| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C.E.C., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
94   |
LNFT |
11.00 |
1,034.00 |
|
|
|
|
|
|
| 202-02-J |
removal of sign and support(s)
|
84   |
EACH |
300.00 |
25,200.00 |
|
|
|
|
|
|
| 202-02-K |
removal of sign face(s)
|
109   |
EACH |
82.00 |
8,938.00 |
|
|
|
|
|
|
| 202-02-L |
removal of overhead sign support
|
14   |
EACH |
6,000.00 |
84,000.00 |
|
|
|
|
|
|
| 202-02-M |
removal of overhead support footing
|
6   |
EACH |
5,500.00 |
33,000.00 |
|
|
|
|
|
|
| 202-02-N |
removal of sign support
|
1   |
EACH |
495.00 |
495.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
70.00 |
7,000.00 |
|
|
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
6.3 |
LNFT |
137.00 |
863.10 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
2.5 |
LNFT |
82.00 |
205.00 |
|
|
|
|
|
|
| 704-08-A |
guard rail transitions (single thrie beam)
|
6.3 |
LNFT |
82.00 |
516.60 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
600,000.00 |
600,000.00 |
|
|
|
|
|
|
| 713-02-A |
temporary pavement markings (4" width)
|
2,120   |
LNFT |
0.30 |
636.00 |
|
|
|
|
|
|
| 713-08 |
temporary precast concrete barrier (department
furnished) |
4   |
EACH |
1,200.00 |
4,800.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,100,000.00 |
1,100,000.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
995.5 |
SQFT |
23.00 |
22,896.50 |
|
|
|
|
|
|
| 729-02 |
sign (type b)
|
32.8 |
SQFT |
26.00 |
852.80 |
|
|
|
|
|
|
| 729-04 |
sign (type d)
|
858.5 |
SQFT |
26.00 |
22,321.00 |
|
|
|
|
|
|
| 729-05 |
sign (type e)
|
320.0 |
SQFT |
26.00 |
8,320.00 |
|
|
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
5,978.0 |
SQFT |
26.00 |
155,428.00 |
|
|
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
23   |
EACH |
825.00 |
18,975.00 |
|
|
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
6   |
EACH |
910.00 |
5,460.00 |
|
|
|
|
|
|
| 729-08-B-01 |
mounting (3 1/2" post)(structure mount)
|
23   |
EACH |
1,020.00 |
23,460.00 |
|
|
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
30   |
EACH |
1,125.00 |
33,750.00 |
|
|
|
|
|
|
| 729-08-F-01 |
mounting (w6 x 12)(structure mount)
|
1   |
EACH |
1,705.00 |
1,705.00 |
|
|
|
|
|
|
| 729-09-A |
mounting (overhead truss)(ground mounted)(36' span)
|
1   |
EACH |
57,145.00 |
57,145.00 |
|
|
|
|
|
|
| 729-09-B |
mounting (overhead truss)(ground mounted)(48' span)
|
3   |
EACH |
64,325.00 |
192,975.00 |
|
|
|
|
|
|
| 729-09-C |
mounting (overhead truss)(ground mounted)(66' span)
|
1   |
EACH |
72,780.00 |
72,780.00 |
|
|
|
|
|
|
| 729-09-D |
mounting (overhead truss)(ground mounted)(72' span)
|
1   |
EACH |
73,535.00 |
73,535.00 |
|
|
|
|
|
|
| 729-09-E |
mounting (overhead truss)(ground mounted)(78' span)
|
1   |
EACH |
96,140.00 |
96,140.00 |
|
|
|
|
|
|
| 729-09-F |
mounting (overhead truss)(ground mounted)(84' span)
|
1   |
EACH |
98,590.00 |
98,590.00 |
|
|
|
|
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
1   |
EACH |
7,700.00 |
7,700.00 |
|
|
|
|
|
|
| 729-18 |
milepost assembly (structure mounted)
|
4   |
EACH |
250.00 |
1,000.00 |
|
|
|
|
|
|
| 729-18-A |
milepost assembly (structure mounted)(secondary)
|
32   |
EACH |
250.00 |
8,000.00 |
|
|
|
|
|
|
| 729-20 |
footings for overhead mountings (truss)
|
8   |
EACH |
23,000.00 |
184,000.00 |
|
|
|
|
|
|
| 729-21 |
u-channel post
|
20   |
EACH |
105.00 |
2,100.00 |
|
|
|
|
|
|
| 730-11 |
removal and disposal of electrical equipment
|
lump |
LUMP |
3,850.00 |
3,850.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
8,054   |
EACH |
6.60 |
53,156.40 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
24.000 |
MILE |
3,465.00 |
83,160.00 |
|
|
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
12.250 |
MILE |
7,150.00 |
87,587.50 |
|
|
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.100 |
MILE |
20,900.00 |
2,090.00 |
|
|
|
|
|
|
| 732-03-A-01 |
plastic pavement striping (broken line)(4"width)
preformed marking tape (contrast tape) |
8.000 |
MILE |
5,445.00 |
43,560.00 |
|
|
|
|
|
|
| 732-04-F-01 |
plastic pavement legends & symbols (exit only)
(preformed marking tape-type v) |
4   |
EACH |
1,100.00 |
4,400.00 |
|
|
|
|
|
|
| 732-04-F-04 |
plastic pavement legends & symbols (preformed
heat-applied retroreflective thermoplastic shields)(125 mils)(60"x180") |
15   |
EACH |
1,100.00 |
16,500.00 |
|
|
|
|
|
|
| 732-05 |
removal of existing markings
|
7.800 |
MILE |
6,490.00 |
50,622.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
150,000.00 |
150,000.00 |
|
|
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
4,200,000.00 |
4,200,000.00 |
|
|
|
|
|
|
| S-001 |
portable impact attenuator (construction zone)
|
2   |
EACH |
18,000.00 |
36,000.00 |
|
|
|
|
|
|
| S-002 |
dynamic message sign unit
|
6   |
EACH |
24,000.00 |
144,000.00 |
|
|
|
|
|
|
| S-003 |
removing and reinstalling guard rail
|
100   |
LNFT |
27.50 |
2,750.00 |
|
|
|
|
|
|
| S-004-A |
re-routing conduit at sign location 4-8
|
lump |
LUMP |
5,500.00 |
5,500.00 |
|
|
|
|
|
|
| S-004-B |
re-routing conduit at sign location 5-6
|
lump |
LUMP |
5,500.00 |
5,500.00 |
|
|
|
|
|
|
| S-101-A |
steel support bracket - location 5-6
|
1   |
EACH |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| S-101-B |
steel support bracket - location 5-1
|
1   |
EACH |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| S-101-C |
steel support bracket - location 4-9
|
1   |
EACH |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| S-101-D |
steel support bracket - location 4-8
|
1   |
EACH |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| S-102-A |
concrete support blister - location 9-12
|
1   |
EACH |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| S-102-B |
concrete support blister - location 8-21
|
1   |
EACH |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| S-103-A |
steel bracket supported truss assembly - location 5-6
|
1   |
EACH |
270,000.00 |
270,000.00 |
|
|
|
|
|
|
| S-103-B |
steel bracket supported truss assembly - location 5-1
|
1   |
EACH |
240,000.00 |
240,000.00 |
|
|
|
|
|
|
| S-103-C |
steel bracket supported truss assembly - location 4-9
|
1   |
EACH |
240,000.00 |
240,000.00 |
|
|
|
|
|
|
| S-103-D |
steel bracket supported truss assembly - location 4-8
|
1   |
EACH |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| S-104-A |
concrete blister supported truss assembly - location
9-12 |
1   |
EACH |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| S-104-B |
concrete blister supported truss assembly - location
8-21 |
1   |
EACH |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| S-105-A |
steel adapter bracket - location 4-1
|
1   |
EACH |
16,000.00 |
16,000.00 |
|
|
|
|
|
|
| S-105-B |
steel adapter bracket - location 8-21
|
1   |
EACH |
16,000.00 |
16,000.00 |
|
|
|
|
|
|
| S-105-C |
steel adapter bracket - location 9-5
|
1   |
EACH |
16,000.00 |
16,000.00 |
|
|
|
|
|
|
| S-105-D |
steel adapter bracket - location 9-6
|
1   |
EACH |
16,000.00 |
16,000.00 |
|
|
|
|
|
|
| S-106 |
installation of bearing plates
|
lump |
LUMP |
165,000.00 |
165,000.00 |
|
|
|
|
|
|
| S-107 |
required jacking operation for mod. of false chords at
p.p's 21 and 35 |
lump |
LUMP |
300,000.00 |
300,000.00 |
|
|
|
|
|
|
| S-108 |
required jacking operation for mod. of longitudinal
struts |
lump |
LUMP |
150,000.00 |
150,000.00 |
|
|
|
|
|
|
| S-117 |
repairs to existing type ii floorbeam retrofits
|
14   |
EACH |
6,500.00 |
91,000.00 |
|
|
|
|
|
|
| S-118 |
proposed type ii floorbeam retrofits
|
16   |
EACH |
10,000.00 |
160,000.00 |
|
|
|
|
|
|
| S-119 |
repairs to existing type iii and iv floorbeam
retrofits |
29   |
EACH |
10,000.00 |
290,000.00 |
|
|
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
11,342,496.90 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
replacement of main truss deck drain pipes
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
replacing drain pipes with steel piping
|
|
|
|
|
|
|
|
|
|
|
| S-109 |
field verification of design dimensions
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| S-110 |
remove existing piping & bracing and insall new 8"
steel piping, bracing, & hardware @ p.pts. l0-l13,l15-l41, & l43-l56 |
108   |
EACH |
7,000.00 |
756,000.00 |
|
|
|
|
|
|
| S-111 |
remove existing piping & bracing and insall new 8"
steel piping, bracing, & hardware @ mid panel pts. between l14 & l42 |
4   |
EACH |
7,000.00 |
28,000.00 |
|
|
|
|
|
|
| S-112 |
remove existing piping & bracing and insall new 8"
steel piping, bracing, & hardware @ mid panel pts. between l24 & l32 |
16   |
EACH |
7,000.00 |
112,000.00 |
|
|
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
926,000.00 |
|
|
|
|
|
|
| |
pts. between l24 & l32 |
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
replacing drain pipes with fiberglass piping
pts. between l24 & l32 |
|
|
|
|
|
|
|
|
|
|
| S-113 |
field verification of design dimensions
|
lump |
LUMP |
0.00 |
0.00 |
|
|
|
|
|
|
| S-114 |
remove existing piping & bracing, insall new 8"
fiberglass piping,bracing,& hardware @ p. pts. l0-l13,l15-l41, & l43-l56 |
108   |
EACH |
0.00 |
0.00 |
|
|
|
|
|
|
| S-115 |
remove existing piping & bracing, insall new 8"
fiberglass piping,bracing,& hardware @ mid panel pts. between l14 & l42 |
4   |
EACH |
0.00 |
0.00 |
|
|
|
|
|
|
| S-116 |
remove existing piping & bracing, insall new 8"
fiberglass piping,bracing,& hardware @ mid panel pts. between l24 & l32 |
16   |
EACH |
0.00 |
0.00 |
|
|
|
|
|
|
| |
pts. between l24 & l32 |
|
|
|
|
|
|
|
|
|
|
| ALTERNATE D |
additive alternate
pts. between l24 & l32 |
|
|
|
|
|
|
|
|
|
|
| |
pts. between l24 & l32 |
|
|
|
|
|
|
|
|
|
|
| ALTERNATE D1 |
add. alt. d1 - copolymer overlay system
pts. between l24 & l32 |
|
|
|
|
|
|
|
|
|
|
| 713-01-D |
temporary signs & barricades (additive alternate d1)
|
lump |
LUMP |
105,000.00 |
105,000.00 |
|
|
|
|
|
|
| 713-03-B-D |
temporary pavement markings (broken line)(4" width)
(10' length) (additive alternate d1) |
4.394 |
MILE |
577.00 |
2,535.34 |
|
|
|
|
|
|
| 713-03-B-01-D |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) (additive alternate d1) |
10.985 |
MILE |
4,290.00 |
47,125.65 |
|
|
|
|
|
|
| 713-04-A-D |
temporary pavement markings (solid line)(4" width)
(additive alternate d1) |
3.656 |
MILE |
1,000.00 |
3,656.00 |
|
|
|
|
|
|
| 713-04-A-01-D |
temporary pvmt. markings (solid line)(4" w)(type i
removable) (additive alternate d1) |
9.035 |
MILE |
17,425.00 |
157,434.88 |
|
|
|
|
|
|
| 713-06-D |
temporary reflectorized raised pavement markers
(additive alternate d1) |
5,800   |
EACH |
5.60 |
32,480.00 |
|
|
|
|
|
|
| 727-01-D |
mobilization (additive alternate d1)
|
lump |
LUMP |
82,000.00 |
82,000.00 |
|
|
|
|
|
|
| S-120-D |
epoxy-urethane overlay system (additive alternate d1)
|
41,206.00 |
SQYD |
80.00 |
3,296,480.00 |
|
|
|
|
|
|
| S-121-D |
bridge deck patching (additive alternate d1)
|
2.00 |
SQYD |
3,300.00 |
6,600.00 |
|
|
|
|
|
|
| S-122-D |
dynamic message sign unit (additive alternate d1)
|
4   |
EACH |
22,000.00 |
88,000.00 |
|
|
|
|
|
|
| | SUBTOTAL ALT D1 |
|
|
|
3,821,311.87 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
16,089,808.77 |
|
|
|
|
|
|
| | NUMBER OF DAYS BID AT $15,000 PER DAY. |
|
|
|
4,200,000.00 |
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
20,289,808.77 |
|
|
|
|
|
|
|