Parish |
Letting Date |
Project |
Route |
Project Name |
Type Improvement |
Estimated Cost Range |
Length (miles) |
Grant |
2024-10-08 |
H.015062 |
LA 502, LA 3169, LA 524 |
La 3169, La 524, La 502: Grant Parish Rt |
Provide $3,949,784 In Funds to Grant Parish |
$2,500,000 to $5,000,000 |
6.06 |
Grant |
2024-10-08 |
H.015244 |
LA 502 |
La 502: Village Of Georgetown Rt |
Provide $460,334 In Funds to the Village Of Georgetown |
$250,000 to $500,000 |
1.00 |
Avoyelles |
2024-10-09 |
H.015593 |
LA 115 |
La 115: La 1188 - La 114 W Jct |
In-place Stabilize Base and Overlay |
$2,500,000 to $5,000,000 |
2.54 |
Bienville |
2024-10-09 |
H.015299 |
US 371 |
Us 371: Red River P/L - Webster P/L |
Mill, Patch and Overlay |
$10,000,000 to $15,000,000 |
12.02 |
Caddo |
2024-10-09 |
H.014410 |
|
Linwood Avenue Reconstruction-phase Iii |
Roadway Reconstruction - Joint and Panel Repair |
$5,000,000 to $7,500,000 |
0.99 |
Evangeline |
2024-10-09 |
H.015621 |
LA 3277 |
La 3277: La 757 - La 104 |
Mill, Base Stabilization, and Overlay |
$5,000,000 to $7,500,000 |
4.90 |
Lincoln |
2024-10-09 |
H.015233 |
LA 823 |
La 823: Drainage Improvements |
Asphalt Lifts to Raise Roadway & Re-establish Exist. Ditches |
$250,000 to $500,000 |
0.20 |
Lincoln |
2024-10-09 |
H.015471 |
|
E. Kentucky Ave: Goodwin to La 33 |
Reconst Pavement, Add Center Turn Lane, Subsurface Drainage |
$10,000,000 to $15,000,000 |
1.16 |
Morehouse |
2024-10-09 |
H.014904 |
US 165, LA 138, US 425 |
Us 425: Up RR Xing (Mer Rouge) |
Improve/Upgrade Approaches |
$250,000 to $500,000 |
0.05 |
St. Bernard |
2024-10-09 |
H.015797 |
LA 46 |
La 46: Webster St.-la 39 & La 39-la 300 |
Asphalt Patching and Striping |
$500,000 to $1,000,000 |
12.70 |
St. Charles |
2024-10-09 |
H.015884 |
US 90 |
Us 90: La 3060 - 1560' W Jefferson P/L |
Mill and Overlay, Patching, Guardrail, and Striping |
$2,500,000 to $5,000,000 |
4.08 |
St. Landry |
2024-10-09 |
H.015357 |
LA 182, LA 31 |
La 31/La 182: La 742 - 0.355mi. N. La 31 |
Mill, Patch, Asphalt Overlay, and Base |
$2,500,000 to $5,000,000 |
2.58 |
Statewide |
2024-10-09 |
H.015955 |
|
M/V Plaquemines Pride 2024 Uscg Drydock |
Drydock For Uscg Exam and Repairs |
$1,000,000 to $2,500,000 |
0.00 |
Webster |
2024-10-09 |
H.015776 |
LA 160 |
La 160: Bodcau Creek to US 371 |
Medium Overlay |
$1,000,000 to $2,500,000 |
2.17 |
West Baton Rouge |
2024-10-09 |
H.014258 |
LA 1 |
La 1:port Allen Canal Br Repl (Ph2)(Hbi) |
Bridge Replacement |
$70,000,000 to $100,000,000 |
1.23 |
Jefferson |
2024-10-29 |
H.016245 |
US 61 |
Us 61: Patching Near Lester Ave |
Asphalt Patching |
$0 to $100,000 |
0.08 |
Terrebonne |
2024-10-29 |
H.016247 |
LA 24 |
La 24 Catch Basin Repair @ King St |
Catch Basin Replacement |
$0 to $100,000 |
0.00 |
Ascension |
2024-11-13 |
H.015438 |
LA 928 |
La 928: La 74 - La 427 |
Patch, Mill, Asphalt Overlay, Grade Raising, Drainage Work |
$2,500,000 to $5,000,000 |
5.68 |
Bossier |
2024-11-13 |
H.015519 |
|
Smith Road Over Red Chute Bayou |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.04 |
Calcasieu |
2024-11-13 |
H.011196 |
|
Lake Charles Srts Proj. - Barbe Elem. |
Sidewalks, Striping and Signing |
$500,000 to $1,000,000 |
1.60 |
Calcasieu |
2024-11-13 |
H.015278 |
LA 397 |
La 397: US 90 - 400' N Lebleu Cemetery R |
Pccp Patching and Pavement Rehab |
$1,000,000 to $2,500,000 |
1.26 |
DeSoto |
2024-11-13 |
H.015196 |
|
Local Road Striping & Signing (Desoto) |
Signing, Striping, Pavement Markings and Related Work |
$1,000,000 to $2,500,000 |
41.68 |
East Baton Rouge |
2024-11-13 |
H.002320 255-30-0014 |
LA 408, LA 3034 |
Sullivan Rd (Wax - Hooper) |
4 Ln Divided Conc Hwy Raised Median |
$15,000,000 to $20,000,000 |
1.13 |
East Baton Rouge |
2024-11-13 |
H.014993 |
|
Lemon Rd Over Drainage Bayou |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
East Baton Rouge |
2024-11-13 |
H.015126 |
|
Baker Blvd Improvements: La 19 to Mchugh |
Mill and Overlay Baker Blvd From La 19 to Mchugh Rd |
$500,000 to $1,000,000 |
1.04 |
East Baton Rouge |
2024-11-13 |
H.015251 |
LA 3006 |
La 3006: La 19 - La 67 |
Structural Overlay, Base Stabilization & Drainage Structures |
$5,000,000 to $7,500,000 |
2.54 |
East Baton Rouge, Livingston |
2024-11-13 |
H.015838 |
I-12, I-10 |
I-10 & I-12: Patching |
Pccp Patching |
$5,000,000 to $7,500,000 |
9.86 |
Evangeline |
2024-11-13 |
H.015619 |
LA 106 |
La 106: US 167 - Avoyelles P/L |
Mill, Base Rehabilitation, Asphalt Overlay |
$10,000,000 to $15,000,000 |
8.26 |
Evangeline, St. Landry |
2024-11-13 |
H.015620 |
LA 758 |
La 758: US 190 - La 29 |
Mill, Base Rehabilitation, Asphalt Overlay |
$2,500,000 to $5,000,000 |
3.10 |
Iberia |
2024-11-13 |
H.015026 |
LA 87 |
La 87: La 3182 - 0.65 Mi Se Of La 3182 |
Mill, Patch, Asphalt Overlay, Drainage Improvements |
$500,000 to $1,000,000 |
0.64 |
Iberia, St. Martin |
2024-11-13 |
H.015617 |
LA 31 |
La 31: La 182 - 0.899 Mi S La 92 |
Patch, Mill, Asphalt Overlay |
$10,000,000 to $15,000,000 |
5.83 |
Iberville |
2024-11-13 |
H.015440 |
LA 69 |
La 69: 0.5 Mi N Of La 404 - La 1 |
Pcc Patching, Clean & Reseal Joints |
$2,500,000 to $5,000,000 |
2.12 |
Jefferson |
2024-11-13 |
H.012012 |
|
Ridgewood/Stroelitz (Airline to Loumor) |
Concrete Overlay |
$2,500,000 to $5,000,000 |
0.00 |
Jefferson |
2024-11-13 |
H.012885 |
LA 466 |
La 466: 5th St Improvements (Gretna) |
Bike Lanes, Multi-use Paths, Ada Sidewalks |
$7,500,000 to $10,000,000 |
0.57 |
Jefferson Davis |
2024-11-13 |
H.015287 |
LA 3166 |
La 3166: La 1126 - Castex Landing |
Thin Overlay |
$500,000 to $1,000,000 |
1.82 |
Lafayette |
2024-11-13 |
H.012868 |
|
Fortune Road Pavement Preservation |
Overlay |
$500,000 to $1,000,000 |
1.12 |
Lafayette |
2024-11-13 |
H.015386 |
|
Lafayette Parish Fya (Lcg) |
Flashing Yellow Arrows and Signal Back Plates |
$5,000,000 to $7,500,000 |
0.00 |
Lafourche |
2024-11-13 |
H.013269 |
|
Audubon Ave Ovly:la 1 to Terrebonne P/L |
Asphalt Overlay |
$1,000,000 to $2,500,000 |
1.44 |
Lafourche |
2024-11-13 |
H.013429 |
|
Downtown Thibodaux Sidewalks |
Enhancements - Upgrade Sidewalks to Ada |
$1,000,000 to $2,500,000 |
1.37 |
Lafourche |
2024-11-13 |
H.014924 |
LA 308 |
La 308: Bartley Ln to Laurel Valley Rd |
Shoulder Widening and Curve Signs |
$1,000,000 to $2,500,000 |
1.98 |
Lincoln |
2024-11-13 |
H.013720 |
|
Bonner St Bridge Ped Impr (Ruston) |
Ped Impr (Ramps, Signs, Striping, Ped Lighting) |
$500,000 to $1,000,000 |
0.14 |
Lincoln, Morehouse, Ouachita, Richland, Union |
2024-11-13 |
H.015930 |
US 165, LA 34, US 63, US 425, US 167 |
D05 Rumble Strips and Striping Ph 2 |
Installation Of Rumble Strips, Striping and Rpm's |
$2,500,000 to $5,000,000 |
70.16 |
Madison |
2024-11-13 |
H.015323 |
LA 577 |
La 577: Joe's Bayou Rd - 1500 Ft N I-20 |
Major PCCP Patching and Rehabilitation Of Asphalt Shoulders |
$2,500,000 to $5,000,000 |
0.63 |
Natchitoches |
2024-11-13 |
H.015360 |
I-49 |
I-49: Nb & Sb Slope Repair |
Embankment Repair |
$30,000,000 to $50,000,000 |
3.17 |
Orleans |
2024-11-13 |
H.015221 |
LA 3019 |
La 3019: Orleans P/L - West End Blvd |
Mill and Overlay, Pavement Patching and Related Work |
$1,000,000 to $2,500,000 |
0.46 |
Rapides |
2024-11-13 |
H.012641 |
|
District 08 Flashing Yellow Arrow Part 2 |
Traffic Signal Upgrades |
$7,500,000 to $10,000,000 |
0.00 |
Red River |
2024-11-13 |
H.015775 |
LA 515 |
La 515: US 71 - La 514 |
Thin Overlay |
$2,500,000 to $5,000,000 |
6.09 |
St. Bernard |
2024-11-13 |
H.012891 |
LA 300 |
La 300: Bayou Laloutre Bridge |
Bridge Replacement |
$1,000,000 to $2,500,000 |
1.45 |
St. Bernard |
2024-11-13 |
H.014049 |
LA 47, LA 39 |
St Bernard Pedestrian Improvements |
Signing, Striping, Signal, Crosswalk Improvements |
$500,000 to $1,000,000 |
0.64 |
St. Bernard |
2024-11-13 |
H.014771 |
LA 300 |
La 300: La 39 - La 46 |
Patch, Mill and Overlay |
$500,000 to $1,000,000 |
2.10 |
St. Martin |
2024-11-13 |
H.014793 |
LA 92-1 |
La 92-1: US 90 - La 182 |
Mill, In-place Base Rehab. & Overlay |
$5,000,000 to $7,500,000 |
3.06 |
St. Mary |
2024-11-13 |
H.015592 |
LA 3211 |
La 3211: RR Crossing - La 182 |
Milling, Base Rehabilitation and Asphalt Overlay |
$1,000,000 to $2,500,000 |
0.93 |
Tangipahoa |
2024-11-13 |
H.011512 |
US 51 |
Us 51 @ Sycamore St Amite City Drainage |
Additional Pipe(S), Catch Basins, And/Or Asphalt |
$0 to $100,000 |
0.04 |
Vernon |
2024-11-13 |
H.012058 |
LA 8 |
La 8: Forker Creek Bridge |
Bridge Replacement |
$7,500,000 to $10,000,000 |
0.33 |
DeSoto |
2024-11-30 |
H.016257 |
US 84 |
Us 84 : Kcs RR Xing (Mansfield) |
Reconstruct Railroad Crossing Surface |
$500,000 to $1,000,000 |
0.10 |
Caddo, Calcasieu, Lincoln, Madison, St. Landry, St. Martin, St. Tammany, Tangipahoa |
2024-12-01 |
H.015967 |
I-20, I-10, I-59, I-55, I-49 |
2024 Statewide Rest Area Cctv Upgrade |
Replace Existing Cctv Systems At All Rest Areas |
$2,500,000 to $5,000,000 |
5.27 |
East Baton Rouge |
2024-12-01 |
H.010251 |
LA 3164 |
Chippewa St Pump Station Imp Phase 2 |
Feasibility Study |
$1,000,000 to $2,500,000 |
0.43 |
St. Mary |
2024-12-01 |
H.015222 |
|
Bayou Vista Trail |
Const. Of Approx. 1 Mile Of 10 Ft Wide Asphalt Path |
$250,000 to $500,000 |
0.51 |
Acadia |
2024-12-11 |
H.012919 |
LA 100 |
La 100: La 97 - La 91 |
Base Stabilization, Asphalt Overlay |
$5,000,000 to $7,500,000 |
5.32 |
Bienville |
2024-12-11 |
H.014222 |
LA 516 |
La 516: Poland Branch Bridge |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.09 |
Caddo |
2024-12-11 |
H.015256 |
LA 3132 |
La 3132: US 171 - La 523 Signing |
Permanent Signing |
$2,500,000 to $5,000,000 |
5.09 |
Calcasieu |
2024-12-11 |
H.012083 |
I-10, LA 378 |
I-10: Calcasieu River Bridge Int Repairs |
Bridge Interim Repairs |
$15,000,000 to $20,000,000 |
2.60 |
Calcasieu |
2024-12-11 |
H.012603 |
LA 27 |
Ellender Br Bearing and Span Lock Rehab. |
Movable Bridge Machinery Repairs |
$100,000 to $250,000 |
0.55 |
Calcasieu |
2024-12-11 |
H.014815 |
LA 3059 |
La 3059: Goos Ferry Rd - Red Marceaux Rd |
Patch, Mill & Overlay |
$1,000,000 to $2,500,000 |
3.99 |
Cameron |
2024-12-11 |
H.014870 |
LA 1143 |
La 1143: La 27-muria Rd |
Patch, Widening & Overlay |
$2,500,000 to $5,000,000 |
7.09 |
DeSoto |
2024-12-11 |
H.012614 |
LA 175 |
La 175: La 509 to La 5 |
Asphaltic Concrete Pavement Resurfacing |
$10,000,000 to $15,000,000 |
10.40 |
East Feliciana |
2024-12-11 |
H.015557 |
LA 10 |
La 10: La 67 - Smith Rd |
Patching, Milling, Asphalt Overlay |
$2,500,000 to $5,000,000 |
5.58 |
Jefferson |
2024-12-11 |
H.014777 |
LA 3154 |
La 3154: La 48 - Ninth St. |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
1.03 |
Jefferson |
2024-12-11 |
H.015818 |
LA 49 |
La 49: W Metairie Ave - US 61 |
Mill, Overlay, and Turn Lane Widening |
$1,000,000 to $2,500,000 |
0.72 |
Jefferson Davis |
2024-12-11 |
H.015288 |
LA 1130 |
La 1130: US 190 - La 26 |
Asphalt Patching, Milling, 3.5? Overlay, and Drainage |
$1,000,000 to $2,500,000 |
1.48 |
Lafayette |
2024-12-11 |
H.012867 |
|
S Larriviere Rd: La 92 - Chemin Metairie |
Add Center Turn Lane |
$7,500,000 to $10,000,000 |
1.20 |
Lafourche |
2024-12-11 |
H.014780 |
LA 3266 |
La 3266: La 308 - Forty Arpent Rd |
Patch, Mill and Overlay |
$2,500,000 to $5,000,000 |
1.29 |
Lafourche, Terrebonne |
2024-12-11 |
H.014802 |
LA 316, LA 24 |
La316&la24:mill,Ovrly,Grade Raising,Hfst |
Patch, Mill and Overlay, Hfst, Shld Widening, Grade Raising |
$10,000,000 to $15,000,000 |
7.74 |
Livingston |
2024-12-11 |
H.015355 |
|
W Colyell Bridge Replacement |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.00 |
Rapides |
2024-12-11 |
H.011504 |
US 167, US 71 |
Alexandria ITS Phase 2 |
Installing Bridge Advisories, Cctvs, and Dmss |
$2,500,000 to $5,000,000 |
6.73 |
St. John Baptist |
2024-12-11 |
H.015362 |
LA 628 |
La 628: Lm 0.522 - St Charles P/L |
Patching, Milling and Overlay |
$1,000,000 to $2,500,000 |
2.12 |
St. John Baptist |
2024-12-11 |
H.016028 |
I-10 |
I-10: St John Pl to US 51 Pave Mkgs |
Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
12.50 |
St. Landry |
2024-12-11 |
H.014556 |
I-49 |
I-49: US 190 Intchg Lighting (Opelousas) |
Replacement Of an Existing Interstate Lighting System |
$2,500,000 to $5,000,000 |
0.94 |
St. Tammany |
2024-12-11 |
H.007588 744-52-0039 |
|
Girod Street Landscaping and Lighting, P |
Landscaping and Lighting For Sidewalk |
$100,000 to $250,000 |
0.85 |
Statewide |
2024-12-11 |
H.016061 |
|
M/V St Francisville - 2025 Uscg Drydock |
Drydock For Uscg Exam and Other Maint & Repairs |
$1,000,000 to $2,500,000 |
0.00 |
Tangipahoa |
2024-12-11 |
H.015309 |
US 51 |
Us 51: 2nd St - La 16 |
Thin Overlay |
$2,500,000 to $5,000,000 |
6.12 |
Terrebonne |
2024-12-11 |
H.012957 |
LA 24 |
La 24: Presque Isle Br Elec Rehab |
Electrical Rehab |
$250,000 to $500,000 |
0.02 |
Union |
2024-12-11 |
H.015234 |
LA 15 |
La 33: Drainage Improvements |
Cross Drain Replacement and Full Depth Asphalt Patch |
$250,000 to $500,000 |
0.10 |
Vermilion |
2024-12-11 |
H.015769 |
LA 3147 |
La 3147: La 82 - Front Ridge Road |
Asphalt Overlay |
$5,000,000 to $7,500,000 |
1.81 |
Vernon |
2024-12-11 |
H.010354 |
LA 111 |
La 111: US 171 - La 117 |
Patch, Cold Plane, and Overlay |
$5,000,000 to $7,500,000 |
8.82 |
West Baton Rouge |
2024-12-11 |
H.015761 |
LA 76, LA 415 |
La 76: La 415 - La 1 |
Patch, Mill, Asphalt Overlay |
$2,500,000 to $5,000,000 |
2.39 |
Ascension, East Baton Rouge, Jefferson, St. John Baptist |
2024-12-20 |
H.015989 |
US 61-X |
Several:kcs & Ic Xings(Batonrouge-newor) |
Upgrade Or Install RR Gates; Look At Closing Cedar St |
$2,500,000 to $5,000,000 |
0.31 |
East Baton Rouge |
2024-12-20 |
H.015948 |
US 61 |
Us 61: Ic RR Surface (Baton Rouge) |
Install New RR Surface |
$500,000 to $1,000,000 |
0.01 |
Iberia |
2024-12-20 |
H.009862 |
|
Caroline St: Bnsf Xing (New Iberia) |
Close Crossing |
$0 to $100,000 |
0.01 |
Iberville |
2024-12-20 |
H.013438 |
LA 993 |
Dorcy, Catherine & La 993 Up (Iberville) |
Install and Upgrade RR Warning Devices |
$1,000,000 to $2,500,000 |
0.03 |
Jefferson |
2024-12-20 |
H.014910 |
|
Central Ave: Nopb RR Xings (Jefferson) |
Upgrade Warning For the Crossings |
$500,000 to $1,000,000 |
0.11 |
Ouachita |
2024-12-20 |
H.012439 |
LA 151 |
Kcs Several RR Xings (Ouachita) |
Rr Signalization |
$500,000 to $1,000,000 |
0.04 |
Plaquemines |
2024-12-20 |
H.015891 |
|
Kenneth & E 3rd St: Nogc Xs(Belle Chase) |
Rr Mast Flashers |
$250,000 to $500,000 |
0.02 |
Pointe Coupee, West Baton Rouge |
2024-12-20 |
H.015133 |
LA 985, LA 416 |
La 416 & La 985: Kcs Xings(District 61) |
Upgrade RR Signals |
$500,000 to $1,000,000 |
0.04 |
Richland |
2024-12-20 |
H.015229 |
|
Sumlin Ranch Rd: Kcs Xing(Richland) |
Close Or Upgrade Crossing |
$250,000 to $500,000 |
0.01 |
LaSalle |
2024-12-31 |
H.012520 |
|
Dewey Wills Wma Year Round Atv Trail |
Restore 4.5 Miles Of Atv Trail and Const. Of Trailhead Park |
$100,000 to $250,000 |
0.00 |
Bossier |
2025-01-08 |
H.015276 |
US 80 |
Us 80: Flat River - Merrywoods Blvd |
Mill, Patch and Overlay |
$2,500,000 to $5,000,000 |
4.72 |
Caddo |
2025-01-08 |
H.015677 |
I-49 |
I-49: Sb Exit Ramp At Southern Loop |
Southbound Right Turn Lane Addition |
$1,000,000 to $2,500,000 |
0.59 |
Iberville |
2025-01-08 |
H.015636 |
I-10 |
I-10: Trinity Drainage Canal Br Repair |
Bridge Repair Due to Vehicle Impact |
$250,000 to $500,000 |
0.02 |
Jackson |
2025-01-08 |
H.015322 |
LA 147 |
La 147: US 167 - Bienville Parish Line |
Microsurfacing, Patch, Mill, and Overlay |
$1,000,000 to $2,500,000 |
4.01 |
Jefferson |
2025-01-08 |
H.014682 |
|
Veterans Blvd: David Dr - Clearview Pkwy |
Mill and Overlay |
$2,500,000 to $5,000,000 |
2.14 |
Lafourche |
2025-01-08 |
H.015799 |
LA 308 |
La 308: 0.2 Mi S Of US 90 - La 182 |
2" Mill and Overlay Of La 308 |
$2,500,000 to $5,000,000 |
2.45 |
Lafourche |
2025-01-08 |
H.015857 |
LA 20, LA 1 |
La 1 & La 20 @ St Patrick Bridge Ped Imp |
Ada Compliant Sidewalks and Curb Ramps |
$0 to $100,000 |
0.07 |
LaSalle |
2025-01-08 |
H.015613 |
US 84 |
Us 84: Up RR Overpass Replacement (Hbi) |
Replacement Of Existing RR Overpass With New Bridge |
$10,000,000 to $15,000,000 |
0.54 |
Livingston |
2025-01-08 |
H.016009 |
LA 43 |
La 43: I-12 - US 190 |
Pcc Rehab, Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
1.83 |
Orleans |
2025-01-08 |
H.014772 |
US 90 |
Us 90: Victory Rd. - Fort Macomb Br. |
Patch, Mill and Overlay |
$2,500,000 to $5,000,000 |
1.90 |
Rapides |
2025-01-08 |
H.015859 |
LA 1208-1 |
La 1208-1 Sidewalk Improvements |
Reconstruction Of Approximately 9,500 Lf Of Sidewalk For Ada |
$250,000 to $500,000 |
1.80 |
Red River |
2025-01-08 |
H.011087 |
|
Westdale Plantation Road / Bayou Pierre |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.03 |
St. Charles |
2025-01-08 |
H.010416 |
LA 3127 |
La 3127 Eastbound: St. John P/L - I-310 |
Mill and Overlay Of Asphalt Pavement and Related Work |
$7,500,000 to $10,000,000 |
10.12 |
St. John Baptist |
2025-01-08 |
H.011515 |
LA 44 |
La 44: Palm St & Beech St Drainage |
Additional Pipe(S), Catch Basins, And/Or Asphalt |
$0 to $100,000 |
1.53 |
St. Mary |
2025-01-08 |
H.015523 |
|
St Mary Parish Movable Br Repairs (Ph 2) |
St. Mary Parish Movable Bridge Repairs |
$1,000,000 to $2,500,000 |
0.30 |
St. Tammany |
2025-01-08 |
H.004957 852-33-0002 |
LA 3241, LA 434 |
La 3241:i-12/La 434 Interchange to La 36 |
New 4-lane |
$100,000,000 to $125,000,000 |
6.38 |
Tangipahoa |
2025-01-08 |
H.016010 |
LA 22 |
La 22: 100' E Olde Mill Ln - Howes Ln |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
1.97 |
Terrebonne |
2025-01-08 |
H.015115 |
LA 24 |
La 24: La 24 Over Icww Repair |
Repair Of Steel Plate Girder |
$1,000,000 to $2,500,000 |
0.73 |
Vermilion |
2025-01-08 |
H.015950 |
LA 694, LA 335 |
La 335: La 35 - E. Jct. La 694 |
Base Rehab & Asphalt Overlay |
$7,500,000 to $10,000,000 |
6.51 |
Acadia |
2025-02-12 |
H.015285 |
LA 755 |
La 755: La 368 - 0.406 Mi Sw Of La 3123 |
Mill, In-place Base Rehab & Overlay |
$5,000,000 to $7,500,000 |
3.60 |
Avoyelles |
2025-02-12 |
H.015543 |
LA 452 |
La 452: Drainage At Caldwell St. |
Drainage Improvements |
$500,000 to $1,000,000 |
0.13 |
Caddo |
2025-02-12 |
H.006474 737-09-0106 |
I-49, LA 526, LA 3132 |
Shreveport Immediate ITS Phase 2b |
Develop Sea For ITS Equipment Deployment |
$1,000,000 to $2,500,000 |
16.24 |
Caddo |
2025-02-12 |
H.014229 |
|
Crawford Road Over Tiger Branch |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Caldwell |
2025-02-12 |
H.014249 |
LA 126 |
La 126: Bridge Creek Bridge |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.09 |
East Baton Rouge |
2025-02-12 |
H.010253 |
|
Bluebonnet Blvd. Pump Stat. Imp |
Upgrade Pump Station and Add Advanced Warning System |
$250,000 to $500,000 |
0.01 |
East Baton Rouge |
2025-02-12 |
H.011859 |
|
Br: River Road Multi-use Corridor |
Sidewalk, Street Scaping |
$100,000 to $250,000 |
0.25 |
East Baton Rouge |
2025-02-12 |
H.012469 |
US 190 |
Us 190: Mrb - Navig Light Repl (Hbi) |
Navigational Lighting System Replacement |
$1,000,000 to $2,500,000 |
1.11 |
East Baton Rouge |
2025-02-12 |
H.015439 |
LA 3034 |
La 3034: Sullivan Rd - La 37 |
Milling, Stabilize, Asphalt Overlay, Drainage Works |
$2,500,000 to $5,000,000 |
2.59 |
East Baton Rouge |
2025-02-12 |
H.016029 |
I-10 |
I-10: I-12 to .75 W Of Highland Pave Mkg |
Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
5.85 |
East Carroll |
2025-02-12 |
H.015236 |
LA 134 |
La 134: Drainage Improvements |
Add Cross Drain, Regrade Ditches and Replace Side Drain |
$100,000 to $250,000 |
0.17 |
East Feliciana |
2025-02-12 |
H.014251 |
LA 422 |
La 422: Bridge Over Unnamed Stream |
Bridge Replacement |
$500,000 to $1,000,000 |
0.29 |
Iberville |
2025-02-12 |
H.013968 |
LA 404 |
La 404: Bayou and Canal Bridges |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.46 |
Jefferson |
2025-02-12 |
H.012594 |
LA 3134 |
La 3134: Intersection Imp @ La 45 |
Add J Turns & U Turns At the Intersection Of La 3134 & La 45 |
$1,000,000 to $2,500,000 |
1.10 |
Jefferson |
2025-02-12 |
H.015120 |
|
Roosevelt Blvd: W Napoleon - W Metairie |
Reconstruct Pavement and Base Of Roosevelt Blvd |
$2,500,000 to $5,000,000 |
1.10 |
Jefferson |
2025-02-12 |
H.015780 |
LA 3152 |
La 3152: Huey P - Airline Dr |
Mill, Overlay, Concrete Patching and Add a Turn Lane |
$2,500,000 to $5,000,000 |
2.03 |
Lafayette |
2025-02-12 |
H.013537 |
LA 93-1 |
La 93: Coulee Ile Des Cannes Bridge |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.06 |
Lincoln |
2025-02-12 |
H.014238 |
LA 818 |
La 818: Barnet Springs & Creek Bridges |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.30 |
Livingston |
2025-02-12 |
H.011014 |
LA 3002 |
La 3002: U-turn |
Add South Bound U-turn For Left Turning Vehicles Exiting Cvs |
$500,000 to $1,000,000 |
0.12 |
Livingston |
2025-02-12 |
H.015102 |
|
Centerville St Nw Improvements |
Mill and Overlay Centerville St Nw and Add Bike Lanes |
$500,000 to $1,000,000 |
0.27 |
Orleans |
2025-02-12 |
H.012370 |
|
Morrison Rd: Mayo Ave - ¦bullard Ave |
Preservation Asphalt Overlay and Related Ada Curb Work |
$20,000,000 to $30,000,000 |
3.38 |
Orleans |
2025-02-12 |
H.014530 |
|
Almonaster Avenue Bridge Rehabilitation |
Movable Bridge Rehabilitation |
$20,000,000 to $30,000,000 |
0.39 |
Orleans |
2025-02-12 |
H.016003 |
LA 611-9 |
Metairie Rd/City Park Ave Under I-10 |
Pcc Pavement Patching, Restriping, and Culvert Repair |
$500,000 to $1,000,000 |
0.04 |
Ouachita |
2025-02-12 |
H.013130 |
|
Red Cut Rd & Charles Rawls Rd Bridges |
Bridge Replacement - No New Alignment |
$2,500,000 to $5,000,000 |
0.03 |
Ouachita |
2025-02-12 |
H.014232 |
|
Ruffin Drive Over Drain to Youngs Bayou |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Ouachita |
2025-02-12 |
H.015265 |
US 165 |
Us 165: Int. Imp. Near Teakwood Dr |
Add Turn Lanes, Remove Crossovers |
$500,000 to $1,000,000 |
0.24 |
Pointe Coupee |
2025-02-12 |
H.015294 |
LA 418 |
La 418: Innis (La 1) - La 15 |
Mill, Base Rehab & Overlay |
$5,000,000 to $7,500,000 |
9.04 |
Rapides |
2025-02-12 |
H.007538 744-40-0022 |
LA 498 |
La 498: England Air Park to La 1 Gateway |
Sidewalks and Landscaping |
$1,000,000 to $2,500,000 |
1.13 |
Rapides |
2025-02-12 |
H.015763 |
US 165 |
Us 165: 260' N Of Lowes Dr - Frontage Rd |
Pcc Patching, Patching, Milling, Overlay |
$500,000 to $1,000,000 |
0.25 |
Richland |
2025-02-12 |
H.014799 |
LA 583 |
La 583: Sumlin Ranch Rd - La 134 |
Asphalt Surface Treatment, Patch, Mill and Overlay |
$2,500,000 to $5,000,000 |
10.47 |
St. Bernard |
2025-02-12 |
H.014643 |
LA 39 |
La 39: W. Judge Perez Dr. Enhancements |
Multi-use Path and New Bike/Ped Facilities |
$500,000 to $1,000,000 |
1.07 |
St. James |
2025-02-12 |
H.015603 |
LA 641 |
La 641: La 641 Over I-10 Bridge Repair |
Repair Of Bridge Damage Due to Over Height Truck |
$500,000 to $1,000,000 |
0.43 |
St. Landry |
2025-02-12 |
H.011993 |
LA 10 |
La 10: Bayou Carron Bridge |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.30 |
St. Landry |
2025-02-12 |
H.015218 |
I-49 |
Grand Prairie Safety Rest Area Lighting |
Replacement Of Existing Rest Area and Parking Area Lighting |
$500,000 to $1,000,000 |
0.62 |
St. Landry |
2025-02-12 |
H.015630 |
I-49 |
I-49: St. Landry Pl to Us-190 Pave Mark |
Replace Pavement Markers and Raised Pavement Markers |
$500,000 to $1,000,000 |
11.36 |
St. Landry |
2025-02-12 |
H.015774 |
LA 359 |
La 359: Local Road (Bolden) - La 10 |
Mill, In-place Base Rehab & Overlay |
$5,000,000 to $7,500,000 |
4.36 |
Statewide |
2025-02-12 |
H.015892 |
|
Barge 305-008 Dry Dock For Repair (2024) |
Drydocking For Repairs, Maintenance, and Painting |
$500,000 to $1,000,000 |
0.00 |
Tangipahoa |
2025-02-12 |
H.015365 |
LA 16 |
La 16: St Helena P/L ? Lm 1.419 |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
1.41 |
Vernon |
2025-02-12 |
H.015958 |
LA 117 |
La 117: Tank Trail Rd Intersection Imp |
Improve Turnouts, Widen Shoulders, Install Advance Warning |
$500,000 to $1,000,000 |
0.25 |
Ascension |
2025-03-12 |
H.013793 |
|
Germany Rd Widening (Us 61 to La 44) |
Widening/Reconstruction |
$2,500,000 to $5,000,000 |
1.99 |
Avoyelles |
2025-03-12 |
H.015784 |
LA 1182, LA 1181 |
La 1181 & La 1182: Asphalt Overlays |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
3.00 |
Bossier |
2025-03-12 |
H.015759 |
LA 3 |
La 3: La 72 to Viking Drive |
Pcc Patching, Cleaning & Resealing Joints |
$2,500,000 to $5,000,000 |
2.80 |
Bossier |
2025-03-12 |
H.016057 |
LA 157, LA 3227 |
La 3227: Intersect Realign @ La 157 Ph 2 |
Roadway Realignment |
$5,000,000 to $7,500,000 |
0.82 |
Calcasieu |
2025-03-12 |
H.015353 |
I-210 |
I-210: Eb Ryan St Exit Modifications |
Ramp Modifications, Fog Seal, Ada Improvements |
$100,000 to $250,000 |
0.54 |
Catahoula, Concordia, Franklin, LaSalle, Tensas |
2025-03-12 |
H.016044 |
US 65, US 425, LA 860, LA 618, LA 577, LA 569, LA 460, LA 3024, LA 135, LA 126 |
D58 Rumble Strips and Striping Ph 1 |
Rumble Strips and Striping |
$1,000,000 to $2,500,000 |
64.53 |
East Baton Rouge |
2025-03-12 |
H.015714 |
I-110 |
I-110: Nb @ Convention St Fire Damage Rp |
Repair Of Bridge Defects Suffered From Fire Damage |
$500,000 to $1,000,000 |
0.10 |
Iberia |
2025-03-12 |
H.010155 |
US 90 |
Us 90 Railroad Overpass Se Of La 85 |
Bridge Overpass Over Railroad |
$50,000,000 to $70,000,000 |
1.07 |
Iberia, St. Martin |
2025-03-12 |
H.015807 |
LA 347 |
La 347: La 86 - 0.405 Mi S Of La 96 |
Scrub Seal & Thin Overlay |
$1,000,000 to $2,500,000 |
5.48 |
Jackson |
2025-03-12 |
H.016050 |
US 167 |
Us 167: Hunt St - La 147 |
Mill and Overlay With Ultra-thin Whitetopping |
$2,500,000 to $5,000,000 |
0.36 |
Jefferson |
2025-03-12 |
H.007181 742-26-0043 |
|
L&a Road Improvements |
New Roadway and Alignment |
$2,500,000 to $5,000,000 |
0.00 |
Jefferson |
2025-03-12 |
H.011805 |
LA 541 |
Jefferson Wb Miss River Mu Path 3b & 3c |
Multi-use Path |
$500,000 to $1,000,000 |
0.23 |
Jefferson |
2025-03-12 |
H.015004 |
LA 3139 |
La 3139: Eb Ramp Ov La 3152 Nb Repair |
Repair Of Pretressed Concrete Girders |
$500,000 to $1,000,000 |
0.17 |
Lincoln |
2025-03-12 |
H.011627 |
I-20 |
I-20: Bienville P/L - 0.71 Mile W La 149 |
Asphalt Overlay Of Asphalt Pavement |
$15,000,000 to $20,000,000 |
9.22 |
Morehouse |
2025-03-12 |
H.015321 |
LA 830-3 |
La 830-3: US 165 - US 425 |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
3.58 |
Natchitoches |
2025-03-12 |
H.010359 |
LA 9 |
La 9: US 71 - La 156 |
Med Overlay |
$2,500,000 to $5,000,000 |
6.81 |
Natchitoches |
2025-03-12 |
H.014864 |
LA 486 |
La 486: La 480 - US 71 North |
Base and Overlay |
$250,000 to $500,000 |
0.91 |
Orleans |
2025-03-12 |
H.016002 |
LA 428 |
La 428: Behrman Ave - Holiday Dr |
Mill, Overlay, and Patching |
$2,500,000 to $5,000,000 |
1.58 |
Ouachita |
2025-03-12 |
H.015246 |
LA 840-6 |
La 840-6: Hudson Ln - Bayou Desiard |
Patch, Clean, Reseal Joints and Cracks In Jcp |
$2,500,000 to $5,000,000 |
2.63 |
Rapides |
2025-03-12 |
H.015272 |
US 165 |
Us 165: Intersection Improvements |
Add and Improve Turn Lanes |
$500,000 to $1,000,000 |
0.35 |
Rapides |
2025-03-12 |
H.015292 |
LA 1200 |
La 1200: La 121 - La 1 |
Asphalt Overlay |
$1,000,000 to $2,500,000 |
4.20 |
St. Bernard |
2025-03-12 |
H.011800 |
|
St. Bernard Miss River Trail Ph Iii |
Shared Use Path On Levee Top |
$1,000,000 to $2,500,000 |
0.00 |
St. Charles |
2025-03-12 |
H.014899 |
I-10 |
I-10: Bonnet Carre Spillway Emer Re Ph 2 |
Repair/Replace Bridge Section Damaged By Fire |
$2,500,000 to $5,000,000 |
0.50 |
St. James |
2025-03-12 |
H.014086 |
US 61 |
Us 61: St. John Pl - Ascension Pl |
Mill & Overlay and Add Left Turn Lane At La 641 |
$10,000,000 to $15,000,000 |
8.83 |
St. James |
2025-03-12 |
H.014416 |
LA 3125, LA 3274 |
La 3125 @ La 3274 Roundabout |
Construct a Roundabout, Mill and Overlay |
$10,000,000 to $15,000,000 |
0.52 |
St. Martin |
2025-03-12 |
H.014826 |
LA 336-1, LA 347 |
La 347: La 351 - La 328 |
Mill, In-place Base Rehab, Overlay and Drainage Improvements |
$2,500,000 to $5,000,000 |
2.98 |
St. Tammany |
2025-03-12 |
H.014737 |
|
Signal Upgrade:sgt Alfred Dr @ Cleveland |
Replace Traffic Signal, Upgrade Sidewalks and Striping |
$250,000 to $500,000 |
0.01 |
St. Tammany, Tangipahoa |
2025-03-12 |
H.015109 |
LA 1090, LA 3234, LA 22, LA 21, LA 1091, US 51-X, US 51, US 190, US 11, LA 59 |
Access Mgmt Impr Tangipahoa/St Tammany |
Intersection Improvements |
$500,000 to $1,000,000 |
0.99 |
Tangipahoa |
2025-03-12 |
H.010289 |
LA 22 |
La 22: Roundabout Dunson/Ridgedell Rds. |
Construct Roundabout @ La 22/Dunson/Ridgedell |
$1,000,000 to $2,500,000 |
0.37 |
Tangipahoa |
2025-03-12 |
H.011519 |
LA 1063 |
La 1063: Glendale Dr - US 51 Drainage |
Additional Pipe(S), Catch Basins, And/Or Asphalt |
$100,000 to $250,000 |
0.30 |
Terrebonne |
2025-03-12 |
H.012949 |
LA 315 |
Dularge Br Lock Bar Rehabilitation |
Movable Bridge Machinery Repairs |
$100,000 to $250,000 |
0.43 |
Terrebonne |
2025-03-12 |
H.013199 |
|
Country Estates Dr Over St. Louis Bayou |
Bridge Replacement - No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Washington |
2025-03-12 |
H.014846 |
LA 424 |
La 424: Johnny Martin Rd - La 62 |
Base Rehabilitation and Asphalt Overlay |
$2,500,000 to $5,000,000 |
2.67 |
Madison |
2025-03-31 |
H.016178 |
I-20 |
I-20: Wb Delta Weigh In Motion Rehab |
Rehab Of Weigh-in-motion System |
$500,000 to $1,000,000 |
0.03 |
St. John Baptist |
2025-03-31 |
H.016170 |
I-10 |
I-10: Eb Laplace Weigh In Motion Rehab |
Rehab Of Weigh-in-motion System |
$500,000 to $1,000,000 |
0.05 |
St. John Baptist |
2025-03-31 |
H.016171 |
I-10 |
I-10: Eb Laplace Static Scale Rehab |
Rehab Of Static Pit Scale |
$500,000 to $1,000,000 |
0.02 |
St. John Baptist |
2025-03-31 |
H.016173 |
I-10 |
I-10: Wb Laplace Weigh In Motion Rehab |
Rehab Of Weigh-in-motion System |
$500,000 to $1,000,000 |
0.05 |
St. Martin |
2025-03-31 |
H.016174 |
I-10 |
I10: Eb Breaux Bridge Static Scale Rehab |
Rehab Of Static Pit Scale |
$500,000 to $1,000,000 |
0.03 |
St. Martin |
2025-03-31 |
H.016175 |
I-10 |
I10: Wb Breaux Bridge Static Scale Rehab |
Rehab Of Static Pit Scale |
$500,000 to $1,000,000 |
0.03 |
East Baton Rouge |
2025-04-01 |
H.016074 |
|
Kcs 2016 Fra Step (Baton Rouge) |
Install/Upgrade Active Warning Devices |
$1,000,000 to $2,500,000 |
0.08 |
Caddo |
2025-04-09 |
H.014082 |
US 171 |
Us 171: La 3132 to US 80 |
Mill, Patch, and Overlay |
$2,500,000 to $5,000,000 |
4.61 |
Franklin |
2025-04-09 |
H.014881 |
US 425 |
Us 425: Winnsboro - Baskin |
Mill & Overlay |
$1,000,000 to $2,500,000 |
3.55 |
Jackson |
2025-04-09 |
H.001553 068-02-0017 |
LA 146, LA 4 |
La 146 Bridges Near Kelleys |
Replace 5 Timber Bridges With 4 Slab Bridges & 1 Rcb Culvert |
$10,000,000 to $15,000,000 |
6.85 |
Jefferson |
2025-04-09 |
H.014773 |
LA 611-9 |
La 611-9: US 61 - Orleans P/L |
Patch, Mill and Overlay |
$2,500,000 to $5,000,000 |
2.91 |
Jefferson |
2025-04-09 |
H.015910 |
US 90 |
Us90: Hp Long Bridge (No)-joint Repairs |
Finger Joint Repairs |
$1,000,000 to $2,500,000 |
1.95 |
Lafayette, Vermilion |
2025-04-09 |
H.016000 |
LA 342, LA 35 |
La 35 & La 342: Road Improvements |
Base Rehabilitation and Asphalt Overlay |
$5,000,000 to $7,500,000 |
3.84 |
Lafourche |
2025-04-09 |
H.014270 |
|
Lefort Bypass Road Over Cut Off Bayou |
Bridge Replacement, No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Livingston, St. Tammany, Tangipahoa |
2025-04-09 |
H.015691 |
LA 1077, LA 40, LA 16 |
Dist 62: Wet Reflective Pave Mark Eval |
Pavement Striping and Raised Pavement Markers |
$250,000 to $500,000 |
9.74 |
Natchitoches |
2025-04-09 |
H.013821 |
LA 6 |
La 6: Youngs Bayou Bridges |
Bridge Repair |
$1,000,000 to $2,500,000 |
0.30 |
Ouachita |
2025-04-09 |
H.008230 837-14-0009 |
LA 838 |
La 838: Steep Bayou Bridge Replacement |
New Bridge |
$2,500,000 to $5,000,000 |
0.29 |
Ouachita |
2025-04-09 |
H.015205 |
|
Mcmillan Rd Ped Impr (W Mon) |
Sidewalk, Curb Ramps, Signage and Related Work |
$500,000 to $1,000,000 |
0.49 |
St. Helena |
2025-04-09 |
H.014115 |
LA 448 |
La 448: La 37 - La 10 |
Mill & Overlay |
$5,000,000 to $7,500,000 |
8.59 |
St. Tammany |
2025-04-09 |
H.016042 |
I-59, I-12, I-10 |
I-10/I-12/I-59: Signs & Pvmt Markings |
Permanent Signs, Pavement Markings & Related Work |
$2,500,000 to $5,000,000 |
11.57 |
Statewide |
2025-04-09 |
H.016062 |
|
Barge 305-069 - 2025 Drydock |
Drydock For Exam and Other Maint & Repairs |
$500,000 to $1,000,000 |
0.00 |
Terrebonne |
2025-04-09 |
H.010411 |
LA 24 |
La 24: La 55 - Prospect Street Bridge |
Patch, Mill & Overlay |
$5,000,000 to $7,500,000 |
7.07 |
Terrebonne |
2025-04-09 |
H.014843 |
LA 182, LA 659, LA 24 |
La 24: La 661 - La 664 |
Mill and Overlay |
$5,000,000 to $7,500,000 |
3.13 |
Terrebonne |
2025-04-09 |
H.015804 |
LA 315 |
La 315: Tommy Darcey Br - Henry Clay Dr |
2" Mill and Overlay Of Asphalt Pavement |
$1,000,000 to $2,500,000 |
1.82 |
Terrebonne |
2025-04-09 |
H.015834 |
LA 57 |
La 57: La 24 - Oaklawn Dr |
Mill and Overlay |
$5,000,000 to $7,500,000 |
1.92 |
Washington |
2025-04-09 |
H.014852 |
LA 21 |
La 21: Lm 0.264 - Bogalusa Cl |
Mill, Patch, Overlay |
$10,000,000 to $15,000,000 |
6.38 |
West Baton Rouge |
2025-04-09 |
H.015767 |
LA 1 |
La 1: Intracoastal Br - US 190 Wb |
Pcc Patching, Patching, Milling, Overlay |
$10,000,000 to $15,000,000 |
5.97 |
West Carroll |
2025-04-09 |
H.015320 |
LA 134 |
La 134: La 17 - Alligator Bayou Bridge |
Thin Lift Overlay With Limited Full Depth Patching |
$1,000,000 to $2,500,000 |
3.09 |
Washington |
2025-05-01 |
H.015061 |
LA 1073, LA 1070 |
La 1070 & La 1073: Washington Parish Rt |
Provide $1,966,681 In Funds to Washington Parish |
$1,000,000 to $2,500,000 |
4.50 |
Bienville, Webster |
2025-05-14 |
H.016031 |
I-20 |
I-20: La 371 to La 154 Pave Mkgs |
Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
13.19 |
Caddo |
2025-05-14 |
H.016059 |
LA 530 |
La 530: La 538 to I-49 |
Stabilize and Overlay |
$5,000,000 to $7,500,000 |
5.38 |
Claiborne |
2025-05-14 |
H.015611 |
LA 540 |
La 540: Drain Bridge |
Replacement Of Existing Bridge With a Concrete Box Culvert |
$500,000 to $1,000,000 |
0.50 |
District 04 |
2025-05-14 |
H.009052 |
|
I-20: Pavement Marking Replacement Ix |
Plastic Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
0.00 |
Jefferson |
2025-05-14 |
H.004359 826-44-0027 |
LA 3154 |
Hickory (La 48 - Mounes) |
Relocation and 4-laning |
$7,500,000 to $10,000,000 |
1.07 |
Lafayette |
2025-05-14 |
H.011992 |
LA 343 |
La 343: Bayou Queue De Tortue Bridge |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.10 |
Orleans |
2025-05-14 |
H.014064 |
I-10 |
I-10: Franklin Ave - I-510 |
Milling and Overlay W/ Asphalt Concrete & Add Cable Barrier |
$7,500,000 to $10,000,000 |
8.89 |
St. Helena |
2025-05-14 |
H.014141 |
LA 43 |
La 43: Drainage Improvements |
Addition Of Cross Drain and Upsizing Culverts |
$0 to $100,000 |
0.50 |
St. Landry |
2025-05-14 |
H.015929 |
LA 343 |
La 343: La 98 - La 356 |
Mill, Base Rehabilitation, Asphalt Overlay |
$5,000,000 to $7,500,000 |
5.18 |
Statewide |
2025-05-14 |
H.016172 |
|
M/V Belle Chase II 2025 Uscg Drydock |
Drydock For Uscg Exam and Other Maint & Repairs |
$500,000 to $1,000,000 |
0.00 |
Tangipahoa |
2025-05-14 |
H.016149 |
I-55 |
I-55: La 1049 Opass-ms St Line |
Mill and Overlay |
$5,000,000 to $7,500,000 |
5.36 |
Tangipahoa |
2025-05-14 |
H.016150 |
I-55 |
I-55: La 1050 Opass - La 1049 Opass |
Mill and Overlay |
$2,500,000 to $5,000,000 |
2.58 |
Terrebonne |
2025-05-14 |
H.015754 |
LA 3040 |
La 3040: Right Turn Lane @ Westside |
Add a Right Turn Lane |
$250,000 to $500,000 |
0.12 |
St. John Baptist |
2025-06-01 |
H.015238 |
|
Garyville Ped-bike-transit Trailhead |
Construction Of a Ped/Bike/Transit Trailhead |
$100,000 to $250,000 |
0.00 |
Acadia |
2025-06-11 |
H.015618 |
LA 13 |
La13:0.2 Mi N Verm P/L ? 1.023 Mi N La92 |
Patch, Mill, and Overlay |
$5,000,000 to $7,500,000 |
3.87 |
Acadia |
2025-06-11 |
H.015954 |
LA 1100, LA 95 |
La 95 & La 1100: La 98 - La 365 |
Base Rehabilitation & Asphalt Overlay |
$7,500,000 to $10,000,000 |
5.71 |
Acadia |
2025-06-11 |
H.016056 |
LA 95 |
La 95: La 98 ? La 365 |
Partial Rehabilitation, Patch, Mill, & Overlay |
$5,000,000 to $7,500,000 |
3.60 |
Ascension |
2025-06-11 |
H.015530 |
|
Devall Road Over Drainage Ditch |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
Catahoula |
2025-06-11 |
H.012842 |
LA 124-P |
La124 Extension Near Larto (Seg 2&3) |
New Roadway Construction/Re-construction, Bridge Replacement |
$7,500,000 to $10,000,000 |
4.34 |
East Baton Rouge |
2025-06-11 |
H.014281 |
US 190 |
Us 190: Miss River Br Repair Ph. 3 (Hbi) |
Repair Of Stringer Connections and Finger Joints |
$7,500,000 to $10,000,000 |
1.11 |
East Baton Rouge |
2025-06-11 |
H.015526 |
LA 3164 |
Chippewa St Pump Station Imp Phase 1 |
Lights, Gates and Signage to Warn Travelers Of High Water |
$100,000 to $250,000 |
0.42 |
Evangeline |
2025-06-11 |
H.016054 |
LA 13 |
La 13: La 10 - US 167 |
Patch, Mill, and Overlay |
$10,000,000 to $15,000,000 |
12.80 |
Iberia |
2025-06-11 |
H.015813 |
LA 14 |
La 14 (Wb): Jeff Island Rd - US 90 |
Pccp Minor Rehab (Saw & Seal Joints) |
$1,000,000 to $2,500,000 |
7.94 |
Iberia |
2025-06-11 |
H.016055 |
LA 83 |
La 83: US 90 - Darnall Road |
Milling, Base Rehabilitation, Asphalt Overlay |
$7,500,000 to $10,000,000 |
4.59 |
Iberia, Lafayette, St. Martin |
2025-06-11 |
H.015273 |
US 90 |
Us 90: La 92 - La 14 |
Hdpfi, PCCP Rehab, and Asphalt Shoulders |
$20,000,000 to $30,000,000 |
9.95 |
Iberville |
2025-06-11 |
H.013243 |
LA 997 |
Byu Pigeon Pontoon Br Elec Winches (Hbi) |
Movable Bridge Machinery Repairs |
$500,000 to $1,000,000 |
0.06 |
Jefferson |
2025-06-11 |
H.014581 |
LA 3017 |
Peters Road Bridge & Extension Phase 2a |
Install Box Culvert In Murphy Canal and Build Access Rd |
$10,000,000 to $15,000,000 |
0.46 |
Jefferson |
2025-06-11 |
H.014776 |
LA 45 |
La 45: Marie Ct. to 2nd St |
Patch, Mill, Overlay, and Raising Roadway Grade |
$2,500,000 to $5,000,000 |
4.30 |
Natchitoches |
2025-06-11 |
H.015125 |
LA 495 |
La 495: Slide and Roadway Repair |
Curve Realignment |
$1,000,000 to $2,500,000 |
1.36 |
Orleans |
2025-06-11 |
H.016043 |
US 90 |
Us 90 (Claiborne) @ Audubon Bl: Int Impr |
Two Channelized Left Turn Lanes and Single Sidewalk |
$250,000 to $500,000 |
0.16 |
Ouachita |
2025-06-11 |
H.007300 742-37-0028 |
LA 594, I-20 |
Kansas-garrett Conn. & I20 Improvements |
Rd Connector & Interchange Imprvmnt |
$30,000,000 to $50,000,000 |
2.16 |
Ouachita |
2025-06-11 |
H.014398 |
|
Caples Road: Marion Sims Rd - La 3033 |
Rehabilitation |
$2,500,000 to $5,000,000 |
2.31 |
Ouachita |
2025-06-11 |
H.015052 |
I-20 |
I-20: Widening/Ovrly(W. Of Well Rd-la34) |
Interstate Widening, Concrete Median Barrier, Mill/Overlay |
$50,000,000 to $70,000,000 |
3.93 |
Rapides |
2025-06-11 |
H.014255 |
|
Beeson Road Over Flagon Bayou Tributary |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.02 |
St. James |
2025-06-11 |
H.009724 |
|
St James Miss Ebank Multi-use Trail Ph 1 |
Multi-use Path and Related Work |
$1,000,000 to $2,500,000 |
0.00 |
St. Landry |
2025-06-11 |
H.016119 |
LA 178 |
La 178: W. Jct. La 182 - E. Jct. La 182 |
Mill, In-place Base Rehab, & Overlay |
$2,500,000 to $5,000,000 |
2.46 |
St. Martin |
2025-06-11 |
H.012130 |
LA 347 |
La 347: La 355 - La 686 |
Cold Plane, Patch, Overlay, & Related Work |
$2,500,000 to $5,000,000 |
6.27 |
St. Martin |
2025-06-11 |
H.014226 |
|
Auguillard Road Over Coulee |
Bridge Replacement No New Alignment |
$250,000 to $500,000 |
0.00 |
St. Martin |
2025-06-11 |
H.016052 |
LA 96 |
La 96: 0.12 Mi. East Of La 347 - La 352 |
Patch, Mill, Overlay |
$10,000,000 to $15,000,000 |
11.53 |
St. Mary |
2025-06-11 |
H.014640 |
|
Local Road Signing & Striping (St. Mary) |
Signing, Striping, and Pavement Markers |
$1,000,000 to $2,500,000 |
26.56 |
Statewide |
2025-06-11 |
H.016063 |
|
M/V Ross a Grand - 2025 Uscg Drydock |
Drydock For Uscg Exam and Other Maint & Repairs |
$500,000 to $1,000,000 |
0.00 |
Terrebonne |
2025-06-11 |
H.013319 |
|
Williams Ave Shared Use Path (Houma) |
Shared Use Path |
$100,000 to $250,000 |
0.59 |
Vermilion |
2025-06-11 |
H.016011 |
LA 699 |
La 699: La 35 - La 343 |
Base Rehabiliation & Asphalt Overlay |
$7,500,000 to $10,000,000 |
5.51 |
West Baton Rouge |
2025-06-11 |
H.012587 |
I-10 |
I-10: W End Of Br 290 - W End Of La 415 |
Grade Raising |
$20,000,000 to $30,000,000 |
4.79 |
West Carroll |
2025-06-11 |
H.014239 |
LA 589 |
La 589: Alligator Bayou Bridge |
Bridge Replacement |
$500,000 to $1,000,000 |
0.01 |
Ascension |
2025-06-30 |
H.014634 |
LA 22 |
La 22: Ic RR Xing (Ascension) |
Replace Railroad Crossing Surface |
$0 to $100,000 |
0.01 |
Beauregard |
2025-06-30 |
H.014636 |
LA 3226 |
La 3226: Kcs RR Xing (Beauregard) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
Bossier |
2025-06-30 |
H.015474 |
LA 72 |
La 72: Kcs RR Xing (Bossier City) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
DeSoto |
2025-06-30 |
H.014574 |
US 171 |
Us 171: Kcs RR Xing (Mansfield) |
Replace Crossing Surface |
$100,000 to $250,000 |
0.01 |
East Baton Rouge |
2025-06-30 |
H.014632 |
LA 3164 |
La 3164: Ic RR Xing (Baton Rouge) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
East Baton Rouge |
2025-06-30 |
H.014897 |
|
Thomas & Leisure Rd: Ic RR Xings (Ebr) |
Install Upgraded RR Signs |
$0 to $100,000 |
0.10 |
East Baton Rouge |
2025-06-30 |
H.015145 |
|
Kcs Several RR Xings (Scotlandville) |
Rr Signal Upgrades and Closure |
$1,000,000 to $2,500,000 |
0.05 |
Jefferson |
2025-06-30 |
H.009884 |
|
Several Nogc Xings(Gretna) |
Rr Crossing Enhancement |
$250,000 to $500,000 |
0.01 |
Jefferson |
2025-06-30 |
H.013825 |
|
Nopb RR Xings (Jefferson Parish) |
Install RR Active Warning |
$250,000 to $500,000 |
0.02 |
Jefferson |
2025-06-30 |
H.015392 |
LA 18 |
La 18: Up Xing (Westwego) - 797870d |
Upgrade RR Crossing Surface |
$250,000 to $500,000 |
0.01 |
Natchitoches |
2025-06-30 |
H.015071 |
LA 6 |
La 6: Kcs RR Xing (Clarence) |
Replace Railroad Crossing Surface |
$250,000 to $500,000 |
0.01 |
Ouachita |
2025-06-30 |
H.015937 |
|
Cheniere Bapt Church: Kcs Xg(Ouachita) |
Install RR Warning Devices |
$250,000 to $500,000 |
0.01 |
Allen |
2025-07-01 |
H.015996 |
|
Oberlin Gateway Trail |
Construction Of New Asphalt Path |
$250,000 to $500,000 |
0.38 |
Assumption |
2025-07-01 |
H.015992 |
LA 70 |
Belle River Museum Trail |
Construction Of Recreational Trail |
$250,000 to $500,000 |
0.04 |
Concordia |
2025-07-01 |
H.015995 |
LA 15 |
Yancey Wma- Crouch and Zeek Trails |
Repair Of Recreational Trail |
$100,000 to $250,000 |
2.33 |
East Baton Rouge |
2025-07-01 |
H.015987 |
|
Isabel Herson Trail |
Construction Of Asphalt Multi-use Path |
$250,000 to $500,000 |
0.07 |
LaSalle |
2025-07-01 |
H.015994 |
|
Dewey Wills Wma- F-lease Trail |
Repair Of Recreational Trail |
$100,000 to $250,000 |
0.86 |
Ouachita |
2025-07-01 |
H.015993 |
|
Russell Sage Wma- Zemones Trail |
Repair Of Recreational Trail |
$100,000 to $250,000 |
0.07 |
Terrebonne |
2025-07-01 |
H.015991 |
|
Bayou Terrebonne Trailhead |
Construction Of Paddle Boat Trailhead |
$100,000 to $250,000 |
0.01 |
West Feliciana |
2025-07-01 |
H.015240 |
|
West Feliciana Hospital Trail |
Construction Of 4,325 Lf Of Pedestrian Trail |
$250,000 to $500,000 |
0.00 |
West Feliciana |
2025-07-01 |
H.015997 |
|
Joseph Mason Trail |
Construction Of a Recreational Trail |
$100,000 to $250,000 |
0.09 |
Ascension |
2025-07-09 |
H.013850 |
|
Duplessis Rd Widening (Us 61 - La 73) |
Minor Widening |
$5,000,000 to $7,500,000 |
1.65 |
Avoyelles |
2025-07-09 |
H.014273 |
|
Monroe Fabre Over Bayou Des Glaises |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.02 |
Beauregard |
2025-07-09 |
H.014800 |
LA 27 |
La 27: White Acres Rd - La 110 |
Microsurfacing |
$500,000 to $1,000,000 |
4.05 |
Bienville, DeSoto, Red River |
2025-07-09 |
H.016154 |
LA 4, LA 177, US 371 |
District 04 Overlays: Southern Parishes |
District Wide Overlay Project |
$2,500,000 to $5,000,000 |
7.53 |
Bossier |
2025-07-09 |
H.014217 |
LA 537 |
La 537: Bridges Near Plain Dealing |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.50 |
Bossier, Caddo |
2025-07-09 |
H.016100 |
LA 511, US 80, LA 789, LA 614 |
District 04 Overlays: Northern Parishes |
District Wide Overlay Project |
$1,000,000 to $2,500,000 |
6.13 |
Caddo |
2025-07-09 |
H.014411 |
|
Linwood Avenue Reconstruction-phase Iv |
Roadway Reconstruction - Joint and Panel Repair |
$10,000,000 to $15,000,000 |
1.00 |
Caddo |
2025-07-09 |
H.015824 |
LA 3132 |
La 3132: I-20 to La 523 |
Pcc Patching,Cleaning/Resealing Joints, Asphalt Shoulder Isp |
$7,500,000 to $10,000,000 |
10.27 |
Calcasieu |
2025-07-09 |
H.009455 |
I-210 |
I-210 Bridge Cleaning & Painting |
Cleaning & Painting |
$2,500,000 to $5,000,000 |
0.18 |
Calcasieu |
2025-07-09 |
H.012052 |
LA 3092 |
La3092: Gauthier Rd @ Lake St Roundabout |
Construct Roundabout |
$2,500,000 to $5,000,000 |
0.47 |
Calcasieu |
2025-07-09 |
H.014782 |
LA 27 |
La 27: La 397 - La 14 |
Microsurfacing |
$500,000 to $1,000,000 |
3.94 |
Calcasieu |
2025-07-09 |
H.016001 |
LA 1256 |
La 1256 @ Patch St/W. Cal Blvd Int Impr |
Minor Widening, Raised Median Curb & Convert Riro Approach |
$500,000 to $1,000,000 |
0.09 |
Calcasieu |
2025-07-09 |
H.016103 |
LA 14 |
La 14: La 397 - Gerstner Memorial |
Structural Overlay |
$2,500,000 to $5,000,000 |
3.05 |
Calcasieu |
2025-07-09 |
H.016236 |
I-10 |
I-10: N Frontage Rd At La 3063 |
Microsurface |
$100,000 to $250,000 |
0.19 |
Caldwell |
2025-07-09 |
H.013202 |
US 165 |
Us 165: La 4 - Union Pacific Overpass |
Mill & Overlay |
$5,000,000 to $7,500,000 |
7.02 |
Claiborne |
2025-07-09 |
H.015875 |
LA 9 |
La 9: Bienville Pl to La 518 |
Asphaltic Concrete Pavement Resurfacing |
$2,500,000 to $5,000,000 |
6.14 |
District 61 |
2025-07-09 |
H.013096 |
|
Dist. 61 Hurricane Protection Screens |
Retrofit Existing Windows to 21 Buildings In District 61 |
$500,000 to $1,000,000 |
0.00 |
East Baton Rouge |
2025-07-09 |
H.010729 |
US 61-X, LA 67 |
Traffic Signal Coord & Synch Ph Vi (Ebr) |
Traffic Signal Coordination & Synchronization |
$2,500,000 to $5,000,000 |
5.83 |
East Baton Rouge |
2025-07-09 |
H.011543 |
LA 37, LA 3164, US 61-X, US 61, LA 408 |
Traffic Signal Coord & Synch Ph Vii(Ebr) |
Traffic Signal Coordination and Signal Synchronization |
$7,500,000 to $10,000,000 |
8.27 |
East Baton Rouge |
2025-07-09 |
H.014171 |
LA 30 |
La 30(Nicholson Dr) Clearing & Grubbing |
Clearing and Grubbing |
$100,000 to $250,000 |
1.20 |
East Baton Rouge |
2025-07-09 |
H.014318 |
|
Gurney Road Bridges |
Bridge Replacment No New Alignement |
$1,000,000 to $2,500,000 |
0.71 |
East Baton Rouge |
2025-07-09 |
H.015547 |
|
Alphonse Forbes Road Over Drainage Bayou |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
East Baton Rouge |
2025-07-09 |
H.015548 |
|
E Flanacher Road Over Drainage Bayou |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
East Baton Rouge |
2025-07-09 |
H.015956 |
LA 19 |
La 19: Turn Lanes @ New Rafe Mayer Rd |
Add Nb and Sb Left Turn Lanes On La 19 @ New Rafe Mayer Rd |
$1,000,000 to $2,500,000 |
0.22 |
East Feliciana |
2025-07-09 |
H.012995 |
LA 67 |
La 67: La 10 - La 432 |
Mill, Stabilize, Overlay |
$5,000,000 to $7,500,000 |
7.70 |
East Feliciana |
2025-07-09 |
H.015311 |
LA 67 |
La 67: Culvert Replacement (Clinton) |
Drainage Upgrades, Asphalt Overlay |
$250,000 to $500,000 |
0.05 |
Grant |
2025-07-09 |
H.015291 |
LA 158 |
La 158: La 8 - US 71 |
Patch, Mill & Overlay |
$1,000,000 to $2,500,000 |
2.54 |
Iberia |
2025-07-09 |
H.013140 |
|
Eighty Arpent Road Over Unnamed Coulee |
Bridge Replacement - No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Iberia, Vermilion |
2025-07-09 |
H.015874 |
LA 14 |
La 14: 0.862 Mi W La 89 - Delcambre Br. |
Mill, Patch, and Overlay |
$1,000,000 to $2,500,000 |
1.75 |
Jefferson |
2025-07-09 |
H.002956 430-01-0020 |
LA 3139 |
Earhart At Dakin |
Ramp Connector (Eb Earhart - Dakin) |
$2,500,000 to $5,000,000 |
0.01 |
Jefferson |
2025-07-09 |
H.007214 742-26-0080 |
|
East Ames Boulevard Improvements |
Widen From 2 to 3 Lanes |
$7,500,000 to $10,000,000 |
0.00 |
Jefferson |
2025-07-09 |
H.014316 |
|
Lapalco Blvd:tanglewood to Victory Ph 2 |
Widen to 4 Lanes |
$10,000,000 to $15,000,000 |
0.63 |
Jefferson Davis |
2025-07-09 |
H.014149 |
LA 101 |
La 101: La 383 - US 165 |
Thin Overlay |
$500,000 to $1,000,000 |
3.21 |
Jefferson Davis |
2025-07-09 |
H.015876 |
LA 14, LA 380 |
La 380: La 14 - La 26 |
Patch, Mill, and Overlay |
$500,000 to $1,000,000 |
1.12 |
Lafayette |
2025-07-09 |
H.012866 |
LA 3025 |
South College Rd (La 3025) Sidewalks |
Construct Sidewalks |
$500,000 to $1,000,000 |
1.63 |
Lafayette |
2025-07-09 |
H.012914 |
LA 3073 |
La 3073: Ambassador @ Verot-chemin-bonin |
Extending Turn Lanes |
$1,000,000 to $2,500,000 |
1.35 |
Lafayette |
2025-07-09 |
H.014337 |
|
Acadian Hills Lane Over Drainage Canal |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Lafayette |
2025-07-09 |
H.014842 |
LA 3184 |
La 3184: La 3025 - I-10 |
Concrete Pavement Rehab, Asphalt Shoulders & Related Work |
$2,500,000 to $5,000,000 |
2.28 |
Lafourche |
2025-07-09 |
H.014769 |
LA 3161 |
La 3161: Hwy 3235 - W Main St |
Mill and Overlay Of Asphalt Pavement |
$500,000 to $1,000,000 |
0.71 |
LaSalle, Winn |
2025-07-09 |
H.012048 |
US 84 |
Us 84: Castor Creek and Relief Bridges |
Bridge Replacements |
$30,000,000 to $50,000,000 |
0.91 |
Livingston |
2025-07-09 |
H.015163 |
|
Aydell Lane Bridge Replacement |
Replace Aydell Ln Structure W/ Box Culvert/Concrete Bridge |
$500,000 to $1,000,000 |
0.02 |
Natchitoches |
2025-07-09 |
H.010346 |
LA 487 |
La 487: La 120 - La 174 |
Patch, Cold Plane, and Overlay |
$2,500,000 to $5,000,000 |
9.99 |
Orleans |
2025-07-09 |
H.013719 |
US 61 |
Us 61 @ I-10 Eb Off Ramp Ped Impr (No) |
Ped Improvements: Sidewalks, Signals, Striping |
$1,000,000 to $2,500,000 |
0.12 |
Orleans |
2025-07-09 |
H.014065 |
I-610 |
I-610: Orleans P/L - Franklin Ave |
Milling and Overlay With Asphalt Concrete |
$5,000,000 to $7,500,000 |
4.91 |
Ouachita |
2025-07-09 |
H.013122 |
|
Pine St. & Harrison/Collier Bridges |
Bridge Replacement - No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Ouachita |
2025-07-09 |
H.014350 |
|
Old Natchitoches Rd: Thomas - Stella |
Rehabilitation |
$1,000,000 to $2,500,000 |
0.94 |
Ouachita |
2025-07-09 |
H.014679 |
|
Kiroli Rd Sidewalks and Striping |
Repair/Widen Sidewalks and Restriping Kiroli Rd |
$250,000 to $500,000 |
1.06 |
Ouachita |
2025-07-09 |
H.015660 |
|
Trenton Street Shared-use Path |
Shared-use Path |
$2,500,000 to $5,000,000 |
1.56 |
Rapides |
2025-07-09 |
H.015633 |
|
Coa Asphaltic Rehab Phase Iii |
Asphalt Resurfacing |
$2,500,000 to $5,000,000 |
4.61 |
Sabine |
2025-07-09 |
H.015328 |
LA 120 |
La 120: US 171 - Angela Lane |
In Place Stabilization and Overlay |
$1,000,000 to $2,500,000 |
1.82 |
St. James, St. John Baptist |
2025-07-09 |
H.012066 |
LA 3213 |
La 3213: Gramercy Bridge Rehabilitation |
Major Bridge Rehabilitation |
$50,000,000 to $70,000,000 |
1.48 |
St. John Baptist |
2025-07-09 |
H.010385 |
LA 3127 |
La 3127: St. James P/L - St. Charles P/L |
Cold Plane & Overlay |
$5,000,000 to $7,500,000 |
8.87 |
St. Landry |
2025-07-09 |
H.013811 |
LA 104 |
La 104: 2.6 Mi Nw US 190 - US 190 |
Mill, Base Stabilization, and Overlay |
$5,000,000 to $7,500,000 |
2.58 |
St. Landry |
2025-07-09 |
H.014633 |
LA 29 |
La 29: Bayou Cocodrie Bridges Scour Re |
Abutment Scour Mitigation |
$1,000,000 to $2,500,000 |
0.10 |
St. Landry |
2025-07-09 |
H.016036 |
US 190 |
Us 190: Atchafalaya Fldwy Repairs |
Bridge Repairs |
$250,000 to $500,000 |
0.75 |
St. Martin |
2025-07-09 |
H.016143 |
LA 349 |
La 349: La 347 - La 352 |
Scrub Seal & Thin Overlay |
$1,000,000 to $2,500,000 |
3.43 |
Tangipahoa |
2025-07-09 |
H.016065 |
|
District 62 Flashing Yellow Arrow Part 2 |
Traffic Signal Improvement |
$7,500,000 to $10,000,000 |
0.00 |
Terrebonne |
2025-07-09 |
H.013340 |
|
Valhi Blvd, Multi-use Trail, Phase 1 |
Multi-use Path |
$500,000 to $1,000,000 |
1.90 |
Terrebonne |
2025-07-09 |
H.016196 |
LA 664 |
La 664: La 24 - La 3040 |
Concrete Patching and Striping |
$250,000 to $500,000 |
0.53 |
Union |
2025-07-09 |
H.015462 |
|
Pilgrim Rest Ch Rd Over Steep Bank Creek |
Bridge Replacement |
$500,000 to $1,000,000 |
0.01 |
Vermilion |
2025-07-09 |
H.014223 |
|
Camile Road Over Bayou Grand Marais |
Bridge Replacement No New Alignament |
$1,000,000 to $2,500,000 |
0.00 |
Vernon |
2025-07-09 |
H.013098 |
|
Jim Cryer Lane Over Bayou Anacoco |
Bridge Replacement; No New Alignment |
$1,000,000 to $2,500,000 |
0.03 |
Washington |
2025-07-09 |
H.012072 |
LA 60 |
La 60: Drain Bridge |
Bridge Removal - Replaced With Drainage Structure |
$500,000 to $1,000,000 |
0.15 |
Washington |
2025-07-09 |
H.014169 |
LA 3124 |
La 3124: Bogalusa City Limits - La 10 |
Mill, Overlay, Waterline Relocation, Hc Ramps, Striping |
$1,000,000 to $2,500,000 |
2.74 |
Winn |
2025-07-09 |
H.015858 |
LA 1231-2, LA 1231-1, US 84, US 167, LA 34 |
Us 84 @ US 167 Sidewalk Improvements |
Approx 3.438 Miles Of Improving Sidewalk For Ada |
$500,000 to $1,000,000 |
3.43 |
Bienville |
2025-08-13 |
H.015810 |
LA 507 |
La 507: Red River Pl - Castor |
Asphalt Surface Treatment |
$500,000 to $1,000,000 |
4.50 |
Caddo |
2025-08-13 |
H.015724 |
|
Kings Hwy: Healthcare & Dev. Corridor |
Road Reconst, Ada Ped Facilities, Signal/Sign Imp, Lighting |
$20,000,000 to $30,000,000 |
1.03 |
Calcasieu |
2025-08-13 |
H.016008 |
US 90, LA 3256 |
Us 90 & La 3256: Asphalt Overlays |
Asphalt Overlay |
$1,000,000 to $2,500,000 |
1.92 |
Calcasieu |
2025-08-13 |
H.016237 |
I-10 |
I-10: Frontage Rd At Fabacher Rd |
Microsurface |
$100,000 to $250,000 |
0.60 |
Caldwell |
2025-08-13 |
H.016111 |
LA 126 |
La 126: Castor Creek Br - US 165 |
Patch & Overlay |
$2,500,000 to $5,000,000 |
6.50 |
Caldwell, Catahoula, LaSalle |
2025-08-13 |
H.013918 |
LA 124, LA 126 |
La 126: La 124 - La 849 S. |
Patch, Mill, and Overlay |
$5,000,000 to $7,500,000 |
11.51 |
Iberia |
2025-08-13 |
H.012792 |
LA 675, US 90 |
La 675 @ Airport Rd Roundabout |
Roundabout |
$5,000,000 to $7,500,000 |
0.20 |
Jefferson |
2025-08-13 |
H.016139 |
LA 49 |
La 49: 33rd St to Joe Yenni Blvd |
Mill 2" and Overlay 2" |
$2,500,000 to $5,000,000 |
1.38 |
Jefferson Davis |
2025-08-13 |
H.014235 |
|
West Racca Rd Over E Grand Marais Ditch |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.02 |
Lafayette |
2025-08-13 |
H.015866 |
LA 720 |
La 720: La 719 - La 343 |
Mill, In-place Base Rehab, and Overlay |
$1,000,000 to $2,500,000 |
2.02 |
LaSalle |
2025-08-13 |
H.014794 |
LA 3104, LA 778 |
La 3104 & La 778 Asphalt Overlays |
Patch & Overlay |
$1,000,000 to $2,500,000 |
4.18 |
Orleans |
2025-08-13 |
H.011221 |
I-10 |
I-10: No Cbd3 Poydras - Louisa |
Signing & Signing Structures Replacement & Upgrade In No Cbd |
$5,000,000 to $7,500,000 |
3.10 |
Orleans |
2025-08-13 |
H.015945 |
LA 428 |
La 428 Sidewalk Improvements |
Adding Sidewalks and Curb Ramps |
$250,000 to $500,000 |
0.12 |
Orleans |
2025-08-13 |
H.016032 |
I-10 |
I10: Twin Span Br Pavement Markings Repl |
Pavement Marking Improvements |
$1,000,000 to $2,500,000 |
5.55 |
Ouachita |
2025-08-13 |
H.015825 |
LA 34 |
La 34: 0.3 Mi S La 617 - US 80 |
Pccp Patching, Mill & Overlay |
$5,000,000 to $7,500,000 |
2.50 |
Plaquemines |
2025-08-13 |
H.008220 836-14-0002 |
LA 406 |
La 406: Roundabout At Fe Hebert |
Construct Roundabout |
$2,500,000 to $5,000,000 |
0.36 |
Pointe Coupee |
2025-08-13 |
H.015263 |
LA 10 |
La 10 Roadway Flooding: 0.2 Mi W Of La 1 |
Raise Roadway Elevation to Prevent Flooding |
$250,000 to $500,000 |
0.17 |
Rapides |
2025-08-13 |
H.015963 |
US 165-X |
Us 165: Red Rvr Mb Ped Gates(Jackson St) |
Structural, Mechanical, Electrical |
$100,000 to $250,000 |
0.19 |
Rapides |
2025-08-13 |
H.016252 |
|
Masonic Drive: Texas Ave - Lee St |
Pavement Striping, Pedestrian Refuge Islands, Bike Lanes |
$500,000 to $1,000,000 |
0.76 |
Sabine |
2025-08-13 |
H.015280 |
LA 120 |
La 120: La 175 - Natchitoches P/L |
Patch, Mill & Overlay |
$1,000,000 to $2,500,000 |
4.13 |
St. Bernard |
2025-08-13 |
H.015881 |
LA 39 |
La 39: La 46 - St. Bernard P/L |
Patch, Mill, and Overlay |
$1,000,000 to $2,500,000 |
1.20 |
St. Charles |
2025-08-13 |
H.013567 |
I-310 |
I-310: Pavment Marking Replacement I |
Pavement Marking Replacement |
$1,000,000 to $2,500,000 |
11.18 |
St. Charles |
2025-08-13 |
H.014050 |
|
Willowdale Blvd: US 90 - E. Heather Dr. |
Pavement Rehab, Turn Lane |
$250,000 to $500,000 |
1.15 |
St. Martin |
2025-08-13 |
H.012618 |
LA 347 |
La 347 Drainage Improvements |
Raise Road X-section And/Or Replace Subdrainage Structures |
$500,000 to $1,000,000 |
2.03 |
Tangipahoa |
2025-08-13 |
H.014265 |
|
North River Road Over Irving Branch |
Bridge Replacement, No New Alignment |
$500,000 to $1,000,000 |
0.02 |
Terrebonne |
2025-08-13 |
H.013213 |
LA 3040 |
La 3040: 600' S Hollywood - La 24 |
Mill, Patch, and Overlay |
$2,500,000 to $5,000,000 |
2.64 |
Terrebonne |
2025-08-13 |
H.013714 |
|
Valhi Blvd Shared-use Path (Houma) |
Shared Use Path |
$250,000 to $500,000 |
0.73 |
Union |
2025-08-13 |
H.015463 |
|
White Oak Landing Over Edmonds Creek |
Bridge Replacement |
$500,000 to $1,000,000 |
0.01 |
Vernon |
2025-08-13 |
H.015446 |
|
Craigerville Road Over Mayhaw Branch |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.01 |
Bossier |
2025-08-20 |
H.015389 |
LA 157 |
La 157: Las Xing (Bossier) |
Upgrade RR Signals to Cants |
$0 to $100,000 |
0.01 |
East Baton Rouge |
2025-08-20 |
H.013864 |
US 61 |
Us 61: Ic RR Xing (Baton Rouge) |
Upgrade RR Crossing's Signal |
$500,000 to $1,000,000 |
0.01 |
Iberville |
2025-08-20 |
H.015951 |
|
Dorcy & Lacroix: Up Crossings(Iberville) |
Railroad Surface and Closure |
$250,000 to $500,000 |
0.02 |
Webster |
2025-08-20 |
H.012873 |
|
Old US 80: Las RR Xing (Webster) |
Remove Crossing and ITS Road Approaches |
$0 to $100,000 |
0.02 |
Acadia |
2025-09-10 |
H.014979 |
|
Airport Road Over Unnamed Canal |
Bridge Replacement No New Alignment |
$250,000 to $500,000 |
0.00 |
Acadia |
2025-09-10 |
H.014980 |
|
Chinaberry Drive Over Unnamed Coulee |
Bridge Replacement No New Alignment |
$250,000 to $500,000 |
0.00 |
Acadia |
2025-09-10 |
H.015513 |
|
Elenor Road Over Bayou Blanc |
Bridge Design |
$1,000,000 to $2,500,000 |
0.01 |
Bossier, Caddo |
2025-09-10 |
H.016156 |
LA 3032, LA 3, LA 523, LA 511, LA 3194, LA 3036, LA 526 |
District 04 Concrete Patching |
District Wide Concrete Patching Project |
$2,500,000 to $5,000,000 |
16.98 |
Catahoula |
2025-09-10 |
H.015393 |
LA 1018-1, LA 1018-3, LA 1018-2, LA 922, LA 1018-5, LA 1018-4 |
La 1018 & La 922: Harrisonburg Rt |
Provide a Total Of $423,258 In Funds to Harrisonburg |
$250,000 to $500,000 |
0.85 |
Claiborne |
2025-09-10 |
H.015302 |
LA 540 |
La 540: La 2 - La 534 |
Chip Seal |
$500,000 to $1,000,000 |
6.46 |
Concordia |
2025-09-10 |
H.016121 |
LA 906 |
La 906: La 129 - End Of Maintenance |
Patch & Overlay |
$1,000,000 to $2,500,000 |
2.40 |
East Baton Rouge |
2025-09-10 |
H.014675 |
US 61-X |
Us 61-x: N. 22nd St. - US 61 |
Patch, Mill, Overlay, Sidewalk and Bike Paths, and Drainage |
$30,000,000 to $50,000,000 |
3.97 |
Franklin |
2025-09-10 |
H.015873 |
LA 562 |
La 562: US 425 - Jct River Rd |
Patch and Overlay |
$2,500,000 to $5,000,000 |
7.50 |
Iberia |
2025-09-10 |
H.014278 |
LA 85 |
La 85: Patout & Drain Canal Bridges |
Bridge Replacement |
$500,000 to $1,000,000 |
0.15 |
Iberia |
2025-09-10 |
H.014510 |
|
Iberia St Pavement Preserv and Bike Impr |
Rehabilitation Of Road Surface and Bike Improvements |
$500,000 to $1,000,000 |
1.39 |
Jefferson Davis |
2025-09-10 |
H.016112 |
LA 14 |
La 14: La 380 - La 26 |
Patch, Mill, Overlay |
$500,000 to $1,000,000 |
1.85 |
Lafayette |
2025-09-10 |
H.014509 |
|
Doucet Rd Sidewalks |
Add Sidewalks and Striped Crosswalks |
$1,000,000 to $2,500,000 |
0.89 |
Lafayette |
2025-09-10 |
H.015308 |
I-49 |
I-49: I-10 - St. Landry P/L |
Patch, Mill, Overlay |
$20,000,000 to $30,000,000 |
8.50 |
Lafourche |
2025-09-10 |
H.014629 |
|
Lafourche Parish Signing and Striping |
Roadway Striping, Signage and Related Work |
$1,000,000 to $2,500,000 |
25.02 |
LaSalle |
2025-09-10 |
H.016123 |
LA 771 |
La 771: La 503 - End Of Maintenance |
Patch & Overlay |
$1,000,000 to $2,500,000 |
4.51 |
Lincoln |
2025-09-10 |
H.014813 |
LA 150 |
La 150: US 80 - La 149 |
Patch, Mill & Overlay |
$1,000,000 to $2,500,000 |
3.75 |
Lincoln, Union |
2025-09-10 |
H.012711 |
LA 151 |
La 151: La 145 - La 33 |
Patch and Overlay |
$2,500,000 to $5,000,000 |
5.14 |
Orleans |
2025-09-10 |
H.014752 |
LA 46, LA 3021 |
La 3021: Dual Turn Lanes @ La 39 |
Add Dual Left Turn Lanes From La 3021 to La 39 |
$500,000 to $1,000,000 |
0.16 |
Orleans |
2025-09-10 |
H.015782 |
US 90 |
Us 90: Napoleon - US 90b |
Mill, Patch, and Overlay |
$2,500,000 to $5,000,000 |
1.13 |
Orleans |
2025-09-10 |
H.015846 |
US 11 |
Us 11: Little Irish Bayou - I-10 |
Asphalt Mill & Overlay, Patching and New Pavement Markings |
$1,000,000 to $2,500,000 |
1.09 |
Ouachita |
2025-09-10 |
H.013401 |
|
Crosley St Rehab: Trenton - N 7th |
Asphalt Overlay |
$250,000 to $500,000 |
0.45 |
Ouachita |
2025-09-10 |
H.014676 |
|
Downtown Impr (Ph 1): Bridge St-pine St |
Striping, Street Lighting and Sidewalks |
$250,000 to $500,000 |
0.19 |
Ouachita |
2025-09-10 |
H.014688 |
|
Arkansas Rd Rehab: N 7th - Trenton |
Mill and Overlay With Shoulder and Sidewalk |
$500,000 to $1,000,000 |
0.58 |
Ouachita |
2025-09-10 |
H.015248 |
LA 15, US 165-Y |
La 15 & US 165-business: Repairs |
Patch, Mill and Overlay Asphalt Pavement and Patch Jcp |
$2,500,000 to $5,000,000 |
5.68 |
St. Mary |
2025-09-10 |
H.013722 |
|
Morgan City Sidewalks: Downtown & Myrtle |
Feasibility Study |
$250,000 to $500,000 |
1.14 |
St. Tammany, Tangipahoa |
2025-09-10 |
H.016034 |
I-12 |
I-12: I-55 to La 21 Pavement Markers |
Raised Pavement Markers |
$100,000 to $250,000 |
20.96 |
Tangipahoa |
2025-09-10 |
H.014801 |
LA 443 |
La 443: US 190 - La 1064 |
Patch, Mill & Overlay |
$2,500,000 to $5,000,000 |
4.42 |
Tangipahoa |
2025-09-10 |
H.015432 |
|
M. Williams Road Over Spring Creek |
Bridge Replacment |
$1,000,000 to $2,500,000 |
0.02 |
Tangipahoa |
2025-09-10 |
H.015828 |
US 51-X |
Us 51x: Jct La 22 - Jct I-12 |
Mill, Patch, and Overlay |
$5,000,000 to $7,500,000 |
2.67 |
Vermilion |
2025-09-10 |
H.012001 |
LA 339 |
La 339: Canal & Creek Bridges |
Replacement Of 3 Timber Bridges With 3 Rcb Culverts |
$2,500,000 to $5,000,000 |
0.71 |
Webster |
2025-09-10 |
H.015243 |
I-20 |
I-20 Frontage Road: Goodwill Road |
Relocate and Transfer Frontage Road |
$2,500,000 to $5,000,000 |
0.86 |
Winn |
2025-09-10 |
H.015445 |
|
Harrisonburg Road Over Nantaches Creek |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.00 |