Bridge Inspections
Friday, March 14, 2014 at 1:28:45 PM
On Monday, March 17, 2014, LA 182 at the Charenton Canal Bridge will be closed for routine Bridge Inspections from 8:00 am to 4:00 pm, weather permitting. The detour route for this closure will be LA 318, US 90 and LA 83.

On Tuesday, March 18, 2014, LA 182 at the Berwick Bridge over the Atchafalaya River will be closed for routine Bridge Inspections from 8:00 am to 4:00 pm, weather permitting. The detour route for this closure will be US 90, which parallels this route and connects to LA 182 on each side of the river.

On Wednesday, March 19, 2014, US 90 over the Atchafalaya River – Morgan City Bridge - will be reduced to one lane for routine Bridge Inspections from 8:00 am to 1:00 pm, weather permitting. No detour is necessary nor will permit loads be impacted by this lane restriction.

On Wednesday, March 19, 2014, LA 182 over Bayou Boeuf at Amelia will closed for routine Bridge Inspections from 10:30 am to 4:00 pm, weather permitting. The detour route for this closure will be the Lake Palourde Bypass Road (Duhon Boulevard), US 90 and LA 662.

The Department regrets the inconvenience caused to the traveling public.