*UPDATE* WEST BATON ROUGE PARISH - INTRACOASTAL CANAL NORTHBOUND LA-1 CLOSURE
Monday, March 27, 2017 at 3:44:40 PM

PORT ALLEN CANAL/INTRACOASTAL LANE CLOSURE MARCH 28, 2017

*UPDATE* OUTSIDE LANE INSTEAD OF INSIDE LANE

Northbound LA 1 @ Intracoastal Canal (Port Allen) in West Baton Rouge OUTSIDE lane, will be closed across entire length of bridge on Tuesday, March 28, 2017 from 9:00 AM to 1:00 PM. DOTD inspectors will perform a routine inspection of the bridge at this time.

This closure will allow vehicles 11 feet wide or smaller to pass through the construction zone. Road is open for regular traffic but oversize vehicles must detour using I-10 East to LA 22 South to LA 70 West to LA 3089 West to LA 1 North.

DOTD appreciates your patience and reminds you to please drive with caution through the inspection site and be on the lookout for inspection crews and their equipment.

For more information contact Steven Howze.



Steven Howze

Bridge Inspection Supervisor

LADOTD Bridge Inspection

Office: 225-231-4128