WEST BATON ROUGE PARISH - SOUTHBOUND PORT ALLEN/INTRACOASTAL CANAL MARCH 27, 2017
Friday, March 03, 2017 at 12:55:07 PM

Port Allen Canal/Intracoastal 3/27/2017 9:00 AM to 1:00 PM Lane Closure

Southbound LA 1 Intracoastal Canal (Port Allen) in West Baton Rouge inside lane, will be closed across the entire length of bridge on Monday, March 27, 2017 from 9:00 AM to 1:00 PM. DOTD inspectors will perform a routine inspection on the bridge at this time.

This closure will allow vehicles 11 feet wide or smaller to pass through the construction zone. Road is open for regular traffic but oversize vehicles must detour using I-10 East to LA 22 South to LA 70 West to LA 3089 West to LA 1 North.

DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for inspection crews and their equipment.

For more information contact Steven Howze.



Steven Howze

Bridge Inspection Supervisor

LADOTD Bridge Inspection

Office: 225-231-4128