|
|
| 302-01 |
class ii base course
|
303.4 |
CUYD |
170.00 |
51,578.00 |
140.00 |
42,476.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
237.8 |
TON |
230.00 |
54,694.00 |
235.00 |
55,883.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
6.3 |
TON |
230.00 |
1,449.00 |
235.00 |
1,480.50 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
26   |
LNFT |
85.00 |
2,210.00 |
105.00 |
2,730.00 |
|
|
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
60   |
LNFT |
90.00 |
5,400.00 |
110.00 |
6,600.00 |
|
|
|
|
| 701-05-Q-01 |
side drain pipe (60")(erosion)
|
148   |
LNFT |
160.00 |
23,680.00 |
270.00 |
39,960.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
80.00 |
8,000.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
30.00 |
3,000.00 |
85.00 |
8,500.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
81.4 |
SQYD |
65.00 |
5,291.00 |
95.00 |
7,733.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb, 18" thick )
|
1,232   |
SQYD |
110.00 |
135,520.00 |
58.00 |
71,456.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
1,232   |
SQYD |
2.00 |
2,464.00 |
3.00 |
3,696.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
2.2 |
TON |
800.00 |
1,760.00 |
900.00 |
1,980.00 |
|
|
|
|
| 717-01 |
seeding
|
50   |
LB |
10.00 |
500.00 |
10.00 |
500.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,100   |
LB |
0.80 |
880.00 |
0.92 |
1,012.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
160,000.00 |
160,000.00 |
175,000.00 |
175,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
75.00 |
900.00 |
90.00 |
1,080.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
45,000.00 |
45,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
3,114   |
LNFT |
85.00 |
264,690.00 |
82.00 |
255,348.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
1,000.00 |
2,000.00 |
17,000.00 |
34,000.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(28' clr. roadway;
45 degree crossing) |
9   |
SPAN |
37,000.00 |
333,000.00 |
46,000.00 |
414,000.00 |
|
|
|
|
| 805-10-B |
bridge superstructure & substructure(28' clr. roadway;
90 degree crossing) |
4   |
SPAN |
37,000.00 |
148,000.00 |
46,000.00 |
184,000.00 |
|
|
|
|
| S-001 |
vibration monitoring
|
lump |
lump |
16,000.00 |
16,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-101 |
concrete approach slabs(28'clr. roadway;45 degree
crossing without asphalt) |
2   |
EACH |
10,000.00 |
20,000.00 |
23,000.00 |
46,000.00 |
|
|
|
|
| S-102 |
concrete approach slabs with tapered barrier rails(28'
clr. roadway; 90 degree crossing without asphalt) |
2   |
EACH |
14,000.00 |
28,000.00 |
29,000.00 |
58,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,626,284.00 |
|
1,771,726.50 |
|
|
|
|
|