February 06, 2014 Error processing SSI file

Letting of 4/22/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-53-0114
Parish: TANGIPAHOA
Routes:
Description: BENNETT RD OVR NATALBANY CRK, COOPER RD OVR COOPER CRK BRDGS
Type Const: grading, class ii base course, superpave ashpaltic concrete, concrete slab span
bridges, and related work.
Estimated Construction Cost: $1,051,542.50
 
RankLicenseBidderConstruction Bid
1 14422 T. L. WALLACE CONSTRUCTION, INC. $993,138.00
2 09476 KEY CONSTRUCTORS, INC. $1,157,954.50
3 09090 GUINN BROTHERS, LLC. $1,178,442.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
T. L. WALLACE CONSTRUCTION, INC.
- 2 -
KEY CONSTRUCTORS, INC.
- 3 -
GUINN BROTHERS, LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00 35,000.00 35,000.00 32,500.00 32,500.00    
202-02-A-01 removal of bridge (sta. 100+00; 55' x 20' conc. bridge
w/timber piling)
1      EACH 5,000.00 5,000.00 10,000.00 10,000.00 25,000.00 25,000.00    
202-02-A-02 removal of bridge (sta. 100+00; 58' x 23' timber
bridge)
1      EACH 5,000.00 5,000.00 10,000.00 10,000.00 20,000.00 20,000.00    
203-04 nonplastic embankment 66      CUYD 100.00 6,600.00 105.00 6,930.00 120.00 7,920.00    
203-05 excavation and embankment lump      LUMP 50,000.00 50,000.00 37,000.00 37,000.00 48,000.00 48,000.00    
204-02 temporary hay or straw bales 20      EACH 14.00 280.00 15.00 300.00 100.00 2,000.00    
204-03 temporary slope drains 104      LNFT 14.00 1,456.00 10.00 1,040.00 10.00 1,040.00    
204-05-A temporary sediment check dams (hay) 14      EACH 200.00 2,800.00 120.00 1,680.00 200.00 2,800.00    
204-06 temporary silt fencing 1,450      LNFT 2.80 4,060.00 5.00 7,250.00 5.00 7,250.00    
302-01 class ii base course 344.1    CUYD 150.00 51,615.00 95.00 32,689.50 100.00 34,410.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
4      CUYD 150.00 600.00 155.00 620.00 500.00 2,000.00    
502-01 superpave asphaltic concrete 269.2    TON 200.00 53,840.00 250.00 67,300.00 300.00 80,760.00    
704-03 blocked out guard rail 50.0    LNFT 22.00 1,100.00 20.00 1,000.00 30.00 1,500.00    
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 65.00 13,000.00 55.00 11,000.00 70.00 14,000.00    
704-09 guard rail anchor sections (turndown) 100.0    LNFT 60.00 6,000.00 30.00 3,000.00 40.00 4,000.00    
704-11-A guard rail end treatment (flared) 4      EACH 2,400.00 9,600.00 2,150.00 8,600.00 2,750.00 11,000.00    
705-01 barbed wire fence 323      LNFT 15.00 4,845.00 10.00 3,230.00 10.00 3,230.00    
711-01-D riprap (55 lb,18" thick ) 559      SQYD 61.00 34,099.00 60.00 33,540.00 90.00 50,310.00    
711-02-A riprap (2 lb) 7      CUYD 200.00 1,400.00 330.00 2,310.00 200.00 1,400.00    
711-02-C riprap (30 lb) 8      CUYD 200.00 1,600.00 335.00 2,680.00 300.00 2,400.00    
711-02-D riprap (55 lb) 19      CUYD 200.00 3,800.00 195.00 3,705.00 300.00 5,700.00    
711-04 geotextile fabric 628      SQYD 3.00 1,884.00 3.75 2,355.00 5.00 3,140.00    
713-01 temporary signs & barricades lump      LUMP 20,830.00 20,830.00 40,000.00 40,000.00 26,000.00 26,000.00    
716-01-A mulch (vegetative) 1.6    TON 700.00 1,120.00 895.00 1,432.00 2,000.00 3,200.00    
717-01 seeding 34      LB 10.00 340.00 9.00 306.00 20.00 680.00    
718-01 fertilizer 760      LB 0.65 494.00 0.95 722.00 3.00 2,280.00    
727-01 mobilization lump      LUMP 50,000.00 50,000.00 200,000.00 200,000.00 115,000.00 115,000.00    
729-16-C object marker assembly (type 3) 12      EACH 75.00 900.00 75.00 900.00 100.00 1,200.00    
740-01 construction layout lump      LUMP 5,000.00 5,000.00 45,000.00 45,000.00 20,000.00 20,000.00    
803-03 steel sheet pile wall 2,319      SQFT 50.00 115,950.00 60.00 139,140.00 60.00 139,140.00    
804-01-B precast concrete piles (14") 1,665      LNFT 45.00 74,925.00 65.00 108,225.00 52.00 86,580.00    
804-12 loading permanent piles 2      EACH 3,500.00 7,000.00 5,000.00 10,000.00 1.00 2.00    
805-10-A bridge superstructure & substructure (24' clr. rdwy.
90deg x-ing)
4      SPAN 42,000.00 168,000.00 32,000.00 128,000.00 46,000.00 184,000.00    
805-10-B bridge superstructure & substructure (28' clr. rdwy.
90deg x-ing , precast only)
4      SPAN 45,000.00 180,000.00 37,000.00 148,000.00 48,000.00 192,000.00    
S-101 concrete approach slabs(24'clr. roadway;90 degree
x-ing;without asphalt)
2      EACH 25,000.00 50,000.00 13,500.00 27,000.00 11,500.00 23,000.00    
S-102 concrete approach slabs(28'clr. roadway;90 degree
x-ing;without asphalt)
2      EACH 25,000.00 50,000.00 14,000.00 28,000.00 12,500.00 25,000.00    
                       
 CONTRACTOR TOTAL       993,138.00   1,157,954.50   1,178,442.00    