Letting of 4/22/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-53-0112
Parish: TANGIPAHOA
Routes:
Description: J.W. DAVIS & LITTLE ITALY ROAD BRIDGES
Type Const: clearing and grubbing, grading, class ii base course, superpave asphaltic concrete
pavement, concrete slab bridges and related work.
Estimated Construction Cost: $1,407,992.00
 
RankLicenseBidderConstruction Bid
1 09476 KEY CONSTRUCTORS, INC. $1,426,691.30
2 00481 COASTAL BRIDGE CO., L.L.C. $1,497,612.00
3 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,536,271.60
4 09090 GUINN BROTHERS, LLC. $1,587,705.00
5 39462 JB JAMES CONSTRUCTION LLC $1,626,284.00
6 36961 CYCLE CONSTRUCTION CO. L.L.C. $1,771,726.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
KEY CONSTRUCTORS, INC.
- 2 -
COASTAL BRIDGE CO., L.L.C.
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.
- 4 -
GUINN BROTHERS, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 40,000.00 40,000.00 50,000.00 50,000.00 51,900.00 51,900.00 45,000.00 45,000.00
202-02-A-01 removal of bridge(sta.100+00;154' x 25' timber bridge 1      EACH 16,000.00 16,000.00 50,000.00 50,000.00 44,700.00 44,700.00 50,000.00 50,000.00
202-02-A-02 removal of bridge(sta.100+00;39' x 25' timber bridge 1      EACH 10,500.00 10,500.00 15,000.00 15,000.00 23,300.00 23,300.00 17,500.00 17,500.00
202-02-G removal of surfacing and stabilized base 729      SQYD 9.50 6,925.50 20.00 14,580.00 18.00 13,122.00 7.00 5,103.00
203-05 excavation and embankment lump      LUMP 60,500.00 60,500.00 125,000.00 125,000.00 125,000.00 125,000.00 115,000.00 115,000.00
204-02 temporary hay or straw bales 16      EACH 15.00 240.00 20.00 320.00 15.00 240.00 100.00 1,600.00
204-03 temporary slope drains 110      LNFT 10.00 1,100.00 30.00 3,300.00 35.00 3,850.00 10.00 1,100.00
204-05-A temporary sediment check dams (hay) 8      EACH 130.00 1,040.00 150.00 1,200.00 350.00 2,800.00 200.00 1,600.00
204-06 temporary silt fencing 966      LNFT 2.70 2,608.20 5.00 4,830.00 4.00 3,864.00 6.00 5,796.00
302-01 class ii base course 303.4    CUYD 95.00 28,823.00 150.00 45,510.00 97.00 29,429.80 115.00 34,891.00
502-01 superpave asphaltic concrete 237.8    TON 210.00 49,938.00 250.00 59,450.00 228.00 54,218.40 300.00 71,340.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
6.3    TON 210.00 1,323.00 250.00 1,575.00 228.00 1,436.40 500.00 3,150.00
701-05-G side drain pipe (18") 26      LNFT 65.50 1,703.00 60.00 1,560.00 49.00 1,274.00 75.00 1,950.00
701-05-I-01 side drain pipe (24")(erosion) 60      LNFT 76.00 4,560.00 125.00 7,500.00 112.00 6,720.00 95.00 5,700.00
701-05-Q-01 side drain pipe (60")(erosion) 148      LNFT 135.50 20,054.00 310.00 45,880.00 240.00 35,520.00 500.00 74,000.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 70.00 7,000.00 69.00 6,900.00 75.00 7,500.00
704-09 guard rail anchor sections (turndown) 100.0    LNFT 30.00 3,000.00 40.00 4,000.00 40.00 4,000.00 50.00 5,000.00
706-02-C concrete drive (6" thick) 81.4    SQYD 130.00 10,582.00 85.00 6,919.00 75.00 6,105.00 95.00 7,733.00
711-01-D riprap (55 lb, 18" thick ) 1,232      SQYD 65.00 80,080.00 55.00 67,760.00 62.00 76,384.00 90.00 110,880.00
711-04 geotextile fabric 1,232      SQYD 2.05 2,525.60 5.00 6,160.00 5.00 6,160.00 5.00 6,160.00
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 30,000.00 30,000.00 29,700.00 29,700.00 30,000.00 30,000.00
716-01-A mulch (vegetative) 2.2    TON 795.00 1,749.00 1,000.00 2,200.00 1,100.00 2,420.00 2,000.00 4,400.00
717-01 seeding 50      LB 9.00 450.00 10.00 500.00 13.50 675.00 20.00 1,000.00
718-01 fertilizer 1,100      LB 0.80 880.00 1.00 1,100.00 0.75 825.00 3.00 3,300.00
727-01 mobilization lump      LUMP 215,000.00 215,000.00 130,000.00 130,000.00 241,500.00 241,500.00 150,000.00 150,000.00
729-16-C object marker assembly (type 3) 12      EACH 75.00 900.00 100.00 1,200.00 85.00 1,020.00 150.00 1,800.00
740-01 construction layout lump      LUMP 50,000.00 50,000.00 20,000.00 20,000.00 31,000.00 31,000.00 25,000.00 25,000.00
804-01-B precast concrete piles (14") 3,114      LNFT 65.00 202,410.00 62.00 193,068.00 72.00 224,208.00 50.00 155,700.00
804-12 loading permanent piles 2      EACH 5,000.00 10,000.00 1,000.00 2,000.00 5,000.00 10,000.00 1.00 2.00
805-10-A bridge superstructure & substructure(28' clr. roadway;
45 degree crossing)
9      SPAN 37,700.00 339,300.00 42,000.00 378,000.00 33,000.00 297,000.00 44,500.00 400,500.00
805-10-B bridge superstructure & substructure(28' clr. roadway;
90 degree crossing)
4      SPAN 38,500.00 154,000.00 38,000.00 152,000.00 33,000.00 132,000.00 42,500.00 170,000.00
S-001 vibration monitoring lump      lump 10,000.00 10,000.00 20,000.00 20,000.00 25,000.00 25,000.00 25,000.00 25,000.00
S-101 concrete approach slabs(28'clr. roadway;45 degree
crossing without asphalt)
2      EACH 14,000.00 28,000.00 10,000.00 20,000.00 11,000.00 22,000.00 12,500.00 25,000.00
S-102 concrete approach slabs with tapered barrier rails(28'
clr. roadway; 90 degree crossing without asphalt)
2      EACH 13,500.00 27,000.00 15,000.00 30,000.00 11,000.00 22,000.00 12,500.00 25,000.00
                       
 CONTRACTOR TOTAL       1,426,691.30   1,497,612.00   1,536,271.60   1,587,705.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
JB JAMES CONSTRUCTION LLC
- 6 -
CYCLE CONSTRUCTION CO. L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 100,000.00 100,000.00 20,000.00 20,000.00        
202-02-A-01 removal of bridge(sta.100+00;154' x 25' timber bridge 1      EACH 30,000.00 30,000.00 25,000.00 25,000.00        
202-02-A-02 removal of bridge(sta.100+00;39' x 25' timber bridge 1      EACH 10,000.00 10,000.00 18,000.00 18,000.00        
202-02-G removal of surfacing and stabilized base 729      SQYD 10.00 7,290.00 9.00 6,561.00        
203-05 excavation and embankment lump      LUMP 120,000.00 120,000.00 175,000.00 175,000.00        
204-02 temporary hay or straw bales 16      EACH 15.00 240.00 30.00 480.00        
204-03 temporary slope drains 110      LNFT 30.00 3,300.00 17.00 1,870.00        
204-05-A temporary sediment check dams (hay) 8      EACH 130.00 1,040.00 250.00 2,000.00        
204-06 temporary silt fencing 966      LNFT 3.00 2,898.00 3.50 3,381.00        
302-01 class ii base course 303.4    CUYD 170.00 51,578.00 140.00 42,476.00        
502-01 superpave asphaltic concrete 237.8    TON 230.00 54,694.00 235.00 55,883.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
6.3    TON 230.00 1,449.00 235.00 1,480.50        
701-05-G side drain pipe (18") 26      LNFT 85.00 2,210.00 105.00 2,730.00        
701-05-I-01 side drain pipe (24")(erosion) 60      LNFT 90.00 5,400.00 110.00 6,600.00        
701-05-Q-01 side drain pipe (60")(erosion) 148      LNFT 160.00 23,680.00 270.00 39,960.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 80.00 8,000.00        
704-09 guard rail anchor sections (turndown) 100.0    LNFT 30.00 3,000.00 85.00 8,500.00        
706-02-C concrete drive (6" thick) 81.4    SQYD 65.00 5,291.00 95.00 7,733.00        
711-01-D riprap (55 lb, 18" thick ) 1,232      SQYD 110.00 135,520.00 58.00 71,456.00        
711-04 geotextile fabric 1,232      SQYD 2.00 2,464.00 3.00 3,696.00        
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 40,000.00 40,000.00        
716-01-A mulch (vegetative) 2.2    TON 800.00 1,760.00 900.00 1,980.00        
717-01 seeding 50      LB 10.00 500.00 10.00 500.00        
718-01 fertilizer 1,100      LB 0.80 880.00 0.92 1,012.00        
727-01 mobilization lump      LUMP 160,000.00 160,000.00 175,000.00 175,000.00        
729-16-C object marker assembly (type 3) 12      EACH 75.00 900.00 90.00 1,080.00        
740-01 construction layout lump      LUMP 45,000.00 45,000.00 20,000.00 20,000.00        
804-01-B precast concrete piles (14") 3,114      LNFT 85.00 264,690.00 82.00 255,348.00        
804-12 loading permanent piles 2      EACH 1,000.00 2,000.00 17,000.00 34,000.00        
805-10-A bridge superstructure & substructure(28' clr. roadway;
45 degree crossing)
9      SPAN 37,000.00 333,000.00 46,000.00 414,000.00        
805-10-B bridge superstructure & substructure(28' clr. roadway;
90 degree crossing)
4      SPAN 37,000.00 148,000.00 46,000.00 184,000.00        
S-001 vibration monitoring lump      lump 16,000.00 16,000.00 40,000.00 40,000.00        
S-101 concrete approach slabs(28'clr. roadway;45 degree
crossing without asphalt)
2      EACH 10,000.00 20,000.00 23,000.00 46,000.00        
S-102 concrete approach slabs with tapered barrier rails(28'
clr. roadway; 90 degree crossing without asphalt)
2      EACH 14,000.00 28,000.00 29,000.00 58,000.00        
                       
 CONTRACTOR TOTAL       1,626,284.00   1,771,726.50        