I-12 (Eastbound Exit Ramp Improvement at US 190) St. Tammany Parish Lane Closure
Thursday, March 13, 2014 at 8:17:12 AM
There will be lane closures on the inside (left) lane of the Eastbound I-12 from the Tchefuncte River Bridge (Milepost 61) to US 190 Overpass (Milepost 63) on Monday, March 17, 2014 through Sunday, March 23, 2014 (weather permitting) while crews drive piles and place concrete in the median for the overhead truss footings. The contractor may work nightly between 8:00 p.m. and 5:00 a.m.

Permit/Detour Section
During construction, eastbound motorists may take LA 1077 North to US 190, then East on US 190 to I-12 Eastbound.

One lane of traffic will be open at all times. By law, oversize loads are not allowed to travel at night.

Safety Reminder
DOTD appreciates your patience and reminds you to please drive with caution and be on the lookout for work crews and their equipment.

Project Contact
Seth de Armas, P.E.
DOTD Project Engineer
Covington Construction Office
985-893-6367
Seth.Dearmas@la.gov
DOTD Website – www.dotd.la.gov
Statewide 511 Traffic Information – www.511la.org