Letting of 4/22/2009 LA DOTD Headquarters


READV
go back
Go Back
DBE GOAL FED
Lead Project: 450-08-0051
Parish: E BATON ROUGE, W BATON ROUGE
Routes: I-10
Description: PORT ALLEN - BATON ROUGE (LA 1 - WASHINGTON ST. OVERPASS)
Type Const: signing and related work. & i-10 mississippi river bridge at baton rouge rehabilitation
Estimated Construction Cost: $11,562,002.82
Maximum Number of Days Allowed for Construction: 280
Calculated Daily User Cost: $15,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 26435 C.E.C., INC. $16,089,808.77 280 $20,289,808.77
 
Item Number Item Description Quantity Unit of Measure - 1 -
C.E.C., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 94      LNFT 11.00 1,034.00            
202-02-J removal of sign and support(s) 84      EACH 300.00 25,200.00            
202-02-K removal of sign face(s) 109      EACH 82.00 8,938.00            
202-02-L removal of overhead sign support 14      EACH 6,000.00 84,000.00            
202-02-M removal of overhead support footing 6      EACH 5,500.00 33,000.00            
202-02-N removal of sign support 1      EACH 495.00 495.00            
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 100.0    LNFT 70.00 7,000.00            
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 137.00 863.10            
704-07-A guard rail bridge attachments (single thrie beam) 2.5    LNFT 82.00 205.00            
704-08-A guard rail transitions (single thrie beam) 6.3    LNFT 82.00 516.60            
713-01 temporary signs & barricades lump      LUMP 600,000.00 600,000.00            
713-02-A temporary pavement markings (4" width) 2,120      LNFT 0.30 636.00            
713-08 temporary precast concrete barrier (department
furnished)
4      EACH 1,200.00 4,800.00            
727-01 mobilization lump      LUMP 1,100,000.00 1,100,000.00            
729-01 sign (type a) 995.5    SQFT 23.00 22,896.50            
729-02 sign (type b) 32.8    SQFT 26.00 852.80            
729-04 sign (type d) 858.5    SQFT 26.00 22,321.00            
729-05 sign (type e) 320.0    SQFT 26.00 8,320.00            
729-06 sign (overhead mounted) 5,978.0    SQFT 26.00 155,428.00            
729-08-A mounting (2 1/2" post) 23      EACH 825.00 18,975.00            
729-08-B mounting (3 1/2" post) 6      EACH 910.00 5,460.00            
729-08-B-01 mounting (3 1/2" post)(structure mount) 23      EACH 1,020.00 23,460.00            
729-08-F mounting (w6 x 12) 30      EACH 1,125.00 33,750.00            
729-08-F-01 mounting (w6 x 12)(structure mount) 1      EACH 1,705.00 1,705.00            
729-09-A mounting (overhead truss)(ground mounted)(36' span) 1      EACH 57,145.00 57,145.00            
729-09-B mounting (overhead truss)(ground mounted)(48' span) 3      EACH 64,325.00 192,975.00            
729-09-C mounting (overhead truss)(ground mounted)(66' span) 1      EACH 72,780.00 72,780.00            
729-09-D mounting (overhead truss)(ground mounted)(72' span) 1      EACH 73,535.00 73,535.00            
729-09-E mounting (overhead truss)(ground mounted)(78' span) 1      EACH 96,140.00 96,140.00            
729-09-F mounting (overhead truss)(ground mounted)(84' span) 1      EACH 98,590.00 98,590.00            
729-13 mounting (bridge fascia mounted) 1      EACH 7,700.00 7,700.00            
729-18 milepost assembly (structure mounted) 4      EACH 250.00 1,000.00            
729-18-A milepost assembly (structure mounted)(secondary) 32      EACH 250.00 8,000.00            
729-20 footings for overhead mountings (truss) 8      EACH 23,000.00 184,000.00            
729-21 u-channel post 20      EACH 105.00 2,100.00            
730-11 removal and disposal of electrical equipment lump      LUMP 3,850.00 3,850.00            
731-02 reflectorized raised pavement markers 8,054      EACH 6.60 53,156.40            
732-02-A plastic pavement striping (solid line) (4" width) 24.000  MILE 3,465.00 83,160.00            
732-02-C plastic pavement striping (solid line) (8" width) 12.250  MILE 7,150.00 87,587.50            
732-02-E plastic pavement striping (solid line) (24" width) 0.100  MILE 20,900.00 2,090.00            
732-03-A-01 plastic pavement striping (broken line)(4"width)
preformed marking tape (contrast tape)
8.000  MILE 5,445.00 43,560.00            
732-04-F-01 plastic pavement legends & symbols (exit only)
(preformed marking tape-type v)
4      EACH 1,100.00 4,400.00            
732-04-F-04 plastic pavement legends & symbols (preformed
heat-applied retroreflective thermoplastic
shields)(125 mils)(60"x180")
15      EACH 1,100.00 16,500.00            
732-05 removal of existing markings 7.800  MILE 6,490.00 50,622.00            
740-01 construction layout lump      LUMP 150,000.00 150,000.00            
807-08 structural metalwork lump      LUMP 4,200,000.00 4,200,000.00            
S-001 portable impact attenuator (construction zone) 2      EACH 18,000.00 36,000.00            
S-002 dynamic message sign unit 6      EACH 24,000.00 144,000.00            
S-003 removing and reinstalling guard rail 100      LNFT 27.50 2,750.00            
S-004-A re-routing conduit at sign location 4-8 lump      LUMP 5,500.00 5,500.00            
S-004-B re-routing conduit at sign location 5-6 lump      LUMP 5,500.00 5,500.00            
S-101-A steel support bracket - location 5-6 1      EACH 200,000.00 200,000.00            
S-101-B steel support bracket - location 5-1 1      EACH 200,000.00 200,000.00            
S-101-C steel support bracket - location 4-9 1      EACH 200,000.00 200,000.00            
S-101-D steel support bracket - location 4-8 1      EACH 200,000.00 200,000.00            
S-102-A concrete support blister - location 9-12 1      EACH 200,000.00 200,000.00            
S-102-B concrete support blister - location 8-21 1      EACH 200,000.00 200,000.00            
S-103-A steel bracket supported truss assembly - location 5-6 1      EACH 270,000.00 270,000.00            
S-103-B steel bracket supported truss assembly - location 5-1 1      EACH 240,000.00 240,000.00            
S-103-C steel bracket supported truss assembly - location 4-9 1      EACH 240,000.00 240,000.00            
S-103-D steel bracket supported truss assembly - location 4-8 1      EACH 250,000.00 250,000.00            
S-104-A concrete blister supported truss assembly - location
9-12
1      EACH 40,000.00 40,000.00            
S-104-B concrete blister supported truss assembly - location
8-21
1      EACH 40,000.00 40,000.00            
S-105-A steel adapter bracket - location 4-1 1      EACH 16,000.00 16,000.00            
S-105-B steel adapter bracket - location 8-21 1      EACH 16,000.00 16,000.00            
S-105-C steel adapter bracket - location 9-5 1      EACH 16,000.00 16,000.00            
S-105-D steel adapter bracket - location 9-6 1      EACH 16,000.00 16,000.00            
S-106 installation of bearing plates lump      LUMP 165,000.00 165,000.00            
S-107 required jacking operation for mod. of false chords at
p.p's 21 and 35
lump      LUMP 300,000.00 300,000.00            
S-108 required jacking operation for mod. of longitudinal
struts
lump      LUMP 150,000.00 150,000.00            
S-117 repairs to existing type ii floorbeam retrofits 14      EACH 6,500.00 91,000.00            
S-118 proposed type ii floorbeam retrofits 16      EACH 10,000.00 160,000.00            
S-119 repairs to existing type iii and iv floorbeam
retrofits
29      EACH 10,000.00 290,000.00            
 SUBTOTAL GENERAL       11,342,496.90            
                       
ALTERNATE A replacement of main truss deck drain pipes                    
                       
ALTERNATE A1 replacing drain pipes with steel piping                    
S-109 field verification of design dimensions lump      LUMP 30,000.00 30,000.00            
S-110 remove existing piping & bracing and insall new 8"
steel piping, bracing, & hardware @ p.pts.
l0-l13,l15-l41, & l43-l56
108      EACH 7,000.00 756,000.00            
S-111 remove existing piping & bracing and insall new 8"
steel piping, bracing, & hardware @ mid panel
pts. between l14 & l42
4      EACH 7,000.00 28,000.00            
S-112 remove existing piping & bracing and insall new 8"
steel piping, bracing, & hardware @ mid panel
pts. between l24 & l32
16      EACH 7,000.00 112,000.00            
 SUBTOTAL ALT A1       926,000.00            
    pts. between l24 & l32                    
ALTERNATE A2 replacing drain pipes with fiberglass piping pts. between l24 & l32                    
S-113 field verification of design dimensions lump      LUMP 0.00 0.00            
S-114 remove existing piping & bracing, insall new 8"
fiberglass piping,bracing,& hardware @ p. pts.
l0-l13,l15-l41, & l43-l56
108      EACH 0.00 0.00            
S-115 remove existing piping & bracing, insall new 8"
fiberglass piping,bracing,& hardware @ mid panel
pts. between l14 & l42
4      EACH 0.00 0.00            
S-116 remove existing piping & bracing, insall new 8"
fiberglass piping,bracing,& hardware @ mid panel
pts. between l24 & l32
16      EACH 0.00 0.00            
    pts. between l24 & l32                    
ALTERNATE D additive alternate pts. between l24 & l32                    
    pts. between l24 & l32                    
ALTERNATE D1 add. alt. d1 - copolymer overlay system pts. between l24 & l32                    
713-01-D temporary signs & barricades (additive alternate d1) lump      LUMP 105,000.00 105,000.00            
713-03-B-D temporary pavement markings (broken line)(4" width)
(10' length) (additive alternate d1)
4.394  MILE 577.00 2,535.34            
713-03-B-01-D temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) (additive alternate d1)
10.985  MILE 4,290.00 47,125.65            
713-04-A-D temporary pavement markings (solid line)(4" width)
(additive alternate d1)
3.656  MILE 1,000.00 3,656.00            
713-04-A-01-D temporary pvmt. markings (solid line)(4" w)(type i
removable) (additive alternate d1)
9.035  MILE 17,425.00 157,434.88            
713-06-D temporary reflectorized raised pavement markers
(additive alternate d1)
5,800      EACH 5.60 32,480.00            
727-01-D mobilization (additive alternate d1) lump      LUMP 82,000.00 82,000.00            
S-120-D epoxy-urethane overlay system (additive alternate d1) 41,206.00   SQYD 80.00 3,296,480.00            
S-121-D bridge deck patching (additive alternate d1) 2.00   SQYD 3,300.00 6,600.00            
S-122-D dynamic message sign unit (additive alternate d1) 4      EACH 22,000.00 88,000.00            
 SUBTOTAL ALT D1       3,821,311.87            
                       
 ITEM TOTAL (CONSTRUCTION BID)       16,089,808.77            
 NUMBER OF DAYS BID AT $15,000 PER DAY.       4,200,000.00            
 TOTAL BID       20,289,808.77            