Letting of 10/31/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 826-03-0012
Parish: JEFFERSON
Routes: LA 3152, LA 3139
Description: CLEARVIEW / EARHART DRAINAGE IMPROVEMENTS (PHASE 2)
Type Const: grading, excavation and embankment, drainage structures, water and sewer modifications,
and related work.
Estimated Construction Cost: $5,195,062.30
 
RankLicenseBidderConstruction Bid
1 27634 PHYLWAY CONSTRUCTION LLC $4,831,575.00
2 00935 FLEMING CONSTRUCTION CO., INC. $5,422,245.50
3 40038 COMMAND CONSTRUCTION LLC $5,634,008.50
4 11242 GILMORE & SON CONSTRUCTION CORP. $6,198,271.00
5 02179 BOH BROS. CONSTRUCTION CO., LLC. $6,210,562.00
6 06276 BARRIERE CONSTRUCTION CO., LLC. $6,384,819.40
7 36961 CYCLE CONSTRUCTION CO. L.L.C. $6,563,063.00
8 45210 CERES ENVIRONMENTAL SERVICES,INC. $8,542,438.13
9 35678 BEVERLY CONSTRUCTION CO. LLC $10,097,800.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
PHYLWAY CONSTRUCTION LLC
- 2 -
FLEMING CONSTRUCTION CO., INC.
- 3 -
COMMAND CONSTRUCTION LLC
- 4 -
GILMORE & SON CONSTRUCTION CORP.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 6,000.00 6,000.00 75,000.00 75,000.00 50,000.00 50,000.00 50,000.00 50,000.00
202-02-I removal of concrete pipe (31" x 51") 120      LNFT 30.00 3,600.00 64.00 7,680.00 5.00 600.00 30.00 3,600.00
202-02-J removal of concrete pipe (48") 494      LNFT 15.00 7,410.00 53.00 26,182.00 5.00 2,470.00 30.00 14,820.00
202-02-K removal of concrete pipe (24") 200      LNFT 24.00 4,800.00 45.00 9,000.00 5.00 1,000.00 20.00 4,000.00
202-02-L removal of corrugated metal pipe (62" x 102") 104      LNFT 55.00 5,720.00 18.00 1,872.00 5.00 520.00 40.00 4,160.00
202-02-M removal of corrugated metal pipe (48") 65      LNFT 38.00 2,470.00 32.00 2,080.00 5.00 325.00 25.00 1,625.00
202-02-N removal of corrugated metal pipe (24") 60      LNFT 24.00 1,440.00 34.00 2,040.00 5.00 300.00 15.00 900.00
202-02-O removal of concrete catch basin/drop inlet 4      EACH 800.00 3,200.00 800.00 3,200.00 500.00 2,000.00 400.00 1,600.00
202-02-P removal of water line (12") 118      LNFT 24.00 2,832.00 25.00 2,950.00 5.00 590.00 10.00 1,180.00
203-05 excavation & embankment lump      LUMP 315,000.00 315,000.00 148,000.00 148,000.00 385,000.00 385,000.00 240,000.00 240,000.00
204-06 temporary silt fencing 2,100      LNFT 1.60 3,360.00 7.00 14,700.00 2.00 4,200.00 10.00 21,000.00
701-03-M storm drain pipe (36" rcp/pcp) 38      LNFT 225.00 8,550.00 206.00 7,828.00 170.00 6,460.00 140.00 5,320.00
701-03-N storm drain pipe (42" rcp/pcp) 25      LNFT 260.00 6,500.00 235.00 5,875.00 220.00 5,500.00 170.00 4,250.00
701-03-O storm drain pipe (48" rcp/pcp) 122      LNFT 290.00 35,380.00 280.00 34,160.00 375.00 45,750.00 220.00 26,840.00
701-03-Q storm drain pipe (60" rcp/pcp) 2,682      LNFT 325.00 871,650.00 345.00 925,290.00 400.00 1,072,800.00 370.00 992,340.00
701-12-G corrugated metal pipe (extension)(18") 30      LNFT 150.00 4,500.00 200.00 6,000.00 65.00 1,950.00 70.00 2,100.00
701-12-I corrugated metal pipe (extension)(24") 80      LNFT 150.00 12,000.00 195.00 15,600.00 70.00 5,600.00 100.00 8,000.00
701-12-Q corrugated metal pipe (extension)(60") 95      LNFT 250.00 23,750.00 248.00 23,560.00 75.00 7,125.00 330.00 31,350.00
701-12-S corrugated metal pipe (extension)(72") 400      LNFT 300.00 120,000.00 300.00 120,000.00 200.00 80,000.00 380.00 152,000.00
701-15 concrete collar 9      EACH 1,000.00 9,000.00 4,700.00 42,300.00 1,000.00 9,000.00 5,000.00 45,000.00
702-02-G manholes (mh-12.5 x 9) 6      EACH 6,000.00 36,000.00 18,000.00 108,000.00 7,500.00 45,000.00 22,000.00 132,000.00
702-03-C catch basins (cb-06) 4      EACH 6,000.00 24,000.00 6,400.00 25,600.00 5,000.00 20,000.00 16,000.00 64,000.00
702-03-I catch basins (cb-opntop4) 14      EACH 12,000.00 168,000.00 15,000.00 210,000.00 12,000.00 168,000.00 16,000.00 224,000.00
706-03-A incidental concrete paving (4" thick) 3,098.9    SQYD 40.00 123,956.00 40.00 123,956.00 35.00 108,461.50 100.00 309,890.00
712-02 sacked concrete revetment 1,200      SQYD 40.00 48,000.00 73.00 87,600.00 50.00 60,000.00 50.00 60,000.00
713-01 temporary signs & barricades lump      LUMP 24,000.00 24,000.00 30,000.00 30,000.00 1,000.00 1,000.00 50,000.00 50,000.00
713-07 temporary precast concrete barrier (contractor
furnished)
50      EACH 600.00 30,000.00 950.00 47,500.00 500.00 25,000.00 1,000.00 50,000.00
713-10 temporary precast concrete barrier movement 25      EACH 50.00 1,250.00 200.00 5,000.00 200.00 5,000.00 300.00 7,500.00
722-01 project site laboratory 1      EACH 8,000.00 8,000.00 15,000.00 15,000.00 1,000.00 1,000.00 60,000.00 60,000.00
726-01 bedding material 5,218.1    CUYD 60.00 313,086.00 65.00 339,176.50 100.00 521,810.00 60.00 313,086.00
727-01 mobilization lump      LUMP 280,000.00 280,000.00 190,000.00 190,000.00 500,000.00 500,000.00 220,000.00 220,000.00
739-01 hydro-seeding 10.50   ACRE 1,000.00 10,500.00 2,500.00 26,250.00 1,000.00 10,500.00 3,000.00 31,500.00
740-01 construction layout lump      LUMP 36,000.00 36,000.00 32,000.00 32,000.00 1,000.00 1,000.00 70,000.00 70,000.00
S-001 junction box 2      EACH 16,000.00 32,000.00 47,000.00 94,000.00 20,000.00 40,000.00 40,000.00 80,000.00
S-002 duckbill check valve (60" rubber) 2      EACH 45,000.00 90,000.00 53,000.00 106,000.00 30,000.00 60,000.00 40,000.00 80,000.00
S-003 reinforced concrete flume 800      LNFT 710.00 568,000.00 985.00 788,000.00 1,000.00 800,000.00 1,030.00 824,000.00
S-004 jacked or bored steel pipe (60" dia., 1.25" thick) 452      LNFT 1,425.00 644,100.00 1,650.00 745,800.00 1,750.00 791,000.00 1,720.00 777,440.00
S-005 jacked or bored steel pipe (60" dia., 0.75" thick) 320      LNFT 1,240.00 396,800.00 1,400.00 448,000.00 1,500.00 480,000.00 1,470.00 470,400.00
S-006 waterline aerial crossing (12" long span dip. sta
10+85)
lump      LUMP 16,000.00 16,000.00 19,500.00 19,500.00 7,500.00 7,500.00 46,000.00 46,000.00
S-007 waterline aerial crossing (12" long span dip. sta
17+97)
lump      LUMP 16,000.00 16,000.00 19,500.00 19,500.00 7,500.00 7,500.00 47,000.00 47,000.00
S-008 interior bent 4      EACH 12,000.00 48,000.00 17,500.00 70,000.00 10,000.00 40,000.00 16,000.00 64,000.00
S-009 end bent 4      EACH 10,000.00 40,000.00 17,500.00 70,000.00 11,000.00 44,000.00 15,000.00 60,000.00
S-010 gate valve (12") 7      EACH 2,800.00 19,600.00 2,000.00 14,000.00 2,500.00 17,500.00 2,500.00 17,500.00
S-011 water line (12" dip unrestrained joint) 410.0    LNFT 54.00 22,140.00 90.00 36,900.00 90.00 36,900.00 80.00 32,800.00
S-012 water line (12" dip restrained joint) 547.0    LNFT 80.00 43,760.00 170.00 92,990.00 110.00 60,170.00 120.00 65,640.00
S-013 thrust blocking (steel sheet pile) 4      EACH 1,350.00 5,400.00 5,400.00 21,600.00 500.00 2,000.00 500.00 2,000.00
S-014 box culvert crossing 1      EACH 8,000.00 8,000.00 10,500.00 10,500.00 4,000.00 4,000.00 18,000.00 18,000.00
S-015 cleaning existing box culverts (per barrel) 884      LNFT 26.00 22,984.00 50.00 44,200.00 20.00 17,680.00 40.00 35,360.00
S-016 sanitary sewer force main (4" c-900 restrained joint) 150      LNFT 20.00 3,000.00 120.00 18,000.00 40.00 6,000.00 50.00 7,500.00
S-017 sanitary sewer force main (4" c-900 unrestrained joint) 150      LNFT 30.00 4,500.00 120.00 18,000.00 35.00 5,250.00 80.00 12,000.00
S-018 water line (6" dip restrained joint) 20      LNFT 40.00 800.00 200.00 4,000.00 100.00 2,000.00 90.00 1,800.00
S-019 fire hydrant assembly 1      EACH 5,000.00 5,000.00 6,000.00 6,000.00 7,000.00 7,000.00 3,500.00 3,500.00
S-020 cleaning drainage culverts (less than 18") 3,461      LNFT 11.00 38,071.00 4.00 13,844.00 1.00 3,461.00 10.00 34,610.00
S-021 cleaning drainage culverts (18" to 36") 5,173      LNFT 22.00 113,806.00 4.00 20,692.00 2.00 10,346.00 20.00 103,460.00
S-022 cleaning drainage culverts (larger than 36") 4,580      LNFT 27.00 123,660.00 4.00 18,320.00 3.00 13,740.00 40.00 183,200.00
S-023 impact attenuator (construction zone) 1      EACH 20,000.00 20,000.00 29,000.00 29,000.00 30,000.00 30,000.00 30,000.00 30,000.00
                       
 CONTRACTOR TOTAL       4,831,575.00   5,422,245.50   5,634,008.50   6,198,271.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
BOH BROS. CONSTRUCTION CO., LLC.
- 6 -
BARRIERE CONSTRUCTION CO., LLC.
- 7 -
CYCLE CONSTRUCTION CO. L.L.C.
- 8 -
CERES ENVIRONMENTAL SERVICES,INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 25,000.00 25,000.00 40,000.00 40,000.00 20,000.00 20,000.00 86,125.00 86,125.00
202-02-I removal of concrete pipe (31" x 51") 120      LNFT 16.00 1,920.00 50.00 6,000.00 30.00 3,600.00 25.75 3,090.00
202-02-J removal of concrete pipe (48") 494      LNFT 17.00 8,398.00 50.00 24,700.00 25.00 12,350.00 27.25 13,461.50
202-02-K removal of concrete pipe (24") 200      LNFT 14.00 2,800.00 30.00 6,000.00 16.00 3,200.00 22.44 4,488.00
202-02-L removal of corrugated metal pipe (62" x 102") 104      LNFT 20.00 2,080.00 90.00 9,360.00 40.00 4,160.00 86.29 8,974.16
202-02-M removal of corrugated metal pipe (48") 65      LNFT 13.00 845.00 50.00 3,250.00 25.00 1,625.00 69.04 4,487.60
202-02-N removal of corrugated metal pipe (24") 60      LNFT 12.00 720.00 40.00 2,400.00 16.00 960.00 53.18 3,190.80
202-02-O removal of concrete catch basin/drop inlet 4      EACH 200.00 800.00 900.00 3,600.00 500.00 2,000.00 2,852.75 11,411.00
202-02-P removal of water line (12") 118      LNFT 15.00 1,770.00 30.00 3,540.00 30.00 3,540.00 27.04 3,190.72
203-05 excavation & embankment lump      LUMP 410,000.00 410,000.00 250,000.00 250,000.00 250,000.00 250,000.00 738,562.50 738,562.50
204-06 temporary silt fencing 2,100      LNFT 1.50 3,150.00 2.00 4,200.00 2.00 4,200.00 3.38 7,098.00
701-03-M storm drain pipe (36" rcp/pcp) 38      LNFT 200.00 7,600.00 230.00 8,740.00 300.00 11,400.00 120.93 4,595.34
701-03-N storm drain pipe (42" rcp/pcp) 25      LNFT 215.00 5,375.00 300.00 7,500.00 400.00 10,000.00 131.05 3,276.25
701-03-O storm drain pipe (48" rcp/pcp) 122      LNFT 280.00 34,160.00 300.00 36,600.00 400.00 48,800.00 127.06 15,501.32
701-03-Q storm drain pipe (60" rcp/pcp) 2,682      LNFT 360.00 965,520.00 380.00 1,019,160.00 455.00 1,220,310.00 176.21 472,595.22
701-12-G corrugated metal pipe (extension)(18") 30      LNFT 135.00 4,050.00 144.00 4,320.00 400.00 12,000.00 108.24 3,247.20
701-12-I corrugated metal pipe (extension)(24") 80      LNFT 150.00 12,000.00 195.00 15,600.00 400.00 32,000.00 96.19 7,695.20
701-12-Q corrugated metal pipe (extension)(60") 95      LNFT 420.00 39,900.00 330.00 31,350.00 650.00 61,750.00 233.18 22,152.10
701-12-S corrugated metal pipe (extension)(72") 400      LNFT 500.00 200,000.00 370.00 148,000.00 850.00 340,000.00 399.95 159,980.00
701-15 concrete collar 9      EACH 2,500.00 22,500.00 2,000.00 18,000.00 6,000.00 54,000.00 6,060.00 54,540.00
702-02-G manholes (mh-12.5 x 9) 6      EACH 6,500.00 39,000.00 8,000.00 48,000.00 20,000.00 120,000.00 87,941.66 527,649.96
702-03-C catch basins (cb-06) 4      EACH 5,500.00 22,000.00 8,700.00 34,800.00 10,000.00 40,000.00 11,040.00 44,160.00
702-03-I catch basins (cb-opntop4) 14      EACH 10,000.00 140,000.00 12,000.00 168,000.00 20,000.00 280,000.00 17,595.00 246,330.00
706-03-A incidental concrete paving (4" thick) 3,098.9    SQYD 70.00 216,923.00 48.00 148,747.20 55.00 170,439.50 51.04 158,167.86
712-02 sacked concrete revetment 1,200      SQYD 100.00 120,000.00 43.00 51,600.00 32.00 38,400.00 88.23 105,876.00
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 86,000.00 86,000.00 80,000.00 80,000.00 75,830.00 75,830.00
713-07 temporary precast concrete barrier (contractor
furnished)
50      EACH 1,500.00 75,000.00 1,300.00 65,000.00 1,000.00 50,000.00 1,394.30 69,715.00
713-10 temporary precast concrete barrier movement 25      EACH 200.00 5,000.00 550.00 13,750.00 350.00 8,750.00 350.70 8,767.50
722-01 project site laboratory 1      EACH 35,000.00 35,000.00 42,000.00 42,000.00 10,000.00 10,000.00 41,200.00 41,200.00
726-01 bedding material 5,218.1    CUYD 65.00 339,176.50 62.00 323,522.20 105.00 547,900.50 117.95 615,474.90
727-01 mobilization lump      LUMP 458,000.00 458,000.00 400,000.00 400,000.00 250,000.00 250,000.00 841,718.75 841,718.75
739-01 hydro-seeding 10.50   ACRE 750.00 7,875.00 1,000.00 10,500.00 1,000.00 10,500.00 2,258.10 23,710.05
740-01 construction layout lump      LUMP 120,000.00 120,000.00 55,000.00 55,000.00 30,000.00 30,000.00 189,637.50 189,637.50
S-001 junction box 2      EACH 50,000.00 100,000.00 70,000.00 140,000.00 54,000.00 108,000.00 23,975.00 47,950.00
S-002 duckbill check valve (60" rubber) 2      EACH 40,000.00 80,000.00 50,000.00 100,000.00 56,000.00 112,000.00 7,130.00 14,260.00
S-003 reinforced concrete flume 800      LNFT 1,500.00 1,200,000.00 1,400.00 1,120,000.00 1,120.00 896,000.00 1,710.01 1,368,008.00
S-004 jacked or bored steel pipe (60" dia., 1.25" thick) 452      LNFT 1,500.00 678,000.00 1,800.00 813,600.00 1,650.00 745,800.00 2,023.69 914,707.88
S-005 jacked or bored steel pipe (60" dia., 0.75" thick) 320      LNFT 1,200.00 384,000.00 1,500.00 480,000.00 1,420.00 454,400.00 1,768.80 566,016.00
S-006 waterline aerial crossing (12" long span dip. sta
10+85)
lump      LUMP 45,000.00 45,000.00 20,000.00 20,000.00 46,000.00 46,000.00 52,037.50 52,037.50
S-007 waterline aerial crossing (12" long span dip. sta
17+97)
lump      LUMP 35,000.00 35,000.00 20,000.00 20,000.00 46,000.00 46,000.00 51,362.50 51,362.50
S-008 interior bent 4      EACH 7,800.00 31,200.00 15,000.00 60,000.00 14,000.00 56,000.00 16,555.20 66,220.80
S-009 end bent 4      EACH 7,400.00 29,600.00 15,000.00 60,000.00 12,000.00 48,000.00 14,805.60 59,222.40
S-010 gate valve (12") 7      EACH 1,500.00 10,500.00 3,000.00 21,000.00 2,500.00 17,500.00 5,546.85 38,827.95
S-011 water line (12" dip unrestrained joint) 410.0    LNFT 85.00 34,850.00 80.00 32,800.00 100.00 41,000.00 87.36 35,817.60
S-012 water line (12" dip restrained joint) 547.0    LNFT 120.00 65,640.00 100.00 54,700.00 145.00 79,315.00 110.69 60,547.43
S-013 thrust blocking (steel sheet pile) 4      EACH 1,000.00 4,000.00 1,000.00 4,000.00 5,000.00 20,000.00 2,057.50 8,230.00
S-014 box culvert crossing 1      EACH 20,000.00 20,000.00 13,000.00 13,000.00 15,000.00 15,000.00 47,987.50 47,987.50
S-015 cleaning existing box culverts (per barrel) 884      LNFT 40.00 35,360.00 28.00 24,752.00 15.00 13,260.00 83.40 73,725.60
S-016 sanitary sewer force main (4" c-900 restrained joint) 150      LNFT 35.00 5,250.00 50.00 7,500.00 60.00 9,000.00 44.60 6,690.00
S-017 sanitary sewer force main (4" c-900 unrestrained joint) 150      LNFT 30.00 4,500.00 51.00 7,650.00 50.00 7,500.00 39.88 5,982.00
S-018 water line (6" dip restrained joint) 20      LNFT 45.00 900.00 100.00 2,000.00 200.00 4,000.00 192.94 3,858.80
S-019 fire hydrant assembly 1      EACH 5,000.00 5,000.00 6,000.00 6,000.00 6,000.00 6,000.00 7,319.90 7,319.90
S-020 cleaning drainage culverts (less than 18") 3,461      LNFT 3.25 11,248.25 12.00 41,532.00 5.00 17,305.00 26.96 93,308.56
S-021 cleaning drainage culverts (18" to 36") 5,173      LNFT 5.25 27,158.25 22.00 113,806.00 6.00 31,038.00 36.96 191,194.08
S-022 cleaning drainage culverts (larger than 36") 4,580      LNFT 5.85 26,793.00 28.00 128,240.00 7.00 32,060.00 48.74 223,229.20
S-023 impact attenuator (construction zone) 1      EACH 20,000.00 20,000.00 25,000.00 25,000.00 26,000.00 26,000.00 30,035.00 30,035.00
                       
 CONTRACTOR TOTAL       6,210,562.00   6,384,819.40   6,563,063.00   8,542,438.13
 
Item Number Item Description Quantity Unit of Measure - 9 -
BEVERLY CONSTRUCTION CO. LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 34,000.00 34,000.00            
202-02-I removal of concrete pipe (31" x 51") 120      LNFT 50.00 6,000.00            
202-02-J removal of concrete pipe (48") 494      LNFT 47.00 23,218.00            
202-02-K removal of concrete pipe (24") 200      LNFT 33.00 6,600.00            
202-02-L removal of corrugated metal pipe (62" x 102") 104      LNFT 70.00 7,280.00            
202-02-M removal of corrugated metal pipe (48") 65      LNFT 51.00 3,315.00            
202-02-N removal of corrugated metal pipe (24") 60      LNFT 40.00 2,400.00            
202-02-O removal of concrete catch basin/drop inlet 4      EACH 1,100.00 4,400.00            
202-02-P removal of water line (12") 118      LNFT 50.00 5,900.00            
203-05 excavation & embankment lump      LUMP 478,000.00 478,000.00            
204-06 temporary silt fencing 2,100      LNFT 3.10 6,510.00            
701-03-M storm drain pipe (36" rcp/pcp) 38      LNFT 175.00 6,650.00            
701-03-N storm drain pipe (42" rcp/pcp) 25      LNFT 200.00 5,000.00            
701-03-O storm drain pipe (48" rcp/pcp) 122      LNFT 220.00 26,840.00            
701-03-Q storm drain pipe (60" rcp/pcp) 2,682      LNFT 260.00 697,320.00            
701-12-G corrugated metal pipe (extension)(18") 30      LNFT 134.00 4,020.00            
701-12-I corrugated metal pipe (extension)(24") 80      LNFT 148.00 11,840.00            
701-12-Q corrugated metal pipe (extension)(60") 95      LNFT 280.00 26,600.00            
701-12-S corrugated metal pipe (extension)(72") 400      LNFT 325.00 130,000.00            
701-15 concrete collar 9      EACH 1,700.00 15,300.00            
702-02-G manholes (mh-12.5 x 9) 6      EACH 6,400.00 38,400.00            
702-03-C catch basins (cb-06) 4      EACH 7,800.00 31,200.00            
702-03-I catch basins (cb-opntop4) 14      EACH 11,000.00 154,000.00            
706-03-A incidental concrete paving (4" thick) 3,098.9    SQYD 55.00 170,439.50            
712-02 sacked concrete revetment 1,200      SQYD 67.00 80,400.00            
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00            
713-07 temporary precast concrete barrier (contractor
furnished)
50      EACH 1,000.00 50,000.00            
713-10 temporary precast concrete barrier movement 25      EACH 115.00 2,875.00            
722-01 project site laboratory 1      EACH 42,000.00 42,000.00            
726-01 bedding material 5,218.1    CUYD 82.00 427,884.20            
727-01 mobilization lump      LUMP 190,000.00 190,000.00            
739-01 hydro-seeding 10.50   ACRE 1,800.00 18,900.00            
740-01 construction layout lump      LUMP 71,000.00 71,000.00            
S-001 junction box 2      EACH 34,000.00 68,000.00            
S-002 duckbill check valve (60" rubber) 2      EACH 43,500.00 87,000.00            
S-003 reinforced concrete flume 800      LNFT 790.00 632,000.00            
S-004 jacked or bored steel pipe (60" dia., 1.25" thick) 452      LNFT 1,642.00 742,184.00            
S-005 jacked or bored steel pipe (60" dia., 0.75" thick) 320      LNFT 1,435.00 459,200.00            
S-006 waterline aerial crossing (12" long span dip. sta
10+85)
lump      LUMP 14,500.00 14,500.00            
S-007 waterline aerial crossing (12" long span dip. sta
17+97)
lump      LUMP 14,500.00 14,500.00            
S-008 interior bent 4      EACH 12,500.00 50,000.00            
S-009 end bent 4      EACH 13,250.00 53,000.00            
S-010 gate valve (12") 7      EACH 2,900.00 20,300.00            
S-011 water line (12" dip unrestrained joint) 410.0    LNFT 60.00 24,600.00            
S-012 water line (12" dip restrained joint) 547.0    LNFT 82.00 44,854.00            
S-013 thrust blocking (steel sheet pile) 4      EACH 1,400.00 5,600.00            
S-014 box culvert crossing 1      EACH 11,500.00 11,500.00            
S-015 cleaning existing box culverts (per barrel) 884      LNFT 11.00 9,724.00            
S-016 sanitary sewer force main (4" c-900 restrained joint) 150      LNFT 21.00 3,150.00            
S-017 sanitary sewer force main (4" c-900 unrestrained joint) 150      LNFT 26.00 3,900.00            
S-018 water line (6" dip restrained joint) 20      LNFT 65.00 1,300.00            
S-019 fire hydrant assembly 1      EACH 4,500.00 4,500.00            
S-020 cleaning drainage culverts (less than 18") 3,461      LNFT 7.00 24,227.00            
S-021 cleaning drainage culverts (18" to 36") 5,173      LNFT 950.00 4,914,350.00            
S-022 cleaning drainage culverts (larger than 36") 4,580      LNFT 14.00 64,120.00            
S-023 impact attenuator (construction zone) 1      EACH 27,000.00 27,000.00            
                       
 CONTRACTOR TOTAL       10,097,800.70            