Letting of 4/22/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 063-04-0034
Parish: JEFFERSON
Routes: LA 18
Description: LA 18 WIDENING (RIVER ROAD TO HIGHWAY 90)
Type Const: grading, lime treatment, class ii base course, drainage structures, superpave asphaltic
concrete pavement, and related work.
Estimated Construction Cost: $6,295,704.00
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC. $4,913,222.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 75,000.00 75,000.00            
202-01 removal of structures & obstructions lump      LUMP 90,000.00 90,000.00            
202-02-D removal of concrete walks & drives 1,244      SQYD 13.00 16,172.00            
202-02-F removal of concrete combination curb & gutter 367.0    LNFT 11.00 4,037.00            
202-02-G removal of surfacing and stabilized base 23,122      SQYD 6.20 143,356.40            
202-02-I removal of ashpaltic concrete drives (variable
thickness)
733      SQYD 10.00 7,330.00            
203-01 general excavation 17,918      CUYD 10.60 189,930.80            
203-02 drainage excavation 1,940      CUYD 17.50 33,950.00            
203-03 embankment 7,278      CUYD 26.00 189,228.00            
203-04 nonplastic embankment 2,976      CUYD 22.00 65,472.00            
204-02 temporary hay or straw bales 300      EACH 11.60 3,480.00            
204-06 temporary silt fencing 13,362      LNFT 1.50 20,043.00            
302-02-C-01 class ii base course (8" thick)(crushed stone or
recycled pccp)
41,990.1    SQYD 18.00 755,821.80            
304-05 lime treatment (type e) 300.00   TON 385.00 115,500.00            
401-01 aggregate surface course (net section) 535.1    CUYD 80.00 42,808.00            
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 100.00 10,000.00            
502-01 superpave asphaltic concrete 20,454.8    TON 81.00 1,656,838.80            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
175.6    TON 150.00 26,340.00            
509-01 cold planing asphaltic pavement 489      SQYD 10.00 4,890.00            
509-02 contractor retained reclaimed asphaltic pavement - 27      CUYD 1.00 - 27.00            
701-03-F storm drain pipe (15" rcp/pcp) 19      LNFT 160.00 3,040.00            
701-03-I storm drain pipe (24" rcp/pcp) 275      LNFT 80.00 22,000.00            
701-03-K storm drain pipe (30" rcp/pcp) 401      LNFT 150.00 60,150.00            
701-03-M storm drain pipe (36" rcp/pcp) 17      LNFT 375.00 6,375.00            
701-03-O storm drain pipe (48" rcp) 13      LNFT 575.00 7,475.00            
701-04-F storm drain pipe arch (36" equiv. rcpa) 301      LNFT 185.00 55,685.00            
701-04-G storm drain pipe arch (42" equiv. rcpa) 320      LNFT 210.00 67,200.00            
701-04-I storm drain pipe arch (54" equiv. rcpa) 24      LNFT 420.00 10,080.00            
701-04-L storm drain pipe arch (72" equiv. rcpa) 18      LNFT 700.00 12,600.00            
701-05-G-01 side drain pipe (18" rcp) 292      LNFT 75.00 21,900.00            
701-05-I-01 side drain pipe (24" rcp) 50      LNFT 160.00 8,000.00            
701-10-I reinforced concrete pipe (extension)(24") 119      LNFT 90.00 10,710.00            
701-13-I corrugated metal pipe arch (extension)(54" equiv.) 73      LNFT 270.00 19,710.00            
701-15 concrete collar 4      EACH 600.00 2,400.00            
702-02-A manholes (mh-06) 1      EACH 9,000.00 9,000.00            
702-02-B manholes (r-cb-11) 4      EACH 4,500.00 18,000.00            
702-03-A catch basins (cb-01) 7      EACH 4,000.00 28,000.00            
702-03-B catch basins (cb-02) 6      EACH 5,000.00 30,000.00            
704-03 blocked out guard rail 37.5    LNFT 30.00 1,125.00            
704-06 guard rail anchor sections (trailing end) 6.3    LNFT 90.00 567.00            
704-11-A guard rail end treatment (flared) 1      EACH 3,200.00 3,200.00            
706-02-D concrete drive (8" thick) 911.1    SQYD 80.00 72,888.00            
707-03 combination concrete curb & gutter 787.0    LNFT 43.00 33,841.00            
713-01 temporary signs & barricades lump      LUMP 432,000.00 432,000.00            
713-04-A temporary pavement markings (solid line)(4" width) 5.644  MILE 350.00 1,975.40            
713-04-A-01 temporary pvmt. markings (solid line)(4" w)(type i
removable)
6.250  MILE 7,000.00 43,750.00            
717-01 seeding 157      LB 8.00 1,256.00            
718-01 fertilizer 5,233      LB 0.85 4,448.05            
725-01 temporary detour roads 942.2    SQYD 145.00 136,619.00            
726-01 bedding material 421.6    CUYD 126.00 53,121.60            
727-01 mobilization lump      LUMP 158,000.00 158,000.00            
731-02 reflectorized raised pavement markers 2,608      EACH 6.00 15,648.00            
732-01-A plastic pavement striping (4" width) 21,907      LNFT 0.50 10,953.50            
732-01-C plastic pavement striping (8" width) 486      LNFT 1.10 534.60            
732-01-E plastic pavement striping (24" width) 2,244      LNFT 4.50 10,098.00            
732-03-A plastic pavement striping (broken line)(4" width) 2.260  MILE 900.00 2,034.00            
732-04-A plastic pavement legends & symbols (arrow) 7      EACH 240.00 1,680.00            
732-04-C plastic pavement legends & symbols (only) 7      EACH 240.00 1,680.00            
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 450.00 1,800.00            
732-05 removal of existing markings 1.265  MILE 6,000.00 7,590.00            
740-01 construction layout lump      LUMP 44,000.00 44,000.00            
S-001 warning signal 1      EACH 4,300.00 4,300.00            
S-002 temporary drain 1      EACH 4,500.00 4,500.00            
S-003 sawcutting 38,530      INFT 0.60 23,118.00            
                       
 CONTRACTOR TOTAL       4,913,222.95            