UPDATE***US 167 North Business; Rapides Parish
Wednesday, March 30, 2016 at 12:38:28 PM
3/30/2016
12:35 pm

UPDATE

This specific press release work has been completed.

US 167 North Business; Rapides Parish
0.15 Miles South of US 167 S
Mile Post 0.025; Control Section 023-01

The Louisiana Department of Transportation and Development (DOTD), advises the public that US 167 North (Overton St) is open. The reason for this closure was to perform utility work 1.8 miles north of US 71.




02-16-2016
4:08 pm

US 167 North Business; Rapides Parish
0.15 Miles South of US 167 S
Mile Post 0.025; Control Section 023-01

The Louisiana Department of Transportation and Development (DOTD), advises the public that US 167 North (Overton St) will be closed to thru traffic on February 22, 2016 from 7:30A.M. until 5:00P.M. on February 24, 2016. The reason for this closure is to perform utility work 1.8 miles north of US 71.

Permit/Detour section
Local traffic detour will be from Lee St. (US 167 Business) to Branch St. to Overton St. (US 167 Business North). Thru traffic detour will be from Lee St. (US 167 Business) to Fenner St. to Overton St. (US 167 Business North).

Safety Reminder
DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.

Additional Information
Call (318) 561-5100 or (800) 542-3509 or 511 or visit www.511LA.org for additional information. Motorists may also monitor the LA DOTD website @ www.dotd.la.gov, by selecting MYDOTD, the Way to Geaux Application for iPhone or Android devices, the DOTD Facebook page or the LA DOTD Twitter page, @Alex_Traffic for further information and details.

Project Contact
Chris Soileau, Construction Coordinator
318-561-5111
Chris.Soileau2@la.gov

Media Contact
Ms. Deidra Druilhet, Public Information Officer
Avoyelles, Rapides, Vernon Parishes
Phone # 337-262-6133
deidra.druilhet@la.gov