I10, East Baton Rouge Parish, Ramp/Lane/Street Closures,
Monday, January 28, 2013 at 2:36:00 PM
Monday, 1/28/13 (9pm-5am)

I-10 EB right lane closure from the Siegen overpass through the end of project for barrier rail removal.
I-10 EB right lane closure from the Ward’s Creek Bridge through the Bluebonnet overpass for paving.
NB/SB Bluebonnet reduced to one lane for painting.

EB Siegen on ramp closure for barrier rail removal. Detour: I-10 WB feeder road, U turn at Picardy overpass to Picardy EB on ramp.
EB Bluebonnet off ramp closure for concrete paving. Detour: EB Mall of LA exit, U turn on Picardy overpass to Bluebonnet.


Tuesday, 1/29/13 (9pm-5am)

I-10 WB right lane closure before and at Siegen overpass for barrier rail removal.
I-10 EB right lane closure from the Ward’s Creek Bridge through the Bluebonnet overpass for paving.
NB/SB Bluebonnet reduced to one lane for painting.

EB Bluebonnet off ramp closure for concrete paving. Detour: EB Mall of LA exit, U turn on Picardy overpass to Bluebonnet.


Wednesday, 1/30/13 (9pm-5am)

I-10 WB alternating right lane and left lane closures from before Siegen overpass through the Bluebonnet/Mall of LA off ramp for traffic switch.
NB/SB Essen reduced to one lane for painting.

Ramp closures will be alternating, ramps will not be closed simultaneously
WB Siegen off ramp closure for barrier rail removal. Detour: WB Mall of LA/Picardy off ramp, U turn at Picardy on ramp to Siegen.
WB Bluebonnet/Mall of LA off ramp closure for barrier rail removal. Detour: WB Essen off ramp, U turn onto I-10 EB, exit Bluebonnet.


Thursday, 1/31/13 (9pm-5am)

I-10 EB right and left lane alternating closures from the Siegen overpass through the end of project for traffic switch.
NB/SB Essen reduced to one lane for painting.

Ramp closures will be alternating, ramps will not be closed simultaneously
EB Siegen on ramp closure for traffic switch. Detour: I-10 WB feeder road, U turn at Picardy overpass to Picardy EB on ramp.
EB Picardy on ramp closure for traffic switch. Detour: Siegen south to South Mall Drive, U turn onto Siegen north to I-10 EB Siegen on ramp.


These closures will allow vehicles 11-feet wide or less to pass through the construction zone.

I-10 Westbound will be open for regular traffic but oversize vehicles must detour using Exit 187 (US-61 North / Sorrento). Diverted traffic will be able to reach I-10 by traveling north along US-61, exiting onto I-12 Westbound and traveling west along I-12 until reaching I-10.

I-10 Eastbound will be open for regular traffic but oversize vehicles traveling east on I-10 must detour to I-12 at the 10/12 split, travel east along I-12, and use Exit 2A (US-61 South / Airline Hwy). Oversize vehicles traveling west on I-12 must detour using Exit 2A (US-61 South / Airline Hwy). Diverted traffic will be able to reach I-10 by traveling south along US-61 until reaching the I-10 on-ramp near Sorrento.

DOTD appreciates your patience and reminds you to please drive with caution through the construction site and to be on the lookout for work crews and their equipment.