US 80 (Texas Street) Bridge over Red River in Shreveport/Bossier in Bossier and Caddo Parishes.
Monday, July 17, 2017 at 1:27:23 PM
US 80 (Texas Street) Bridge over Red River in Shreveport/Bossier in Bossier and Caddo Parishes.

This is to advise that on Monday, July 24, 2017 and Tuesday, July 25, 2017, beginning at 9:00 a.m. until 3:00 p.m., the US 80 (Texas Street) Bridge over the Red River, approximately 1.4 miles west of LA 3 will be reduced to one (1) lane of traffic in each direction for routine bridge inspection.

Alternate Route: This closure will allow vehicles 10 feet wide or smaller to pass through the bridge inspection zone. Larger vehicles must detour using LA 1, I-20 and LA 3.

Safety Reminder:

DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.

Call (318) 561-5100 or (800) 542-3509 or 511 or visit www.511LA.org for additional information. Motorists may also monitor the LA DOTD website @ www.dotd.la.gov, by selecting MYDOTD, the Way To Geaux Application for iphone or android devices or the DOTD Facebook page.

This work will be performed WEATHER PERMITTING.

Contact Information:
Erin Buchanan
Public Information Officer
District 04
Phone (318)549-8402