| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,000.00 |
4,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
402   |
SQYD |
20.00 |
8,040.00 |
15.00 |
6,030.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
54.0 |
LNFT |
20.00 |
1,080.00 |
15.00 |
810.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
15   |
CUYD |
25.00 |
375.00 |
75.00 |
1,125.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
234   |
CUYD |
65.00 |
15,210.00 |
50.00 |
11,700.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,405.3 |
TON |
120.00 |
408,636.00 |
145.00 |
493,768.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
669.9 |
TON |
220.00 |
147,378.00 |
145.00 |
97,135.50 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
2,436   |
GAL |
3.00 |
7,308.00 |
5.00 |
12,180.00 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
3,582   |
SQYD |
8.50 |
30,447.00 |
4.00 |
14,328.00 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
3,582   |
SQYD |
8.00 |
28,656.00 |
4.00 |
14,328.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
20,150   |
SQYD |
4.00 |
80,600.00 |
4.00 |
80,600.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 809   |
CUYD |
0.10 |
- 80.90 |
0.01 |
- 8.09 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,363   |
SQYD |
130.00 |
177,190.00 |
225.00 |
306,675.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
1,240   |
LNFT |
4.00 |
4,960.00 |
4.50 |
5,580.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
1,612   |
LNFT |
4.00 |
6,448.00 |
4.50 |
7,254.00 |
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
50   |
LNFT |
175.00 |
8,750.00 |
200.00 |
10,000.00 |
|
|
|
|
| 701-12-I |
corrugated metal pipe (extension)(24")
|
10   |
LNFT |
200.00 |
2,000.00 |
250.00 |
2,500.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
850.00 |
850.00 |
750.00 |
750.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
30   |
EACH |
2,000.00 |
60,000.00 |
1,750.00 |
52,500.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
3,000.00 |
6,000.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
400.1 |
SQYD |
80.00 |
32,008.00 |
75.00 |
30,007.50 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
54.0 |
LNFT |
30.00 |
1,620.00 |
30.00 |
1,620.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.337 |
MILE |
150.00 |
650.55 |
225.00 |
975.83 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.048 |
MILE |
400.00 |
19.20 |
250.00 |
12.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
9.566 |
MILE |
800.00 |
7,652.80 |
250.00 |
2,391.50 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
2.5 |
TON |
500.00 |
1,250.00 |
1,200.00 |
3,000.00 |
|
|
|
|
| 717-01 |
seeding
|
56   |
LB |
10.00 |
560.00 |
15.00 |
840.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,250   |
LB |
0.50 |
625.00 |
0.75 |
937.50 |
|
|
|
|
| 726-01 |
bedding material
|
16.7 |
CUYD |
1,000.00 |
16,700.00 |
105.00 |
1,753.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
125,000.00 |
125,000.00 |
110,000.00 |
110,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
60.00 |
240.00 |
100.00 |
400.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
202   |
EACH |
6.00 |
1,212.00 |
12.00 |
2,424.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.502 |
MILE |
3,000.00 |
10,506.00 |
3,500.00 |
12,257.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.016 |
MILE |
1,000.00 |
16.00 |
15,000.00 |
240.00 |
|
|
|
|
| 735-01 |
mailboxes
|
86   |
EACH |
1.00 |
86.00 |
5.00 |
430.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
49   |
EACH |
150.00 |
7,350.00 |
125.00 |
6,125.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
11   |
EACH |
250.00 |
2,750.00 |
250.00 |
2,750.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
450.00 |
900.00 |
350.00 |
700.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
21,000.00 |
21,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
5   |
EACH |
1,000.00 |
5,000.00 |
1,000.00 |
5,000.00 |
|
|
|
|
| S-001 |
saw cutting concrete drives (6" depth)
|
167   |
LNFT |
10.00 |
1,670.00 |
12.00 |
2,004.00 |
|
|
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
1,240   |
LNFT |
5.00 |
6,200.00 |
4.00 |
4,960.00 |
|
|
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
1,612   |
LNFT |
5.00 |
8,060.00 |
4.00 |
6,448.00 |
|
|
|
|
| S-004 |
sawcuts in asphaltic concrete lifts
|
2,852   |
LNFT |
1.00 |
2,852.00 |
2.00 |
5,704.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,276,774.65 |
|
1,414,235.74 |
|
|
|
|
|