Parish |
Letting Date |
Project |
Route |
Project Name |
Type Improvement |
Estimated Cost Range |
Length (miles) |
Jackson |
2025-11-12 |
H.001553 068-02-0017 |
LA 146, LA 4 |
La 146 Bridges Near Kelleys |
Replace 5 Timber Bridges With 4 Slab Bridges & 1 Rcb Culvert |
$10,000,000 to $15,000,000 |
6.85 |
St. Landry |
2025-06-11 |
H.002176 219-07-0025 |
LA 10 |
La 10 Bridges |
New Bridges |
$10,000,000 to $15,000,000 |
0.71 |
Jefferson |
2025-12-10 |
H.002956 430-01-0020 |
LA 3139 |
Earhart At Dakin |
Ramp Connector (Eb Earhart - Dakin) |
$10,000,000 to $15,000,000 |
0.01 |
Jefferson |
2025-10-08 |
H.004359 826-44-0027 |
LA 3154 |
Hickory (La 48 - Mounes) |
Relocation and 4-laning |
$20,000,000 to $30,000,000 |
1.07 |
St. Tammany |
2025-12-10 |
H.004957 852-33-0002 |
LA 3241, LA 434 |
La 3241:i-12/La 434 Interchange to La 36 |
New 4-lane |
$100,000,000 to $125,000,000 |
6.38 |
Vernon |
2025-06-11 |
H.006338 713-58-0114 |
|
Holton Harris Road Bridge |
Bridge Replacement - No Realignment |
$1,000,000 to $2,500,000 |
0.12 |
Jefferson |
2025-11-12 |
H.007208 742-26-0073 |
LA 3017 |
Harvey Blvd Ext(Peters Rd-manhattan |
New Roadway Extension |
$10,000,000 to $15,000,000 |
1.45 |
Ouachita |
2025-11-12 |
H.007300 742-37-0028 |
LA 594, I-20 |
Kansas-garrett Conn. & I20 Improvements |
Rd Connector & Interchange Imprvmnt |
$30,000,000 to $50,000,000 |
2.16 |
Rapides |
2025-08-13 |
H.007538 744-40-0022 |
LA 498 |
La 498: England Air Park to La 1 Gateway |
Sidewalks and Landscaping |
$1,000,000 to $2,500,000 |
1.13 |
St. Tammany |
2025-04-09 |
H.007588 744-52-0039 |
|
Girod Street Landscaping and Lighting, P |
Landscaping and Lighting For Sidewalk |
$250,000 to $500,000 |
0.85 |
Tangipahoa |
2025-12-10 |
H.007598 744-53-0016 |
LA 16 |
Amite La 16 Pedestrian Project - Phase I |
New Sidewalks |
$500,000 to $1,000,000 |
0.53 |
Plaquemines |
2025-11-12 |
H.008220 836-14-0002 |
LA 406 |
La 406: Roundabout At Fe Hebert |
Construct Roundabout |
$2,500,000 to $5,000,000 |
0.36 |
Ouachita |
2025-04-09 |
H.008230 837-14-0009 |
LA 838 |
La 838: Steep Bayou Bridge Replacement |
New Bridge |
$2,500,000 to $5,000,000 |
0.29 |
Caddo |
2025-05-14 |
H.009052 |
I-20 |
I-20: Texas S/L to I-220 Pave Mkgs |
Plastic Pavement Striping and Raised Pavement Markers |
$500,000 to $1,000,000 |
12.45 |
Rapides |
2026-02-11 |
H.009194 |
I-49 |
I-49: Macarthur to Lena Rd Pave Mkgs |
Plastic Pavement Striping and Raised Pavement Markers |
$500,000 to $1,000,000 |
21.22 |
Jefferson |
2025-06-30 |
H.009884 |
|
Several Nogc Xings(Gretna) |
Rr Crossing Enhancement |
$250,000 to $500,000 |
0.01 |
Iberia |
2025-04-09 |
H.010155 |
US 90 |
Us 90 Railroad Overpass Se Of La 85 |
Bridge Overpass Over Railroad |
$50,000,000 to $70,000,000 |
1.07 |
East Baton Rouge |
2025-11-20 |
H.010251 |
LA 3164 |
Chippewa St Pump Station Imp Phase 2 |
Feasibility Study |
$1,000,000 to $2,500,000 |
0.43 |
East Baton Rouge |
2025-08-13 |
H.010253 |
|
Bluebonnet Blvd. Pump Stat. Imp |
Upgrade Pump Station and Add Advanced Warning System |
$1,000,000 to $2,500,000 |
0.01 |
Tangipahoa |
2025-10-08 |
H.010289 |
LA 22 |
La 22: Roundabout Dunson/Ridgdell Rds. |
Construct Roundabout At La 22/Dunson/Ridgedell |
$1,000,000 to $2,500,000 |
0.41 |
Orleans |
2025-12-10 |
H.010331 |
US 90 |
Us 90: Floodwall - Victory Rd |
Installation Of Drainage Structures |
$1,000,000 to $2,500,000 |
0.83 |
Natchitoches |
2025-10-08 |
H.010346 |
LA 487 |
La 487: La 120 - La 174 |
Patch, Cold Plane, and Overlay |
$2,500,000 to $5,000,000 |
9.99 |
Natchitoches |
2025-04-09 |
H.010359 |
LA 9 |
La 9: US 71 - La 156 |
Med Overlay |
$5,000,000 to $7,500,000 |
6.81 |
Natchitoches |
2026-01-14 |
H.010365 |
LA 117 |
La 117: 0.5 Mi S Of Bellwood to La 120 |
Med Overlay |
$7,500,000 to $10,000,000 |
9.59 |
St. John Baptist |
2025-08-13 |
H.010385 |
LA 3127 |
La 3127: St. James P/L - St. Charles P/L |
Patch, Mill, Overlay and Drainage Work |
$5,000,000 to $7,500,000 |
8.87 |
Terrebonne |
2025-04-09 |
H.010411 |
LA 24 |
La 24: Terrebonne P/L - Downtown Ct |
Patch, Mill & Overlay |
$7,500,000 to $10,000,000 |
9.10 |
St. Charles |
2025-10-08 |
H.010416 |
LA 3127 |
La 3127 Eb: 0.52 Mi W La 3141 - I-310 |
Mill and Overlay Of Asphalt Pavement and Related Work |
$7,500,000 to $10,000,000 |
7.74 |
Lincoln |
2025-06-11 |
H.010616 |
I-20, LA 544 |
I 20: La 544 Overpass Replacement |
Overpass Rehabilitation |
$30,000,000 to $50,000,000 |
1.50 |
Red River |
2025-06-11 |
H.011087 |
|
Westdale Plantation Road / Bayou Pierre |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.03 |
Orleans |
2026-03-11 |
H.011221 |
I-10 |
I-10: No Cbd3 Poydras - Chef Menteur |
Signing & Signing Structures Replacement & Upgrade In No Cbd |
$7,500,000 to $10,000,000 |
5.45 |
Rapides |
2025-04-09 |
H.011504 |
US 167, US 71 |
Alexandria ITS Phase 2 |
Installing Bridge Advisories, Cctvs, and Dmss |
$2,500,000 to $5,000,000 |
6.73 |
St. John Baptist |
2025-05-14 |
H.011515 |
LA 44 |
La 44: Palm St & Beech St Drainage |
Additional Pipe(S), Catch Basins, And/Or Asphalt |
$0 to $100,000 |
0.70 |
West Baton Rouge |
2025-12-10 |
H.011558 |
LA 990, LA 1 |
Acadian Trail (West Baton Rouge) |
Construct Acadian Trail |
$500,000 to $1,000,000 |
0.62 |
St. Bernard |
2025-12-10 |
H.011800 |
|
St. Bernard Miss River Trail Ph Iii |
Shared Use Path On Levee Top |
$1,000,000 to $2,500,000 |
0.00 |
Lincoln |
2025-12-10 |
H.011804 |
|
Ruston Downtown Revitalization Phase Ix |
Sidewalks and Streetscaping |
$1,000,000 to $2,500,000 |
0.00 |
Jefferson |
2025-12-10 |
H.011805 |
LA 541 |
Jefferson Wb Miss River Mu Path 3b & 3c |
Multi-use Path |
$500,000 to $1,000,000 |
0.23 |
Lafayette |
2025-12-10 |
H.011833 |
|
St. Mary Street Sidewalks |
Sidewalks |
$1,000,000 to $2,500,000 |
0.00 |
East Baton Rouge |
2025-12-10 |
H.011859 |
|
Br: River Road Multi-use Corridor |
Sidewalk, Street Scaping |
$250,000 to $500,000 |
0.25 |
Lafayette |
2025-10-08 |
H.011992 |
LA 343 |
La 343: Bayou Queue De Tortue Bridge |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.10 |
St. Landry |
2025-05-14 |
H.011993 |
LA 10 |
La 10: Bayou Carron Bridge |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.30 |
Vermilion |
2025-11-12 |
H.012001 |
LA 339 |
La 339: Canal & Creek Bridges |
Replacement Of 3 Timber Bridges With 3 Rcb Culverts |
$2,500,000 to $5,000,000 |
0.71 |
Webster |
2025-12-10 |
H.012030 |
US 371, LA 159, I-20 |
Us371: Kcs RR Overpasses Hbi |
Bridge Replacements/Rehabilitation |
$20,000,000 to $30,000,000 |
1.48 |
Calcasieu |
2025-09-10 |
H.012052 |
LA 3092 |
La3092: Gauthier Rd @ Lake St Roundabout |
Construct Roundabout |
$2,500,000 to $5,000,000 |
0.47 |
St. James, St. John Baptist |
2026-01-14 |
H.012066 |
LA 3213 |
La 3213: Gramercy Bridge Rehabilitation |
Major Bridge Rehabilitation |
$50,000,000 to $70,000,000 |
1.48 |
Washington |
2025-12-10 |
H.012072 |
LA 60 |
La 60: Drain Bridge |
Bridge Removal - Replaced With Drainage Structure |
$500,000 to $1,000,000 |
0.15 |
Calcasieu |
2025-06-11 |
H.012083 |
I-10, LA 378 |
I-10: Calcasieu River Br Int Rprs (Hbi) |
Bridge Interim Repairs |
$5,000,000 to $7,500,000 |
2.60 |
St. Martin |
2025-05-14 |
H.012130 |
LA 347 |
La 347: Will Angelle Road- La 686 |
Mill, Patch, Overlay, & Related Work |
$5,000,000 to $7,500,000 |
5.69 |
Washington |
2025-12-10 |
H.012159 |
LA 430 |
La 430: La 25 - La 1069 Drainage |
Remove and Replace Pipes, Catch Basins, And/Or Asphalt |
$100,000 to $250,000 |
0.18 |
Orleans |
2025-08-13 |
H.012370 |
|
Morrison Rd: Mayo Ave - ¦bullard Ave |
Preservation Asphalt Overlay and Related Ada Curb Work |
$20,000,000 to $30,000,000 |
3.38 |
West Baton Rouge |
2025-06-11 |
H.012587 |
I-10 |
I-10: W End Of Br 290 - W End Of La 415 |
Grade Raising |
$20,000,000 to $30,000,000 |
4.43 |
Calcasieu |
2025-08-13 |
H.012603 |
LA 27 |
Ellender Br Bearing and Span Lock Rehab. |
Movable Bridge Machinery Repairs |
$100,000 to $250,000 |
0.55 |
St. Martin |
2025-11-12 |
H.012618 |
LA 347 |
La 347 Drainage Improvements |
Raise Road X-section And/Or Replace Subdrainage Structures |
$500,000 to $1,000,000 |
2.03 |
Calcasieu |
2026-03-11 |
H.012685 |
LA 385, LA 3186 |
La 385: Ryan Street Intersection Imprs |
Systemic Signal Improvement, Striping Enhancement, Sidewalks |
$5,000,000 to $7,500,000 |
2.64 |
Lincoln, Union |
2025-10-08 |
H.012711 |
LA 151 |
La 151: La 145 - La 33 |
Base Stabilization and Overlay |
$2,500,000 to $5,000,000 |
5.14 |
Iberia |
2025-11-12 |
H.012792 |
LA 675, US 90 |
La 675 @ Airport Rd Roundabout |
Roundabout |
$5,000,000 to $7,500,000 |
0.69 |
Catahoula |
2026-03-11 |
H.012842 |
LA 124-P, LA 124 |
La124 Extension Near Larto (Seg 2&3) |
New Roadway Construction/Re-construction, Bridge Replacement |
$15,000,000 to $20,000,000 |
4.33 |
Webster |
2025-08-20 |
H.012873 |
|
Old US 80: Las RR Xing (Webster) |
Remove Crossing and ITS Road Approaches |
$0 to $100,000 |
0.02 |
Lafayette |
2025-08-13 |
H.012914 |
LA 3073 |
La 3073: Ambassador @ Verot-chemin-bonin |
Extending Turn Lanes |
$2,500,000 to $5,000,000 |
1.35 |
DeSoto |
2025-11-12 |
H.012939 |
LA 3015 |
La 3015: US 171 to La 175 |
Asphaltic Concrete Pavement Resurfacing |
$1,000,000 to $2,500,000 |
6.82 |
Terrebonne |
2025-10-08 |
H.012949 |
LA 315 |
Dularge Br Lock Bar Rehabilitation |
Movable Bridge Machinery Repairs |
$100,000 to $250,000 |
0.43 |
Terrebonne |
2025-12-10 |
H.012957 |
LA 24 |
La 24: Presque Isle Br Elec Rehab |
Electrical Rehab |
$250,000 to $500,000 |
0.02 |
Claiborne |
2026-01-14 |
H.012986 |
LA 534 |
La 534: La 534 Spur - Log Mile 5.33 |
Asphaltic Concrete Pavement Resurfacing |
$500,000 to $1,000,000 |
2.89 |
Vernon |
2025-12-10 |
H.013098 |
|
Jim Cryer Lane Over Bayou Anacoco |
Bridge Replacement; No New Alignment |
$1,000,000 to $2,500,000 |
0.03 |
Ouachita |
2025-09-10 |
H.013122 |
|
Pine St. & Harrison/Collier Bridges |
Bridge Replacement - No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Ouachita |
2025-05-14 |
H.013130 |
|
Red Cut Rd & Charles Rawls Rd Bridges |
Bridge Replacement - No New Alignment |
$2,500,000 to $5,000,000 |
0.03 |
Ouachita |
2025-11-12 |
H.013137 |
|
Harmon Johnson Rd & Good Hope Rd Brs |
Bridge Replacement - No New Alignment |
$500,000 to $1,000,000 |
0.02 |
Iberia |
2026-03-11 |
H.013140 |
|
Eighty Arpent Road Over Unnamed Coulee |
Bridge Replacement - No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Terrebonne |
2025-08-13 |
H.013199 |
|
Country Estates Dr Over St. Louis Bayou |
Bridge Replacement - No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Caldwell |
2025-07-09 |
H.013202 |
US 165 |
Us 165: La 4 - Union Pacific Overpass |
Mill & Overlay |
$7,500,000 to $10,000,000 |
7.02 |
Terrebonne |
2025-06-11 |
H.013319 |
|
Williams Ave Shared Use Path (Houma) |
Shared Use Path |
$250,000 to $500,000 |
0.59 |
Terrebonne |
2025-09-10 |
H.013340 |
|
Valhi Blvd, Multi-use Trail, Phase 1 |
Multi-use Path |
$500,000 to $1,000,000 |
1.90 |
Lafourche |
2025-12-10 |
H.013388 |
|
Dist. 02h Flashing Yellow Arrow Part 1 |
Traffic Signal Upgrade |
$1,000,000 to $2,500,000 |
0.00 |
Terrebonne |
2026-03-11 |
H.013421 |
|
Dist. 02h Flashing Yellow Arrow Part 2 |
Traffic Signal Upgrade |
$2,500,000 to $5,000,000 |
0.00 |
Terrebonne |
2025-08-13 |
H.013714 |
|
Valhi Blvd Shared-use Path (Houma) |
Shared Use Path |
$1,000,000 to $2,500,000 |
0.79 |
Iberville |
2025-11-12 |
H.013715 |
LA 77, LA 1 |
La 77: Up RR Xing (Iberville) |
Road Work & Upgrade Warning |
$500,000 to $1,000,000 |
0.18 |
Orleans |
2025-09-10 |
H.013719 |
US 61 |
Us 61 @ I-10 Eb Off Ramp Ped Impr (No) |
Ped Improvements: Sidewalks, Signals, Striping |
$500,000 to $1,000,000 |
0.35 |
St. Mary |
2025-09-10 |
H.013722 |
|
Morgan City Sidewalks: Downtown & Myrtle |
Sidewalks, Ramps, Ped Signals |
$1,000,000 to $2,500,000 |
1.14 |
St. Landry |
2025-10-08 |
H.013811 |
LA 104 |
La 104: 2.6 Mi Nw US 190 - US 190 |
Mill, Base Stabilization, and Overlay |
$5,000,000 to $7,500,000 |
2.58 |
Natchitoches |
2025-09-10 |
H.013821 |
LA 6 |
La 6: Youngs Bayou Bridges |
Bridge Repair |
$2,500,000 to $5,000,000 |
0.25 |
Jefferson |
2025-06-30 |
H.013825 |
|
Nopb RR Xings (Jefferson Parish) |
Install RR Active Warning |
$250,000 to $500,000 |
0.02 |
Iberville, West Baton Rouge |
2026-03-11 |
H.013862 |
I-10 |
I-10: Ramuh - W End Of Br 290 Pave Mkgs |
Pavement Marking Replacement |
$500,000 to $1,000,000 |
11.19 |
East Baton Rouge |
2025-08-20 |
H.013864 |
US 61 |
Us 61: Ic RR Xing (Baton Rouge) |
Upgrade RR Crossing's Signal |
$500,000 to $1,000,000 |
0.01 |
Caldwell, Catahoula, LaSalle |
2025-08-13 |
H.013918 |
LA 124, LA 126 |
La 126: La 124 - La 849 S. |
Patch, Mill, and Overlay |
$5,000,000 to $7,500,000 |
11.32 |
Iberville |
2025-04-09 |
H.013968 |
LA 404 |
La 404: Bayou and Canal Bridges |
Bridge Replacement |
$10,000,000 to $15,000,000 |
0.55 |
Orleans |
2025-05-14 |
H.014064 |
I-10 |
I-10: Franklin Ave - I-510 |
Mill, Overlay, Guardrail, Striping, and Related Work |
$10,000,000 to $15,000,000 |
8.71 |
Orleans |
2025-12-10 |
H.014065 |
I-610 |
I-610: Orleans P/L - Franklin Ave |
Milling and Overlay With Asphalt Concrete |
$7,500,000 to $10,000,000 |
4.88 |
Caddo |
2025-04-09 |
H.014082 |
US 171 |
Us 171: La 3132 to US 80 |
Mill, Patch, and Overlay |
$7,500,000 to $10,000,000 |
4.61 |
St. James |
2025-05-14 |
H.014086 |
US 61 |
Us 61: St. John Pl - Ascension Pl |
Mill & Overlay and Add Left Turn Lane At La 641 |
$10,000,000 to $15,000,000 |
8.83 |
St. John Baptist |
2025-05-14 |
H.014109 |
US 61 |
Us 61: Wildcat Dr - Airport Rd |
Medium Overlay |
$5,000,000 to $7,500,000 |
2.93 |
Tangipahoa |
2025-09-10 |
H.014112 |
LA 16 |
La 16: E. Of Duncan Ave to La 445 |
Mill, In-place Base Rehab. and Overlay |
$15,000,000 to $20,000,000 |
9.04 |
St. Helena |
2025-04-09 |
H.014115 |
LA 448 |
La 448: La 37 - La 10 |
Mill & Overlay |
$2,500,000 to $5,000,000 |
8.59 |
St. Helena |
2025-08-13 |
H.014141 |
LA 43 |
La 43: Drainage Improvements |
Addition Of Cross Drain and Upsizing Culverts |
$100,000 to $250,000 |
0.36 |
East Baton Rouge |
2025-10-08 |
H.014171 |
LA 30 |
La 30(Nicholson Dr) Clearing & Grubbing |
Clearing and Grubbing |
$100,000 to $250,000 |
1.20 |
Bossier |
2025-09-10 |
H.014217 |
LA 537 |
La 537: Bridges Near Plain Dealing |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.50 |
Bienville, Lincoln |
2026-01-14 |
H.014219 |
LA 507 |
La 507: Creek Bridges Near Simsboro |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.48 |
Vermilion |
2025-10-08 |
H.014223 |
|
Camile Road Over Bayou Grand Marais |
Bridge Replacement No New Alignament |
$1,000,000 to $2,500,000 |
0.00 |
St. Martin |
2025-10-08 |
H.014226 |
|
Auguillard Road Over Coulee |
Bridge Replacement No New Alignment |
$250,000 to $500,000 |
0.00 |
Caddo |
2025-05-14 |
H.014229 |
|
Crawford Road Over Tiger Branch |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Ouachita |
2025-08-13 |
H.014232 |
|
Ruffin Drive Over Drain to Youngs Bayou |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Jefferson Davis |
2026-01-14 |
H.014235 |
|
West Racca Rd Over E Grand Marais Ditch |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.02 |
West Carroll |
2025-12-10 |
H.014239 |
LA 589 |
La 589: Alligator Bayou Bridge |
Bridge Replacement |
$500,000 to $1,000,000 |
0.01 |
Winn |
2025-11-12 |
H.014242 |
LA 124 |
La 124: Bridges Near Winnfield |
Bridge Replacement |
$5,000,000 to $7,500,000 |
7.06 |
Rapides |
2026-03-11 |
H.014246 |
LA 1199 |
La 1199: Spring Creek & Creek Bridges |
Bridge Replacement |
$1,000,000 to $2,500,000 |
2.27 |
Tangipahoa |
2025-11-12 |
H.014252 |
LA 1054 |
La 1054: Tyner Creek Bridge |
Bridge Replacement |
$250,000 to $500,000 |
0.01 |
West Feliciana |
2025-11-12 |
H.014253 |
LA 421 |
La 421: Thom Creek Bridge |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.13 |
East Feliciana |
2025-12-10 |
H.014254 |
LA 955 |
La 955: Bridges Near Clinton |
Bridge Replacement |
$2,500,000 to $5,000,000 |
3.92 |
Tangipahoa |
2026-03-11 |
H.014265 |
|
North River Road Over Irving Branch |
Bridge Replacement, No New Alignment |
$500,000 to $1,000,000 |
0.02 |
Terrebonne |
2026-02-11 |
H.014267 |
|
Savanne Road Over Hanson Canal |
Bridge Replacement, No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Lafourche |
2025-09-10 |
H.014270 |
|
Lefort Bypass Road Over Cut Off Bayou |
Bridge Replacement, No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Avoyelles |
2025-09-10 |
H.014273 |
|
Monroe Fabre Over Bayou Des Glaises |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.02 |
St. Martin |
2025-06-11 |
H.014276 |
LA 975 |
La 975: Creek Bridges |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.71 |
East Baton Rouge |
2025-12-10 |
H.014318 |
|
Gurney Road Bridges |
Bridge Replacment No New Alignement |
$1,000,000 to $2,500,000 |
0.71 |
East Baton Rouge |
2025-10-08 |
H.014322 |
|
Centurion Ave Over Drainage Bayou |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Lafayette |
2026-01-14 |
H.014337 |
|
Acadian Hills Lane Over Drainage Canal |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Caddo |
2025-09-10 |
H.014411 |
|
Linwood Avenue Reconstruction-phase Iv |
Roadway Reconstruction - Joint and Panel Repair |
$10,000,000 to $15,000,000 |
1.00 |
Vermilion |
2025-11-12 |
H.014465 |
LA 82 |
La 82: Vermilion River Mb Rh(Perry)(Hbi) |
Movable Bridge Rehabilitation |
$15,000,000 to $20,000,000 |
0.30 |
Lafayette |
2025-12-10 |
H.014470 |
|
E. Pine Street Sidewalks |
Sidewalk Construction |
$250,000 to $500,000 |
0.21 |
Lafayette |
2025-12-10 |
H.014483 |
US 90 |
Us 90: Scott C/L ? (Former) La 182 |
Patch, Mill, and Overlay |
$2,500,000 to $5,000,000 |
2.19 |
Lafourche |
2025-12-10 |
H.014523 |
LA 20 |
La 20: St. Patrick St- La 304 |
Install 6' Shoulder and Subsurface Drainage |
$1,000,000 to $2,500,000 |
3.10 |
DeSoto |
2025-06-30 |
H.014574 |
US 171 |
Us 171: Kcs RR Xing (Mansfield) |
Replace Crossing Surface |
$100,000 to $250,000 |
0.01 |
Lafourche |
2025-12-10 |
H.014629 |
|
Lafourche Parish Signing and Striping |
Roadway Striping, Signage and Related Work |
$1,000,000 to $2,500,000 |
25.02 |
East Baton Rouge |
2025-06-30 |
H.014632 |
LA 3164 |
La 3164: Ic RR Xing (Baton Rouge) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
St. Landry |
2025-11-12 |
H.014633 |
LA 29 |
La 29: Bayou Cocodrie Bridges Scour Re |
Abutment Scour Mitigation |
$1,000,000 to $2,500,000 |
0.10 |
Ascension |
2025-06-30 |
H.014634 |
LA 22 |
La 22: Ic RR Xing (Ascension) |
Replace Railroad Crossing Surface |
$0 to $100,000 |
0.01 |
Beauregard |
2025-06-30 |
H.014636 |
LA 3226 |
La 3226: Kcs RR Xing (Beauregard) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
St. Mary |
2025-09-10 |
H.014640 |
|
Local Road Signing & Striping (St. Mary) |
Signing, Striping, and Pavement Markers |
$1,000,000 to $2,500,000 |
26.56 |
St. Bernard |
2026-01-14 |
H.014643 |
LA 39 |
La 39: W. Judge Perez Dr. Enhancements |
Multi-use Path and New Bike/Ped Facilities |
$500,000 to $1,000,000 |
1.07 |
Lafayette |
2025-04-15 |
H.014659 |
|
Broussard Main Street Trail |
Construction Of 4,400' Ped-bike Trail |
$100,000 to $250,000 |
0.86 |
East Baton Rouge |
2026-01-14 |
H.014675 |
US 61-X |
Us 61-x: N. 22nd St. - US 61 |
Patch, Mill, Overlay, Sidewalk and Bike Paths, and Drainage |
$30,000,000 to $50,000,000 |
3.97 |
St. Tammany |
2025-06-11 |
H.014737 |
|
Signal Upgrade:sgt Alfred Dr @ Cleveland |
Replace Traffic Signal, Upgrade Sidewalks and Striping |
$250,000 to $500,000 |
0.01 |
Caddo |
2026-03-11 |
H.014768 |
I-20 |
I-20: Decel Lane Ext Ex 13 |
Deceleration Lane Extension |
$1,000,000 to $2,500,000 |
0.76 |
Lafourche |
2025-07-09 |
H.014769 |
LA 3161 |
La 3161: Hwy 3235 - W Main St |
Mill and Overlay Of Asphalt Pavement |
$500,000 to $1,000,000 |
0.71 |
Jefferson |
2025-06-11 |
H.014776 |
LA 45 |
La 45: Marie Ct. to 2nd St |
Patch, Mill, Overlay, and Raising Roadway Grade |
$2,500,000 to $5,000,000 |
4.17 |
Calcasieu |
2025-07-09 |
H.014782 |
LA 27 |
La 27: La 397 - La 14 |
Microsurfacing |
$500,000 to $1,000,000 |
3.94 |
LaSalle |
2025-08-13 |
H.014794 |
LA 778, LA 3104 |
La 3104 & La 778 Asphalt Overlays |
Patch & Overlay |
$1,000,000 to $2,500,000 |
4.18 |
Richland |
2026-02-11 |
H.014799 |
LA 583 |
La 583: Sumlin Ranch Rd - La 134 |
Asphalt Surface Treatment, Patch, Mill and Overlay |
$2,500,000 to $5,000,000 |
10.47 |
Beauregard |
2025-07-09 |
H.014800 |
LA 27 |
La 27: White Acres Rd - La 110 |
Microsurfacing |
$500,000 to $1,000,000 |
4.05 |
Lafourche, Terrebonne |
2025-06-11 |
H.014802 |
LA 24, LA 316 |
La316&la24:mill,Ovrly,Grade Raising,Hfst |
Patch, Mill and Overlay, Hfst, Shld Widening, Grade Raising |
$10,000,000 to $15,000,000 |
7.74 |
St. Helena |
2026-01-14 |
H.014803 |
LA 16 |
La 16: La 63 to La 449 |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
4.25 |
Jefferson Davis |
2025-11-12 |
H.014807 |
LA 26 |
La 26: W Racca Rd - Trailor Town Rd |
Patch, Mill & Overlay |
$2,500,000 to $5,000,000 |
7.29 |
Lincoln |
2025-09-10 |
H.014813 |
LA 150 |
La 150: US 80 - La 149 |
Patch, Mill & Overlay |
$1,000,000 to $2,500,000 |
3.75 |
Lafayette |
2026-03-11 |
H.014842 |
LA 3184 |
La 3184: La 3025 - I-10 |
Concrete Pavement Rehab, Asphalt Shoulders & Related Work |
$2,500,000 to $5,000,000 |
2.28 |
Natchitoches |
2025-10-08 |
H.014864 |
LA 486 |
La 486: La 480 - US 71 North |
Base and Overlay |
$250,000 to $500,000 |
0.91 |
Union |
2026-01-14 |
H.014872 |
LA 348, LA 3281 |
La 348 and La 3281: Repairs |
Mill, Base Rehab & Overlay |
$2,500,000 to $5,000,000 |
4.35 |
Franklin |
2025-04-09 |
H.014881 |
US 425 |
Us 425: Winnsboro - Baskin |
Mill & Overlay |
$2,500,000 to $5,000,000 |
3.88 |
Beauregard |
2026-01-14 |
H.014889 |
US 171 |
Us 171: West Dr - Vernon P/L |
Thin Overlay |
$1,000,000 to $2,500,000 |
2.06 |
Rapides |
2026-01-14 |
H.014891 |
LA 1207 |
La 1207: La 115 to La 28 |
Patch, Mill, and Overlay |
$5,000,000 to $7,500,000 |
4.65 |
East Baton Rouge |
2025-06-30 |
H.014897 |
|
Thomas & Leisure Rd: Ic RR Xings (Ebr) |
Install Upgraded RR Signs |
$0 to $100,000 |
0.10 |
Jefferson |
2025-12-10 |
H.014937 |
|
Soniat Greenway |
Multi-use Path |
$1,000,000 to $2,500,000 |
0.00 |
Jefferson |
2025-12-10 |
H.014939 |
|
Brown Avenue Multi-use Path |
Multi-use Path |
$500,000 to $1,000,000 |
0.42 |
West Baton Rouge |
2025-12-10 |
H.014944 |
LA 76, LA 415 |
La415 to La1 Corridor Multi-use Path |
Construction Of Bike/Ped Facilities |
$1,000,000 to $2,500,000 |
2.91 |
Calcasieu |
2025-10-08 |
H.014964 |
LA 27 |
La 27: 0.12 Mi S Richardson Rd - La 12 |
Road Diet |
$250,000 to $500,000 |
1.01 |
Acadia |
2025-09-10 |
H.014979 |
|
Airport Road Over Unnamed Canal |
Bridge Replacement No New Alignment |
$250,000 to $500,000 |
0.00 |
Acadia |
2025-09-10 |
H.014980 |
|
Chinaberry Drive Over Unnamed Coulee |
Bridge Replacement No New Alignment |
$250,000 to $500,000 |
0.00 |
Rapides |
2025-10-08 |
H.014984 |
|
Libuse Cutoff Rd Over Flagon Bayou |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.04 |
Jefferson |
2026-02-11 |
H.015004 |
LA 3139 |
La 3139: Eb Ramp Ov La 3152 Nb Repair |
Repair Of Pretressed Concrete Girders |
$500,000 to $1,000,000 |
0.17 |
Washington |
2025-05-01 |
H.015061 |
LA 1073, LA 1070 |
La 1070 & La 1073: Washington Parish Rt |
Provide $1,966,681 In Funds to Washington Parish |
$1,000,000 to $2,500,000 |
4.50 |
Natchitoches |
2025-06-30 |
H.015071 |
LA 6 |
La 6: Kcs RR Xing (Clarence) |
Replace Railroad Crossing Surface |
$250,000 to $500,000 |
0.01 |
Evangeline, St. Landry |
2025-11-12 |
H.015096 |
LA 29 |
La 29: La 13 - La 758 |
Patch, Mill & Overlay |
$7,500,000 to $10,000,000 |
5.41 |
Livingston |
2025-10-08 |
H.015102 |
|
Centerville St Nw Improvements |
Mill and Overlay Centerville St Nw and Add Bike Lanes |
$1,000,000 to $2,500,000 |
0.27 |
St. Tammany, Tangipahoa |
2025-05-14 |
H.015109 |
LA 1090, LA 21, LA 1091, US 11, LA 59, LA 3234, LA 22, US 51-X, US 51, US 190 |
Access Mgmt Impr Tangipahoa/St Tammany |
Intersection Improvements |
$500,000 to $1,000,000 |
1.10 |
Terrebonne |
2025-09-10 |
H.015115 |
LA 24 |
La 24: La 24 Over Icww Repair |
Repair Of Steel Plate Girder |
$1,000,000 to $2,500,000 |
0.73 |
Jefferson |
2025-05-14 |
H.015120 |
|
Roosevelt Blvd: W Napoleon - W Metairie |
Reconstruct Pavement and Base Of Roosevelt Blvd |
$7,500,000 to $10,000,000 |
1.10 |
St. Tammany |
2025-12-10 |
H.015129 |
|
Bootlegger Rd-ochsner Blvd Sidewalks |
Sidewalk Construction |
$1,000,000 to $2,500,000 |
1.44 |
Webster |
2026-03-20 |
H.015132 |
LA 164 |
La 164: Each Kcs Spur Xings (Doyline) |
Upgrade RR Signals |
$500,000 to $1,000,000 |
0.04 |
East Baton Rouge |
2025-06-30 |
H.015145 |
|
Kcs Several RR Xings (Scotlandville) |
Rr Signal Upgrades and Closure |
$1,000,000 to $2,500,000 |
0.05 |
Ouachita |
2025-12-10 |
H.015205 |
|
Mcmillan Rd Ped Impr (W Mon) |
Sidewalk, Curb Ramps, Signage and Related Work |
$500,000 to $1,000,000 |
0.49 |
St. Landry |
2025-11-12 |
H.015218 |
I-49 |
Grand Prairie Safety Rest Area Lighting |
Replacement Of Existing Rest Area and Parking Area Lighting |
$500,000 to $1,000,000 |
0.62 |
St. John Baptist |
2025-06-01 |
H.015238 |
|
Garyville Ped-bike-transit Trailhead |
Construction Of a Ped/Bike/Transit Trailhead |
$100,000 to $250,000 |
0.00 |
West Feliciana |
2025-07-01 |
H.015240 |
|
West Feliciana Hospital Trail |
Construction Of 4,325 Lf Of Pedestrian Trail |
$250,000 to $500,000 |
0.00 |
Webster |
2025-09-10 |
H.015243 |
I-20 |
I-20 Frontage Road: Goodwill Road |
Relocate and Transfer Frontage Road |
$2,500,000 to $5,000,000 |
0.86 |
Ouachita |
2025-06-11 |
H.015246 |
LA 840-6 |
La 840-6: Hudson Ln - Bayou Desiard |
Patch, Clean, Reseal Joints and Cracks In Jcp |
$2,500,000 to $5,000,000 |
2.63 |
Ouachita |
2026-03-11 |
H.015247 |
LA 840-6, US 165-Y |
Us 165-business & La 840-6: Repairs |
Patch, Mill and Overlay Asphalt Pavement and Patch Jcp |
$1,000,000 to $2,500,000 |
1.46 |
Ouachita |
2025-11-12 |
H.015248 |
LA 15, US 165-Y |
La 15 & US 165-business: Repairs |
Patch, Mill and Overlay Asphalt Pavement and Patch Jcp |
$2,500,000 to $5,000,000 |
5.68 |
Pointe Coupee |
2025-09-10 |
H.015263 |
LA 10 |
La 10 Roadway Flooding: 0.2 Mi W Of La 1 |
Raise Roadway Elevation to Prevent Flooding |
$1,000,000 to $2,500,000 |
0.17 |
Ouachita |
2025-08-13 |
H.015265 |
US 165 |
Us 165: Int. Imp. Near Teakwood Dr |
Add Turn Lane, Restrict Crossover |
$500,000 to $1,000,000 |
0.29 |
Rapides |
2025-10-08 |
H.015272 |
US 165 |
Us 165: Intersection Improvements |
Add and Improve Turn Lanes |
$500,000 to $1,000,000 |
0.35 |
Iberia |
2025-05-14 |
H.015273 |
US 90 |
Us 90: La 88 - La 14 |
Patch, Mill, Roadway Reinforcing Mesh, Overlay, & Guardrail |
$15,000,000 to $20,000,000 |
6.64 |
St. Tammany |
2026-01-14 |
H.015283 |
LA 21 |
La 21: Fairgrounds Blvd - La 41 |
Asphalt Overlay |
$2,500,000 to $5,000,000 |
4.45 |
Jefferson Davis |
2025-04-09 |
H.015288 |
LA 1130 |
La 1130: US 190 - La 26 |
Asphalt Patching, Milling, 3.5? Overlay, and Drainage |
$1,000,000 to $2,500,000 |
1.48 |
Rapides |
2025-06-11 |
H.015292 |
LA 1200 |
La 1200: La 121 - La 1 |
Asphalt Overlay |
$1,000,000 to $2,500,000 |
4.20 |
Pointe Coupee |
2025-06-11 |
H.015294 |
LA 418 |
La 418: Innis (La 1) - La 15 |
Mill, Base Rehab & Overlay |
$10,000,000 to $15,000,000 |
9.04 |
Claiborne |
2026-01-14 |
H.015302 |
LA 540 |
La 540: La 2 - La 534 |
Chip Seal |
$500,000 to $1,000,000 |
6.46 |
Lafayette |
2026-01-14 |
H.015308 |
I-49 |
I-49: I-10 - St. Landry P/L |
Patch, Mill, Overlay |
$20,000,000 to $30,000,000 |
8.50 |
West Carroll |
2025-04-09 |
H.015320 |
LA 134 |
La 134: La 17 - Alligator Bayou Bridge |
Thin Lift Overlay With Limited Full Depth Patching |
$1,000,000 to $2,500,000 |
3.09 |
Lincoln |
2025-07-09 |
H.015324 |
LA 821 |
La 821: La 820 - La 145 |
Patch and 2 Lift Overlay |
$2,500,000 to $5,000,000 |
3.69 |
Sabine |
2025-08-13 |
H.015328 |
LA 120 |
La 120: US 171 - Angela Lane |
In Place Stabilization and Overlay |
$1,000,000 to $2,500,000 |
1.82 |
Tangipahoa |
2025-12-10 |
H.015333 |
|
Easley Road Over Sweetwater Creek |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.02 |
Calcasieu |
2025-05-14 |
H.015353 |
I-210 |
I-210: Eb Ryan St Exit Modifications |
Ramp Modifications, Fog Seal, Ada Improvements |
$250,000 to $500,000 |
0.54 |
Bossier |
2025-08-20 |
H.015389 |
LA 157 |
La 157: Las Xing (Bossier) |
Upgrade RR Signals to Cants |
$0 to $100,000 |
0.01 |
Tangipahoa |
2026-01-14 |
H.015404 |
|
E Lewiston Road Over Wilson Branch |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.03 |
Tangipahoa |
2025-12-10 |
H.015407 |
|
Old Genessee Road Bridges |
Bridge Replacement |
$1,000,000 to $2,500,000 |
1.63 |
Statewide |
2025-12-10 |
H.015425 |
|
New Ferry Boat - Plaquemines |
New Ferryboat Construction |
$20,000,000 to $30,000,000 |
0.00 |
East Baton Rouge |
2025-04-09 |
H.015439 |
LA 3034 |
La 3034: Sullivan Rd - La 37 |
Milling, Stabilize, Asphalt Overlay, Drainage Works |
$2,500,000 to $5,000,000 |
2.59 |
Rapides |
2026-03-11 |
H.015448 |
|
Philadelphia Road Over Haines Creek |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
Morehouse |
2026-03-11 |
H.015457 |
|
Olen Hughes Over Bayou Bonne Idee |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
Richland |
2026-03-11 |
H.015460 |
|
Little Road Over Creek |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.00 |
Bossier |
2025-06-30 |
H.015474 |
LA 72 |
La 72: Kcs RR Xing (Bossier City) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
Allen |
2025-12-10 |
H.015489 |
|
Arkadelphia Road Bridges |
Bridge Replacement |
$7,500,000 to $10,000,000 |
0.03 |
Calcasieu |
2025-12-10 |
H.015491 |
|
Bankens Road Over Bayou Arceneaux |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
Cameron |
2026-03-11 |
H.015493 |
|
Muria Road Over Little Chenier Bayou |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
Jefferson Davis |
2026-03-11 |
H.015494 |
|
Lyons Road Over E. Grand Marais Ditch |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.02 |
St. Landry |
2025-12-10 |
H.015505 |
|
Solid Waste Road Over Bayou Boeuf |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.01 |
St. Martin |
2025-12-10 |
H.015509 |
|
Huval Street Over True Canal |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
Lafayette |
2025-11-12 |
H.015511 |
|
E. Martial Ave. Over Coulee |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
Iberia |
2025-12-10 |
H.015512 |
|
Mullins Road Over Tete Bayou |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
Acadia |
2026-02-11 |
H.015513 |
|
Elenor Road Over Bayou Blanc |
Bridge Design |
$1,000,000 to $2,500,000 |
0.01 |
Evangeline |
2025-11-12 |
H.015516 |
|
Beiber Road Over Nezpique Bayou |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.02 |
East Baton Rouge |
2025-12-10 |
H.015526 |
LA 3164 |
Chippewa St Pump Station Imp Phase 1 |
Lights, Gates and Signage to Warn Travelers Of High Water |
$250,000 to $500,000 |
0.42 |
Ascension |
2025-12-10 |
H.015530 |
|
Devall Road Over Drainage Ditch |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
East Feliciana |
2026-03-11 |
H.015535 |
|
Billy Goat Road Over Palmers Branch |
Bridge Replacement |
$500,000 to $1,000,000 |
0.01 |
West Baton Rouge |
2026-03-11 |
H.015540 |
|
Section Road Over Bayou Poydras |
Bridge Replacement |
$500,000 to $1,000,000 |
0.00 |
Avoyelles |
2025-10-08 |
H.015543 |
LA 452 |
La 452: Drainage At Caldwell St. |
Drainage Improvements |
$500,000 to $1,000,000 |
0.13 |
East Baton Rouge |
2025-06-11 |
H.015547 |
|
Alphonse Forbes Road Over Drainage Bayou |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
East Baton Rouge |
2025-06-11 |
H.015548 |
|
E Flanacher Road Over Drainage Bayou |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
East Baton Rouge |
2025-10-08 |
H.015549 |
|
Chaney Rd and Milldale Rd Bridges |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.03 |
St. James |
2026-02-11 |
H.015603 |
LA 641 |
La 641: La 641 Over I-10 Bridge Repair |
Repair Of Bridge Damage Due to Over Height Truck |
$500,000 to $1,000,000 |
0.43 |
Iberville |
2025-07-09 |
H.015636 |
I-10 |
I-10: Trinity Drainage Canal Br Repair |
Bridge Repair Due to Vehicle Impact |
$250,000 to $500,000 |
0.40 |
Lafayette |
2025-12-31 |
H.015642 |
|
Bike Lafayette Connection |
Const. Of 1175 Foot Concrete Path In Moncus Park |
$100,000 to $250,000 |
0.00 |
Grant |
2025-12-31 |
H.015647 |
|
Dry Prong Community Trail |
Construction Of 5,600' Of Concrete Multi-use Trail |
$500,000 to $1,000,000 |
0.00 |
Livingston, St. Tammany, Tangipahoa |
2025-04-09 |
H.015691 |
LA 1077, LA 40, LA 16 |
Dist 62: Wet Reflective Pave Mark Eval |
Pavement Striping and Raised Pavement Markers |
$250,000 to $500,000 |
9.74 |
East Baton Rouge |
2025-09-10 |
H.015714 |
I-110 |
I-110: Nb @ Convention St Fire Damage Rp |
Repair Of Bridge Defects Suffered From Fire Damage |
$500,000 to $1,000,000 |
0.10 |
Rapides |
2025-05-14 |
H.015763 |
US 165 |
Us 165: 260' N Of Lowes Dr - Frontage Rd |
Pcc Patching, Patching, Milling, Overlay |
$2,500,000 to $5,000,000 |
0.28 |
West Baton Rouge |
2025-06-11 |
H.015767 |
LA 1 |
La 1: Intracoastal Br - US 190 Wb |
Pcc Patching, Patching, Milling, Overlay |
$10,000,000 to $15,000,000 |
5.97 |
Jefferson |
2025-11-12 |
H.015781 |
US 61 |
Us 61: Causeway - David |
Mill, Patch and Overlay |
$2,500,000 to $5,000,000 |
3.47 |
Orleans |
2025-09-10 |
H.015782 |
US 90 |
Us 90: Napoleon - US 90b |
Mill, Patch, and Overlay |
$2,500,000 to $5,000,000 |
1.13 |
Avoyelles |
2025-04-09 |
H.015784 |
LA 1182, LA 1181 |
La 1181 & La 1182: Asphalt Overlays |
Cement Treated Base and Overlay |
$2,500,000 to $5,000,000 |
3.00 |
Terrebonne |
2025-12-10 |
H.015805 |
LA 315 |
La 315:theriot Water Twr-tommy Darcey Br |
2" Mill and Overlay Of Asphalt Pavement |
$2,500,000 to $5,000,000 |
4.05 |
Orleans |
2025-12-10 |
H.015806 |
LA 3139 |
La 3139: Earhart Approach - Monroe St |
Pcc Pavement Patching and Restriping |
$500,000 to $1,000,000 |
0.37 |
St. Bernard |
2026-02-11 |
H.015809 |
LA 39 |
La 39 Patching: Norton Ave - Paris Rd |
Pcc Pavement Patching |
$1,000,000 to $2,500,000 |
2.01 |
Bienville |
2025-08-13 |
H.015810 |
LA 507 |
La 507: Red River Pl - Castor |
Asphalt Surface Treatment |
$500,000 to $1,000,000 |
4.50 |
Terrebonne |
2026-01-14 |
H.015819 |
LA 3040 |
La 3040: La 661 - 600' S Hollywood |
Pcc Pavement Patching and Restriping |
$2,500,000 to $5,000,000 |
3.61 |
Iberia |
2025-12-10 |
H.015823 |
US 90 |
Us 90 (Wb): La 83 - La 85 |
Remove and Replace PCCP |
$7,500,000 to $10,000,000 |
5.35 |
Ouachita |
2025-11-12 |
H.015825 |
LA 34 |
La 34: 0.3 Mi S La 617 - US 80 |
Pccp Patching, Mill & Overlay |
$5,000,000 to $7,500,000 |
2.50 |
Ouachita |
2025-12-10 |
H.015840 |
LA 617 |
La 617: La 34 - US 80 |
Pccp Patching |
$2,500,000 to $5,000,000 |
2.15 |
Calcasieu |
2026-02-11 |
H.015841 |
US 171 |
Us 171: US 90 - Moeling |
Crack/Joint Clean&seal & Pcc Patching |
$500,000 to $1,000,000 |
1.00 |
Tangipahoa |
2026-03-11 |
H.015842 |
US 51-X |
Us 51x: N 7th St - I-55 Coa |
Mill, Patch, and Overlay |
$2,500,000 to $5,000,000 |
0.73 |
Iberville |
2026-01-14 |
H.015843 |
LA 1 |
La 1: Ascension P/L - La 69 |
Patch, Mill, Asphalt Overlay, Pcc Patching |
$7,500,000 to $10,000,000 |
4.20 |
Orleans |
2025-12-10 |
H.015846 |
US 11 |
Us 11: Little Irish Bayou - I-10 |
Mill, Overlay, Patching, Pavement Markings and Raise Roadway |
$1,000,000 to $2,500,000 |
1.09 |
St. Landry |
2026-03-11 |
H.015849 |
US 190 |
Us 190: R-cut At La 741 |
Add an R-cut At La 741 Intersection and U-turns |
$1,000,000 to $2,500,000 |
0.73 |
Lafayette |
2025-11-12 |
H.015853 |
|
Tee Ma Road Sidewalks Carencro |
Pcc Sidewalks, Drainage Structures, Related Work |
$250,000 to $500,000 |
0.11 |
Lafourche |
2025-12-10 |
H.015856 |
|
Bowie Road Sidewalks (Thibodaux) |
Pcc Sidewalks, Drainage Structures, Related Work |
$500,000 to $1,000,000 |
0.51 |
Lafourche |
2025-05-14 |
H.015857 |
LA 20, LA 1 |
La 1 & La 20 @ St Patrick Bridge Ped Imp |
Ada Compliant Sidewalks and Curb Ramps |
$0 to $100,000 |
0.07 |
Rapides |
2025-09-10 |
H.015859 |
LA 1208-1 |
La 1208-1 Sidewalk Improvements |
Reconstruction Of Approximately 9,500 Lf Of Sidewalk For Ada |
$250,000 to $500,000 |
1.80 |
Lafayette |
2025-08-13 |
H.015866 |
LA 720 |
La 720: La 719 - La 343 |
Mill, In-place Base Rehab, and Overlay |
$2,500,000 to $5,000,000 |
2.01 |
Franklin |
2025-05-14 |
H.015873 |
LA 562 |
La 562: US 425 - Jct River Rd |
Patch and Overlay |
$2,500,000 to $5,000,000 |
7.50 |
Claiborne |
2025-08-13 |
H.015875 |
LA 9 |
La 9: Bienville Pl to La 518 |
Asphaltic Concrete Pavement Resurfacing |
$2,500,000 to $5,000,000 |
6.14 |
Jefferson Davis |
2025-07-09 |
H.015876 |
LA 14, LA 380 |
La 380: La 14 - La 26 |
Patch, Mill, and Overlay |
$500,000 to $1,000,000 |
1.15 |
Jefferson Davis |
2025-11-12 |
H.015877 |
LA 14 |
La 14: La 380-mermentau Bridge |
Patch, Mill, and Overlay |
$1,000,000 to $2,500,000 |
1.92 |
Plaquemines, St. Bernard |
2025-08-13 |
H.015881 |
LA 39 |
La 39: 155' S. La 46 - Floodwall |
Patch, Mill, and Overlay |
$1,000,000 to $2,500,000 |
1.33 |
Statewide |
2025-07-09 |
H.015892 |
|
Barge 305-008 Dry Dock For Repair (2024) |
Drydocking For Repairs, Maintenance, and Painting |
$500,000 to $1,000,000 |
0.00 |
Jefferson |
2025-04-09 |
H.015910 |
US 90 |
Us90: Hp Long Bridge (No)-joint Repairs |
Finger Joint Repairs |
$250,000 to $500,000 |
0.45 |
Ouachita |
2025-10-08 |
H.015921 |
|
West Monroe N. 6th Street Sidewalks |
Pcc Sidewalks, Drainage Structures, Related Work |
$1,000,000 to $2,500,000 |
0.90 |
East Baton Rouge |
2025-12-10 |
H.015922 |
US 61 |
Us 61: Florida Blvd to I-110 Impr |
Add Capacity and Provide Ped/Bike Facilities Where Needed |
$30,000,000 to $50,000,000 |
5.79 |
St. Landry |
2025-05-14 |
H.015929 |
LA 343 |
La 343: La 98 - La 356 |
Mill, Base Rehabilitation, Asphalt Overlay |
$5,000,000 to $7,500,000 |
5.18 |
Ouachita |
2025-06-30 |
H.015937 |
|
Cheniere Bapt Church: Kcs Xg(Ouachita) |
Install RR Warning Devices |
$250,000 to $500,000 |
0.01 |
Orleans |
2025-04-09 |
H.015945 |
LA 428 |
La 428 Sidewalk Improvements |
Adding Sidewalks and Curb Ramps |
$100,000 to $250,000 |
0.12 |
Vermilion |
2025-11-12 |
H.015949 |
LA 335 |
La 335: E. Jct. La 694 - La 14 |
Base Rehabilitation & Asphalt Overlay |
$5,000,000 to $7,500,000 |
3.45 |
Iberville |
2025-08-20 |
H.015951 |
|
Dorcy & Lacroix: Up Crossings(Iberville) |
Railroad Surface and Closure |
$250,000 to $500,000 |
0.02 |
Acadia |
2025-06-11 |
H.015954 |
LA 1100, LA 95, LA 365 |
La 95 & La 1100: La 98 - La 365 |
Base Rehabilitation & Asphalt Overlay |
$7,500,000 to $10,000,000 |
5.74 |
East Baton Rouge |
2025-12-10 |
H.015956 |
LA 19 |
La 19: Turn Lanes @ New Rafe Mayer Rd |
Add Nb and Sb Left Turn Lanes On La 19 @ New Rafe Mayer Rd |
$1,000,000 to $2,500,000 |
0.22 |
Vernon |
2025-08-13 |
H.015958 |
LA 117 |
La 117: Tank Trail Rd Intersection Imp |
Improve Turnouts, Widen Shoulders, Install Advance Warning |
$500,000 to $1,000,000 |
0.25 |
Rapides |
2025-11-12 |
H.015963 |
US 165-X |
Us 165: Red Rvr Mb Ped Gates(Jackson St) |
Structural, Mechanical, Electrical |
$500,000 to $1,000,000 |
0.19 |
East Baton Rouge |
2025-07-01 |
H.015987 |
|
Isabel Herson Trail |
Construction Of Asphalt Multi-use Path |
$250,000 to $500,000 |
0.07 |
Terrebonne |
2025-07-01 |
H.015991 |
|
Bayou Terrebonne Trailhead |
Construction Of Paddle Boat Trailhead |
$100,000 to $250,000 |
0.01 |
Assumption |
2025-07-01 |
H.015992 |
LA 70 |
Belle River Museum Trail |
Construction Of Recreational Trail |
$250,000 to $500,000 |
0.04 |
Ouachita |
2025-07-01 |
H.015993 |
|
Russell Sage Wma- Zemones Trail |
Repair Of Recreational Trail |
$100,000 to $250,000 |
0.07 |
LaSalle |
2025-07-01 |
H.015994 |
|
Dewey Wills Wma- F-lease Trail |
Repair Of Recreational Trail |
$100,000 to $250,000 |
0.86 |
Concordia |
2025-07-01 |
H.015995 |
LA 15 |
Yancey Wma- Crouch and Zeek Trails |
Repair Of Recreational Trail |
$100,000 to $250,000 |
2.33 |
Allen |
2025-07-01 |
H.015996 |
|
Oberlin Gateway Trail |
Construction Of New Asphalt Path |
$250,000 to $500,000 |
0.38 |
West Feliciana |
2025-07-01 |
H.015997 |
|
Joseph Mason Trail |
Construction Of a Recreational Trail |
$100,000 to $250,000 |
0.09 |
Lafayette |
2025-05-14 |
H.015999 |
LA 724 |
La 724: W Broussard - La 342 |
Mill, Patch, and Overlay |
$1,000,000 to $2,500,000 |
2.42 |
Calcasieu |
2026-01-14 |
H.016001 |
LA 1256 |
La 1256 @ Patch St/W. Cal Blvd Int Impr |
Minor Widening, Raised Median Curb & Convert Riro Approach |
$500,000 to $1,000,000 |
0.09 |
Calcasieu |
2025-08-13 |
H.016008 |
US 90, LA 3256 |
Us 90 & La 3256: Asphalt Overlays |
Asphalt Overlay |
$1,000,000 to $2,500,000 |
2.09 |
Vermilion |
2025-05-14 |
H.016011 |
LA 699 |
La 699: La 35 - La 343 |
Base Rehabiliation & Asphalt Overlay |
$5,000,000 to $7,500,000 |
5.51 |
St. John Baptist |
2025-05-14 |
H.016028 |
I-10 |
I-10: St John Pl to US 51 Pave Mkgs |
Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
12.50 |
Bienville, Webster |
2025-05-14 |
H.016031 |
I-20 |
I-20: La 371 to La 154 Pave Mkgs |
Pavement Striping and Raised Pavement Markers |
$500,000 to $1,000,000 |
13.19 |
Caddo |
2026-01-14 |
H.016033 |
I-49 |
I-49: La 526 to I-20 Pavement Markings |
Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
7.16 |
St. Tammany, Tangipahoa |
2025-09-10 |
H.016034 |
I-12 |
I-12: I-55 to La 21 Pavement Markers |
Raised Pavement Markers |
$100,000 to $250,000 |
20.96 |
St. Tammany |
2025-05-14 |
H.016042 |
I-12, I-10, I-59 |
I-10/I-12/I-59: Signs & Pvmt Markings |
Permanent Signs, Pavement Markings & Related Work |
$2,500,000 to $5,000,000 |
13.13 |
Orleans |
2025-10-08 |
H.016043 |
US 90 |
Us 90 (Claiborne) @ Audubon Bl: Int Impr |
Two Channelized Left Turn Lanes and Single Sidewalk |
$250,000 to $500,000 |
0.16 |
Catahoula, Concordia, Franklin, LaSalle, Tensas |
2025-05-14 |
H.016044 |
LA 135, LA 126, LA 577, LA 569, LA 460, LA 3024, US 65, US 425, LA 860, LA 618 |
D58 Rumble Strips and Striping Ph 1 |
Rumble Strips and Striping |
$1,000,000 to $2,500,000 |
80.49 |
Jackson |
2025-04-09 |
H.016050 |
US 167 |
Us 167: Hunt St - La 147 |
Mill and Overlay With Ultra-thin Whitetopping |
$2,500,000 to $5,000,000 |
0.38 |
St. Martin |
2025-06-11 |
H.016052 |
LA 96 |
La 96: 0.12 Mi. East Of La 347 - La 352 |
Patch, Mill, Overlay |
$10,000,000 to $15,000,000 |
11.53 |
Evangeline |
2025-06-11 |
H.016054 |
LA 13 |
La 13: La 10 - US 167 |
Patch, Mill, and Overlay |
$10,000,000 to $15,000,000 |
12.80 |
Iberia |
2025-06-11 |
H.016055 |
LA 83 |
La 83: US 90 - Darnall Road |
Milling, Base Rehabilitation, Asphalt Overlay |
$7,500,000 to $10,000,000 |
4.72 |
Acadia |
2025-06-11 |
H.016056 |
LA 95 |
La 95: La 365 - Beg. Of PCCP |
Patch, Mill, Overlay, & Drainage |
$5,000,000 to $7,500,000 |
4.45 |
Caddo |
2025-04-09 |
H.016059 |
LA 530 |
La 530: La 538 to I-49 |
Stabilize and Overlay |
$2,500,000 to $5,000,000 |
5.38 |
Statewide |
2025-07-09 |
H.016062 |
|
Barge 305-069 - 2025 Drydock |
Drydock For Exam and Other Maint & Repairs |
$500,000 to $1,000,000 |
0.00 |
Tangipahoa |
2025-05-14 |
H.016065 |
|
District 62 Flashing Yellow Arrow Part 2 |
Traffic Signal Improvement |
$7,500,000 to $10,000,000 |
0.00 |
East Baton Rouge |
2025-04-01 |
H.016074 |
|
Kcs 2016 Fra Step (Baton Rouge) |
Install/Upgrade Active Warning Devices |
$1,000,000 to $2,500,000 |
0.08 |
East Baton Rouge |
2025-12-10 |
H.016075 |
I-10 |
I-10: Washington Street Eb Exit Ramp Cl |
Signing, Striping, Temporary Barrier Placement |
$1,000,000 to $2,500,000 |
1.25 |
Iberia |
2025-12-10 |
H.016087 |
LA 83 |
La 83: 1.9 Mi N Weeks Isl-5.7 Mi S Lydia |
Asphalt Overlay |
$1,000,000 to $2,500,000 |
0.73 |
St. Mary |
2026-03-11 |
H.016095 |
LA 70 |
La 70 Rehab: Marguerite St to US 90 |
Full Depth Reconstruction, Subsurface Drainage |
$5,000,000 to $7,500,000 |
0.42 |
Bossier, Caddo |
2025-07-09 |
H.016100 |
LA 511, LA 789, LA 614, US 80 |
District 04 Overlays: Northern Parishes |
District Wide Overlay Project |
$1,000,000 to $2,500,000 |
6.13 |
Calcasieu |
2026-01-14 |
H.016103 |
LA 14 |
La 14: La 397 - Gerstner Memorial |
Structural Overlay |
$2,500,000 to $5,000,000 |
3.05 |
Cameron |
2026-02-11 |
H.016115 |
LA 82 |
La 82: 0.9 Mi E N Island Rd - Vermillion |
Patch, Mill, Overlay |
$2,500,000 to $5,000,000 |
6.52 |
St. Landry |
2025-05-14 |
H.016119 |
LA 178 |
La 178: W. Jct. La 182 - E. Jct. La 182 |
Mill,In-place Base Rehab,Overlay,Guard Rail, & Drainage Work |
$2,500,000 to $5,000,000 |
2.45 |
Acadia |
2026-03-11 |
H.016120 |
LA 1104 |
La 1104: La 178 - La 754 |
Mill, In-place Base Rehab, & Overlay |
$1,000,000 to $2,500,000 |
1.08 |
Concordia |
2025-09-10 |
H.016121 |
LA 906 |
La 906: La 129 - End Of Maintenance |
Patch & Overlay |
$1,000,000 to $2,500,000 |
2.40 |
LaSalle |
2025-09-10 |
H.016123 |
LA 771 |
La 771: La 503 - End Of Maintenance |
Patch & Overlay |
$1,000,000 to $2,500,000 |
4.51 |
Livingston |
2025-12-10 |
H.016124 |
LA 1020 |
La 1020: La 1019 - End Maint |
Patch, Mill and Overlay |
$500,000 to $1,000,000 |
1.99 |
Evangeline |
2025-12-10 |
H.016125 |
LA 1159 |
La 1159: La 1158 - 1.5 Mi On Aguilard Rd |
Mill, In-place Base Rehab, & Overlay |
$1,000,000 to $2,500,000 |
1.51 |
Caldwell |
2025-11-12 |
H.016126 |
LA 506 |
La 506: US 165 - La 849 |
Patch & Overlay |
$1,000,000 to $2,500,000 |
3.02 |
St. Martin |
2025-07-09 |
H.016143 |
LA 349 |
La 349: La 347 - La 352 |
Scrub Seal & Thin Overlay |
$1,000,000 to $2,500,000 |
3.43 |
St. Tammany |
2025-12-10 |
H.016147 |
I-12 |
I-12: Airport Rd - I-10 |
Patch, Mill and Overlay |
$5,000,000 to $7,500,000 |
5.28 |
Tangipahoa |
2025-06-11 |
H.016149 |
I-55 |
I-55: La 1050 Opass - St Line |
Mill and Overlay |
$15,000,000 to $20,000,000 |
7.89 |
Bienville, DeSoto, Red River |
2025-07-09 |
H.016154 |
US 371, LA 4, LA 177 |
District 04 Overlays: Southern Parishes |
District Wide Overlay Project |
$2,500,000 to $5,000,000 |
7.53 |
Orleans |
2026-01-14 |
H.016155 |
I-10 |
I-10 @ US 61 Ramp Drainage |
Install Drainage Structures |
$0 to $100,000 |
0.06 |
Bossier, Caddo |
2025-09-10 |
H.016156 |
LA 3194, LA 3036, LA 3032, LA 3, LA 526, LA 523, LA 511 |
District 04 Concrete Patching |
District Wide Concrete Patching Project |
$2,500,000 to $5,000,000 |
17.38 |
St. Tammany |
2026-01-14 |
H.016157 |
LA 433 |
La 433: Grade Raising |
Asphalt Grade Raising |
$100,000 to $250,000 |
0.23 |
St. Mary |
2026-03-11 |
H.016158 |
US 90-W, LA 182 |
La 182: US 90 - Greenwood St. Overpass |
Patching, Mill and Overlay, Ada Ramps At Turnouts |
$7,500,000 to $10,000,000 |
2.51 |
Statewide |
2026-01-14 |
H.016172 |
|
M/V Belle Chase II 2025 Uscg Drydock |
Drydock For Uscg Exam and Other Maint & Repairs |
$500,000 to $1,000,000 |
0.00 |
Terrebonne |
2026-03-11 |
H.016196 |
LA 664 |
La 664: La 24 - La 3040 |
Concrete Patching and Striping |
$250,000 to $500,000 |
0.53 |
Terrebonne |
2026-03-11 |
H.016199 |
LA 315 |
La315:falgout Canal Mb Sub Cable Rh(Hbi) |
Electrical |
$250,000 to $500,000 |
0.03 |
Iberville |
2026-02-11 |
H.016200 |
LA 75-S |
La 75-s: Bayou Sorrel Mb Winch Reh(Hbi) |
Mechanical |
$100,000 to $250,000 |
0.06 |
Iberia |
2025-12-10 |
H.016202 |
LA 14, LA 320 |
La14&320:delcambre & Olivier Mb Sub Cbls |
Electrical |
$500,000 to $1,000,000 |
0.09 |
Ascension, St. James |
2026-03-11 |
H.016223 |
LA 3127 |
La 3127: La 70 - St. James Canal Bridge |
Mill, Patch, Overlay |
$5,000,000 to $7,500,000 |
6.75 |
St. James |
2025-04-30 |
H.016268 |
LA 3213 |
La 3213:ic-cn RR Xing Surface (St James) |
Reconstruct Railroad Crossing Surface |
$250,000 to $500,000 |
0.01 |
Lafayette |
2025-12-10 |
H.016279 |
I-10 |
I-10 @ La182: Girder Repair |
Bridge Repair - Girder Was Hit and Needs to be Replaced |
$1,000,000 to $2,500,000 |
0.04 |
Orleans |
2025-11-12 |
H.016361 |
LA 428 |
La 428(Gen Degaulle): Marr & Wall Bl Int |
Intersection Improvements and Sidewalks |
$500,000 to $1,000,000 |
0.40 |
Jefferson |
2025-10-08 |
H.016366 |
US 90 |
Us 90: Avondale Ped Impr |
Concrete Sidewalks and Curb Ramps |
$1,000,000 to $2,500,000 |
1.46 |
Ascension |
2025-04-24 |
H.016384 |
LA 42 |
La 42: Emergency Drainage Repair |
Replace Cross Drain, Close In Ditch With Rcb, Asphalt Paving |
$500,000 to $1,000,000 |
0.10 |
Lafayette |
2025-12-10 |
H.016393 |
|
University Avenue Corridor Improvements |
Construct Raised Median, Pvmt Preservation and Sidewalks |
$2,500,000 to $5,000,000 |
2.25 |
St. James |
2025-12-10 |
H.016397 |
LA 3274, LA 3125 |
La 3125 @ La 3274 Roundabout Clear&grub |
Clearing and Grubbing |
$0 to $100,000 |
0.52 |
Statewide |
2026-01-14 |
H.016399 |
|
M/V Acadia - 2026 Uscg Drydock |
Drydock For Uscg Exam and Other Maint & Repairs |
$1,000,000 to $2,500,000 |
0.00 |
Lafayette |
2025-04-22 |
H.016407 |
LA 182 |
La 182 Ust Removal |
Removal Of Underground Storage Tank |
$0 to $100,000 |
0.01 |
Iberville |
2026-02-11 |
H.016409 |
LA 30 |
La 30 @ La 74 Fya Signal Upgrade |
Traffic Signal Improvements |
$100,000 to $250,000 |
0.22 |
Rapides |
2026-02-11 |
H.016415 |
I-49, US 165-X, US 165, LA 1 |
District 08 Fya Part 3 (Rr Only) |
Flashing Yellow Arrow |
$250,000 to $500,000 |
0.22 |
East Baton Rouge, Livingston |
2025-12-10 |
H.016417 |
I-12 |
I12: Median Barrier Retrofit |
Retrofit Median Barriers |
$7,500,000 to $10,000,000 |
13.25 |
Statewide |
2025-04-30 |
H.016418 |
|
Statewide Drivewyze Deployments |
Statewide Safety Alerts and Advisories For Cmv |
$100,000 to $250,000 |
0.00 |
Calcasieu |
2026-01-14 |
H.016424 |
I-10 |
I-10: I-210 W - I-210 E Pave Markings |
Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
9.59 |
Ascension |
2025-12-10 |
H.016425 |
I-10 |
I-10: Ebr Pl - St James Pl Pave Mkgs |
Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
21.66 |
Lafayette, St. Martin |
2025-11-12 |
H.016426 |
I-10 |
I-10: I-49 - Atchaf Basin Pave Mkgs |
Pavement Striping and Raised Pavement Markers |
$500,000 to $1,000,000 |
13.71 |
St. Martin |
2025-12-10 |
H.016427 |
I-10 |
I-10: W. Atchaf Basin - Iber Pl Pave Mkg |
Pavement Striping and Raised Pavement Markers |
$500,000 to $1,000,000 |
9.32 |
Ouachita |
2025-11-12 |
H.016429 |
I-20 |
I-20: Ouachita River Bridge Pave Mkgs |
Pavement Striping and Raised Pavement Markers |
$250,000 to $500,000 |
1.81 |
Orleans |
2025-11-12 |
H.016430 |
I-510 |
I-510: I-10 - Paris Rd Br Pave Mkgs |
Pavement Striping and Raised Pavement Markers |
$250,000 to $500,000 |
3.43 |
Iberville |
2025-12-10 |
H.016431 |
I-10 |
I-10: St. Martin Pl - Ramah Pave Marking |
Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
8.63 |
Webster |
2026-01-14 |
H.016434 |
LA 792 |
La 792: Bienville Pl to La 531 |
Asphalt Surface Treatment |
$250,000 to $500,000 |
2.50 |
Caddo |
2026-03-11 |
H.016438 |
US 171, LA 3094 |
Us 171: Ped Improvements (Shreveport) |
Pedestrian Improvements |
$1,000,000 to $2,500,000 |
0.68 |
St. Charles, St. John Baptist |
2025-10-08 |
H.016439 |
I-10 |
I-10: I-55 to Jefferson P/L Pave Mkgs |
Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
11.87 |
Rapides |
2025-06-03 |
H.016440 |
I-49 |
I-49: Elevated Pavement Markers Repl |
Pavement Marking On Elevated I-49 |
$250,000 to $500,000 |
7.06 |
Calcasieu |
2025-06-11 |
H.016441 |
I-10 |
I-10: I-210?us 165 Pavement Markers Repl |
Pavement Marking Project On I-10 From I-210 to E Of US 165 |
$500,000 to $1,000,000 |
9.57 |
St. Mary |
2025-06-03 |
H.016442 |
US 90 |
Us 90:0.2mi E La182-duhon Blvd Pvmt Mkgs |
Pavement Marking Project On I-49 and US 90 |
$250,000 to $500,000 |
8.02 |
Jefferson, Lafourche, Orleans, St. Charles, Terrebonne |
2025-06-11 |
H.016443 |
I-310, I-10, US 90-Z, US 90, LA 3139, I-910 |
District 02: Pavement Markers Repl |
Pavement Marking Project On I-0,I910,Us90b,Us 90,La3139,I310 |
$5,000,000 to $7,500,000 |
107.33 |
Livingston, St. John Baptist, St. Tammany, Tangipahoa |
2025-06-11 |
H.016444 |
I-59, I-55, I-12 |
District 62: Pavement Markers Repl |
Striping I12,I55,I59 |
$2,500,000 to $5,000,000 |
59.69 |
Assumption, East Baton Rouge |
2025-06-11 |
H.016445 |
I-10, US 90, I-12, I-110 |
District 61: Pavement Markers Repl |
Pavement Marking Project On Us90,I10,I110,I12 |
$1,000,000 to $2,500,000 |
21.04 |
St. Tammany |
2025-06-01 |
H.016446 |
LA 1091 |
La 1091: City Of Slidell Rt |
Provide $3,678,082 to the City Of Slidell For La 1091 |
$2,500,000 to $5,000,000 |
1.87 |