| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - CYCLE CONSTRUCTION CO. L.L.C. |
- 2 - GIBBS CONSTRUCTION LLC |
- 3 - SHAVERS-WHITTLE CONSTRUCTION INC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
45,000.00 |
45,000.00 |
7,360.00 |
7,360.00 |
25,000.00 |
25,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
26,000.00 |
26,000.00 |
14,700.00 |
14,700.00 |
35,000.00 |
35,000.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta. 2+150; 11.582 m x 7.163 m
conc. bridge) |
1   |
ea |
80,000.00 |
80,000.00 |
154,705.00 |
154,705.00 |
110,000.00 |
110,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
142   |
sq m |
20.00 |
2,840.00 |
28.00 |
3,976.00 |
220.00 |
31,240.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
46   |
sq m |
44.00 |
2,024.00 |
35.00 |
1,610.00 |
100.00 |
4,600.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
lump |
20,000.00 |
20,000.00 |
6,855.00 |
6,855.00 |
138,000.00 |
138,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
7   |
ea |
125.00 |
875.00 |
75.00 |
525.00 |
95.00 |
665.00 |
|
|
| 204-06 |
temporary silt fencing
|
74   |
ln m |
10.00 |
740.00 |
24.00 |
1,776.00 |
9.00 |
666.00 |
|
|
| 302-01-A |
class ii base course (stone)
|
95.1 |
cu m |
230.00 |
21,873.00 |
380.00 |
36,138.00 |
375.00 |
35,662.50 |
|
|
| 502-01 |
superpave asphaltic concrete
|
61.0 |
Mg |
370.00 |
22,570.00 |
844.00 |
51,484.00 |
400.00 |
24,400.00 |
|
|
| 601-01-G-01 |
portland cement concrete pavement (200 mm thick)
(reinforced) |
92.7 |
sq m |
140.00 |
12,978.00 |
112.00 |
10,382.40 |
350.00 |
32,445.00 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
2   |
ea |
350.00 |
700.00 |
735.00 |
1,470.00 |
250.00 |
500.00 |
|
|
| 702-04-A-01 |
adjusting manholes (sewer)
|
1   |
ea |
1,500.00 |
1,500.00 |
2,210.00 |
2,210.00 |
2,500.00 |
2,500.00 |
|
|
| 706-01-A |
concrete walk (100 mm thick)
|
51.6 |
sq m |
100.00 |
5,160.00 |
107.00 |
5,521.20 |
280.00 |
14,448.00 |
|
|
| 706-04 |
handicapped curb ramps
|
2   |
ea |
1,300.00 |
2,600.00 |
1,235.00 |
2,470.00 |
450.00 |
900.00 |
|
|
| 707-01-A |
concrete curb (mountable type)
|
23.0 |
ln m |
38.00 |
874.00 |
81.00 |
1,863.00 |
30.00 |
690.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
45,000.00 |
45,000.00 |
6,830.00 |
6,830.00 |
40,000.00 |
40,000.00 |
|
|
| 713-07 |
temporary precast concrete barrier (contractor
furnished) |
10   |
ea |
1,500.00 |
15,000.00 |
1,450.00 |
14,500.00 |
1,800.00 |
18,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
175.5 |
kg |
13.00 |
2,281.50 |
66.00 |
11,583.00 |
5.00 |
877.50 |
|
|
| 717-01 |
seeding
|
2   |
kg |
13.00 |
26.00 |
100.00 |
200.00 |
50.00 |
100.00 |
|
|
| 718-01 |
fertilizer
|
44   |
kg |
26.00 |
1,144.00 |
90.00 |
3,960.00 |
5.00 |
220.00 |
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
10   |
sq m |
5.00 |
50.00 |
18.00 |
180.00 |
38.00 |
380.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
200,000.00 |
200,000.00 |
139,750.00 |
139,750.00 |
175,000.00 |
175,000.00 |
|
|
| 729-01 |
sign (type a)
|
1.86 |
sq m |
235.00 |
437.10 |
500.00 |
930.00 |
285.00 |
530.10 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
101.00 |
404.00 |
260.00 |
1,040.00 |
110.00 |
440.00 |
|
|
| 729-21 |
u-channel post
|
2   |
ea |
75.00 |
150.00 |
75.00 |
150.00 |
85.00 |
170.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
20,000.00 |
20,000.00 |
14,710.00 |
14,710.00 |
50,000.00 |
50,000.00 |
|
|
| 803-03-A |
steel sheet pile wall (with concrete cap monolith and
railing) |
184.2 |
sq m |
900.00 |
165,780.00 |
1,229.00 |
226,381.80 |
1,000.00 |
184,200.00 |
|
|
| 803-05 |
temporary sheeting
|
lump |
lump |
150,000.00 |
150,000.00 |
198,160.00 |
198,160.00 |
350,000.00 |
350,000.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
368.0 |
ln m |
520.00 |
191,360.00 |
676.00 |
248,768.00 |
640.00 |
235,520.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
ea |
17,000.00 |
17,000.00 |
2,210.00 |
2,210.00 |
14,000.00 |
14,000.00 |
|
|
| 805-10-A |
bridge superstruct & substruct (90deg xing 7.60m/7.67m
rdwy w/1.525m sidewalk w/railing)(cip or precast alt) |
3   |
span |
190,000.00 |
570,000.00 |
153,700.00 |
461,100.00 |
160,000.00 |
480,000.00 |
|
|
| S-001 |
vibration monitoring
|
lump |
lump |
40,000.00 |
40,000.00 |
7,360.00 |
7,360.00 |
20,000.00 |
20,000.00 |
|
|
| S-002 |
undercutting (underneath existing base course)
|
lump |
lump |
3,500.00 |
3,500.00 |
5,300.00 |
5,300.00 |
8,000.00 |
8,000.00 |
|
|
| S-003 |
root pruning (crepe myrtle)
|
2   |
each |
300.00 |
600.00 |
735.00 |
1,470.00 |
750.00 |
1,500.00 |
|
|
| S-004 |
50mm (2") new hdpe water (reducer to meter with
fittings), s&wb item no. c741(51)(a) |
17   |
ln m |
265.00 |
4,505.00 |
390.00 |
6,630.00 |
750.00 |
12,750.00 |
|
|
| S-005 |
200mm(8") new water main with main line fittings (pvc),
s&wb item no. c741(51)(c) |
62   |
ln m |
420.00 |
26,040.00 |
618.00 |
38,316.00 |
2,300.00 |
142,600.00 |
|
|
| S-006 |
20omm (8")new water main with main line fittings d.i.
class 56 with cement mortar lining, s&wb item no. c7421(51)(c-01) |
25   |
ln m |
470.00 |
11,750.00 |
691.00 |
17,275.00 |
3,100.00 |
77,500.00 |
|
|
| S-007 |
new 200mm (8") sewer mains (pvc), s&wb item no.
c742(51)(c) |
27   |
ln m |
2,800.00 |
75,600.00 |
4,119.00 |
111,213.00 |
1,150.00 |
31,050.00 |
|
|
| S-008 |
new 200mm (8") sewer main d.i. class 56 with 40 mil.
"polybond" liner or approved equal, s&wb item no. c742(51)(c-01) |
36   |
ln m |
700.00 |
25,200.00 |
1,030.00 |
37,080.00 |
2,900.00 |
104,400.00 |
|
|
| S-009 |
new 600mm (24") d.i. class 56 casing pipe, s&wb item
no. c742(51)(i-01) |
25   |
ln m |
3,500.00 |
87,500.00 |
5,145.00 |
128,625.00 |
3,100.00 |
77,500.00 |
|
|
| S-010 |
new sewer manhole, s&wb item no. c742(55)
|
11.3 |
vmh |
3,900.00 |
44,070.00 |
5,734.00 |
64,794.20 |
9,000.00 |
101,700.00 |
|
|
| S-101 |
concrete approach slab (90deg xing 7.60m or 7.67m rdwy
w/1.525m sidewalk w/tapered barrier & ped. railing)(c.i.p.) |
1   |
each |
24,000.00 |
24,000.00 |
12,500.00 |
12,500.00 |
40,000.00 |
40,000.00 |
|
|
| S-102 |
concrete approach slab (90deg xing 7.60m or 7.67m rdwy
w/tapered barrier railing)(c.i.p.) |
1   |
each |
21,000.00 |
21,000.00 |
10,050.00 |
10,050.00 |
35,000.00 |
35,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,988,131.60 |
|
2,074,111.60 |
|
2,658,154.10 |
|
|
|