BDTM.94 - Cast-in-Place Box Culvert Rating Research Reports Implementation
Friday, August 21, 2020 at 3:35:09 PM

Attention Consultant Community:

Please be advised that the following Bridge Design Technical Memorandum (BDTM) has been approved by the Bridge Design Engineer Administrator and published on the DOTD Bridge Design Section website for implementation at:

http://wwwsp.dotd.la.gov/Inside_LaDOTD/Divisions/Engineering/Bridge_Design/Pages/Technical-Memoranda.aspx

The BDTM index has been updated and posted as well.

BDTM.94 – Cast-in-Place Box Culvert Rating Research Reports Implementation
Summary:
This BDTM requires incorporation of three (3) reports when performing structural load rating of CIP Concrete Box Culverts in an effort to improve load ratings for these culverts.


This email notification is distributed to all DOTD in-house bridge designers, consultant firms on the DOTD solicitation list, and those copied on the BDTM.

If you are listed as the Principle-In-Charge for a consultant firm, please inform all your designers of this BDTM. Thank you.

Thanks,
Kelly M. Kemp, P.E.
Bridge and Structural Design Section
LA Dept. of Transportation and Development
Office: (225) 379-1809
Quick Dial (Internal): 3-1809

DOTD Consultant Ads Section 80

Please do not reply to this e-mail from MyDOTD. The originating e-mail account is not monitored by Consultant Contract Services (CCS). If you need assistance with the information in this email, please contact Kelly Kemp directly.