I-10 Eastbound., St. Charles Parish, S.P. H.009326
Friday, September 18, 2015 at 7:26:30 AM
Eastbound I-10 in St. Charles Parishes (Bonnet Carre Spillway Bridge) Mile Markers 216 to 222 – alternating (left or right) lane and shoulder closures (1 mile sections at a time) nightly from:

8 PM to 5 AM on Monday, September 21st thru Thursday, September 24th;
9 PM to 7 AM on Friday, September 25th and Saturday, September 26th;

while crews perform bridge deck patching, weather permitting.

These closures will allow vehicles 12 feet wide or smaller to pass through the construction zone. Road is open for regular traffic but oversize vehicles should detour using US 51 southbound to US 61 southbound.

DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.

***************************
Francis Simon, Jr., P.E.
Project Engineer
LADOTD, Gang 232 / Dist. 02
P.O. Box 10252
Harahan, LA 70181
Off. (504) 736-7090
Fax (504) 437-3183
Cell (504) 210-7987
E-mail: Francis.Simon@la.gov
***************************