| DBE GOAL FED |
| Lead Project: 826-03-0012 |
| Parish: JEFFERSON |
| Routes: LA 3152, LA 3139 |
| Description: CLEARVIEW / EARHART DRAINAGE IMPROVEMENTS (PHASE 2) |
Type Const:
grading, excavation and embankment, drainage structures, water and sewer modifications,
and related work. |
| Estimated Construction Cost: $5,195,062.30 |
|
| |
| Rank | License | Bidder | Construction Bid |
| 1 | 27634 |
PHYLWAY CONSTRUCTION LLC | $4,831,575.00 |
| 2 | 00935 |
FLEMING CONSTRUCTION CO., INC. | $5,422,245.50 |
| 3 | 40038 |
COMMAND CONSTRUCTION LLC | $5,634,008.50 |
| 4 | 11242 |
GILMORE & SON CONSTRUCTION CORP. | $6,198,271.00 |
| 5 | 02179 |
BOH BROS. CONSTRUCTION CO., LLC. | $6,210,562.00 |
| 6 | 06276 |
BARRIERE CONSTRUCTION CO., LLC. | $6,384,819.40 |
| 7 | 36961 |
CYCLE CONSTRUCTION CO. L.L.C. | $6,563,063.00 |
| 8 | 45210 |
CERES ENVIRONMENTAL SERVICES,INC. | $8,542,438.13 |
| 9 | 35678 |
BEVERLY CONSTRUCTION CO. LLC | $10,097,800.70 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PHYLWAY CONSTRUCTION LLC |
- 2 - FLEMING CONSTRUCTION CO., INC. |
- 3 - COMMAND CONSTRUCTION LLC |
- 4 - GILMORE & SON CONSTRUCTION CORP. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
6,000.00 |
6,000.00 |
75,000.00 |
75,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| 202-02-I |
removal of concrete pipe (31" x 51")
|
120   |
LNFT |
30.00 |
3,600.00 |
64.00 |
7,680.00 |
5.00 |
600.00 |
30.00 |
3,600.00 |
| 202-02-J |
removal of concrete pipe (48")
|
494   |
LNFT |
15.00 |
7,410.00 |
53.00 |
26,182.00 |
5.00 |
2,470.00 |
30.00 |
14,820.00 |
| 202-02-K |
removal of concrete pipe (24")
|
200   |
LNFT |
24.00 |
4,800.00 |
45.00 |
9,000.00 |
5.00 |
1,000.00 |
20.00 |
4,000.00 |
| 202-02-L |
removal of corrugated metal pipe (62" x 102")
|
104   |
LNFT |
55.00 |
5,720.00 |
18.00 |
1,872.00 |
5.00 |
520.00 |
40.00 |
4,160.00 |
| 202-02-M |
removal of corrugated metal pipe (48")
|
65   |
LNFT |
38.00 |
2,470.00 |
32.00 |
2,080.00 |
5.00 |
325.00 |
25.00 |
1,625.00 |
| 202-02-N |
removal of corrugated metal pipe (24")
|
60   |
LNFT |
24.00 |
1,440.00 |
34.00 |
2,040.00 |
5.00 |
300.00 |
15.00 |
900.00 |
| 202-02-O |
removal of concrete catch basin/drop inlet
|
4   |
EACH |
800.00 |
3,200.00 |
800.00 |
3,200.00 |
500.00 |
2,000.00 |
400.00 |
1,600.00 |
| 202-02-P |
removal of water line (12")
|
118   |
LNFT |
24.00 |
2,832.00 |
25.00 |
2,950.00 |
5.00 |
590.00 |
10.00 |
1,180.00 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
315,000.00 |
315,000.00 |
148,000.00 |
148,000.00 |
385,000.00 |
385,000.00 |
240,000.00 |
240,000.00 |
| 204-06 |
temporary silt fencing
|
2,100   |
LNFT |
1.60 |
3,360.00 |
7.00 |
14,700.00 |
2.00 |
4,200.00 |
10.00 |
21,000.00 |
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
38   |
LNFT |
225.00 |
8,550.00 |
206.00 |
7,828.00 |
170.00 |
6,460.00 |
140.00 |
5,320.00 |
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
25   |
LNFT |
260.00 |
6,500.00 |
235.00 |
5,875.00 |
220.00 |
5,500.00 |
170.00 |
4,250.00 |
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
122   |
LNFT |
290.00 |
35,380.00 |
280.00 |
34,160.00 |
375.00 |
45,750.00 |
220.00 |
26,840.00 |
| 701-03-Q |
storm drain pipe (60" rcp/pcp)
|
2,682   |
LNFT |
325.00 |
871,650.00 |
345.00 |
925,290.00 |
400.00 |
1,072,800.00 |
370.00 |
992,340.00 |
| 701-12-G |
corrugated metal pipe (extension)(18")
|
30   |
LNFT |
150.00 |
4,500.00 |
200.00 |
6,000.00 |
65.00 |
1,950.00 |
70.00 |
2,100.00 |
| 701-12-I |
corrugated metal pipe (extension)(24")
|
80   |
LNFT |
150.00 |
12,000.00 |
195.00 |
15,600.00 |
70.00 |
5,600.00 |
100.00 |
8,000.00 |
| 701-12-Q |
corrugated metal pipe (extension)(60")
|
95   |
LNFT |
250.00 |
23,750.00 |
248.00 |
23,560.00 |
75.00 |
7,125.00 |
330.00 |
31,350.00 |
| 701-12-S |
corrugated metal pipe (extension)(72")
|
400   |
LNFT |
300.00 |
120,000.00 |
300.00 |
120,000.00 |
200.00 |
80,000.00 |
380.00 |
152,000.00 |
| 701-15 |
concrete collar
|
9   |
EACH |
1,000.00 |
9,000.00 |
4,700.00 |
42,300.00 |
1,000.00 |
9,000.00 |
5,000.00 |
45,000.00 |
| 702-02-G |
manholes (mh-12.5 x 9)
|
6   |
EACH |
6,000.00 |
36,000.00 |
18,000.00 |
108,000.00 |
7,500.00 |
45,000.00 |
22,000.00 |
132,000.00 |
| 702-03-C |
catch basins (cb-06)
|
4   |
EACH |
6,000.00 |
24,000.00 |
6,400.00 |
25,600.00 |
5,000.00 |
20,000.00 |
16,000.00 |
64,000.00 |
| 702-03-I |
catch basins (cb-opntop4)
|
14   |
EACH |
12,000.00 |
168,000.00 |
15,000.00 |
210,000.00 |
12,000.00 |
168,000.00 |
16,000.00 |
224,000.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
3,098.9 |
SQYD |
40.00 |
123,956.00 |
40.00 |
123,956.00 |
35.00 |
108,461.50 |
100.00 |
309,890.00 |
| 712-02 |
sacked concrete revetment
|
1,200   |
SQYD |
40.00 |
48,000.00 |
73.00 |
87,600.00 |
50.00 |
60,000.00 |
50.00 |
60,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
24,000.00 |
24,000.00 |
30,000.00 |
30,000.00 |
1,000.00 |
1,000.00 |
50,000.00 |
50,000.00 |
| 713-07 |
temporary precast concrete barrier (contractor
furnished) |
50   |
EACH |
600.00 |
30,000.00 |
950.00 |
47,500.00 |
500.00 |
25,000.00 |
1,000.00 |
50,000.00 |
| 713-10 |
temporary precast concrete barrier movement
|
25   |
EACH |
50.00 |
1,250.00 |
200.00 |
5,000.00 |
200.00 |
5,000.00 |
300.00 |
7,500.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
8,000.00 |
8,000.00 |
15,000.00 |
15,000.00 |
1,000.00 |
1,000.00 |
60,000.00 |
60,000.00 |
| 726-01 |
bedding material
|
5,218.1 |
CUYD |
60.00 |
313,086.00 |
65.00 |
339,176.50 |
100.00 |
521,810.00 |
60.00 |
313,086.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
280,000.00 |
280,000.00 |
190,000.00 |
190,000.00 |
500,000.00 |
500,000.00 |
220,000.00 |
220,000.00 |
| 739-01 |
hydro-seeding
|
10.50 |
ACRE |
1,000.00 |
10,500.00 |
2,500.00 |
26,250.00 |
1,000.00 |
10,500.00 |
3,000.00 |
31,500.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
36,000.00 |
36,000.00 |
32,000.00 |
32,000.00 |
1,000.00 |
1,000.00 |
70,000.00 |
70,000.00 |
| S-001 |
junction box
|
2   |
EACH |
16,000.00 |
32,000.00 |
47,000.00 |
94,000.00 |
20,000.00 |
40,000.00 |
40,000.00 |
80,000.00 |
| S-002 |
duckbill check valve (60" rubber)
|
2   |
EACH |
45,000.00 |
90,000.00 |
53,000.00 |
106,000.00 |
30,000.00 |
60,000.00 |
40,000.00 |
80,000.00 |
| S-003 |
reinforced concrete flume
|
800   |
LNFT |
710.00 |
568,000.00 |
985.00 |
788,000.00 |
1,000.00 |
800,000.00 |
1,030.00 |
824,000.00 |
| S-004 |
jacked or bored steel pipe (60" dia., 1.25" thick)
|
452   |
LNFT |
1,425.00 |
644,100.00 |
1,650.00 |
745,800.00 |
1,750.00 |
791,000.00 |
1,720.00 |
777,440.00 |
| S-005 |
jacked or bored steel pipe (60" dia., 0.75" thick)
|
320   |
LNFT |
1,240.00 |
396,800.00 |
1,400.00 |
448,000.00 |
1,500.00 |
480,000.00 |
1,470.00 |
470,400.00 |
| S-006 |
waterline aerial crossing (12" long span dip. sta
10+85) |
lump |
LUMP |
16,000.00 |
16,000.00 |
19,500.00 |
19,500.00 |
7,500.00 |
7,500.00 |
46,000.00 |
46,000.00 |
| S-007 |
waterline aerial crossing (12" long span dip. sta
17+97) |
lump |
LUMP |
16,000.00 |
16,000.00 |
19,500.00 |
19,500.00 |
7,500.00 |
7,500.00 |
47,000.00 |
47,000.00 |
| S-008 |
interior bent
|
4   |
EACH |
12,000.00 |
48,000.00 |
17,500.00 |
70,000.00 |
10,000.00 |
40,000.00 |
16,000.00 |
64,000.00 |
| S-009 |
end bent
|
4   |
EACH |
10,000.00 |
40,000.00 |
17,500.00 |
70,000.00 |
11,000.00 |
44,000.00 |
15,000.00 |
60,000.00 |
| S-010 |
gate valve (12")
|
7   |
EACH |
2,800.00 |
19,600.00 |
2,000.00 |
14,000.00 |
2,500.00 |
17,500.00 |
2,500.00 |
17,500.00 |
| S-011 |
water line (12" dip unrestrained joint)
|
410.0 |
LNFT |
54.00 |
22,140.00 |
90.00 |
36,900.00 |
90.00 |
36,900.00 |
80.00 |
32,800.00 |
| S-012 |
water line (12" dip restrained joint)
|
547.0 |
LNFT |
80.00 |
43,760.00 |
170.00 |
92,990.00 |
110.00 |
60,170.00 |
120.00 |
65,640.00 |
| S-013 |
thrust blocking (steel sheet pile)
|
4   |
EACH |
1,350.00 |
5,400.00 |
5,400.00 |
21,600.00 |
500.00 |
2,000.00 |
500.00 |
2,000.00 |
| S-014 |
box culvert crossing
|
1   |
EACH |
8,000.00 |
8,000.00 |
10,500.00 |
10,500.00 |
4,000.00 |
4,000.00 |
18,000.00 |
18,000.00 |
| S-015 |
cleaning existing box culverts (per barrel)
|
884   |
LNFT |
26.00 |
22,984.00 |
50.00 |
44,200.00 |
20.00 |
17,680.00 |
40.00 |
35,360.00 |
| S-016 |
sanitary sewer force main (4" c-900 restrained joint)
|
150   |
LNFT |
20.00 |
3,000.00 |
120.00 |
18,000.00 |
40.00 |
6,000.00 |
50.00 |
7,500.00 |
| S-017 |
sanitary sewer force main (4" c-900 unrestrained joint)
|
150   |
LNFT |
30.00 |
4,500.00 |
120.00 |
18,000.00 |
35.00 |
5,250.00 |
80.00 |
12,000.00 |
| S-018 |
water line (6" dip restrained joint)
|
20   |
LNFT |
40.00 |
800.00 |
200.00 |
4,000.00 |
100.00 |
2,000.00 |
90.00 |
1,800.00 |
| S-019 |
fire hydrant assembly
|
1   |
EACH |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
7,000.00 |
7,000.00 |
3,500.00 |
3,500.00 |
| S-020 |
cleaning drainage culverts (less than 18")
|
3,461   |
LNFT |
11.00 |
38,071.00 |
4.00 |
13,844.00 |
1.00 |
3,461.00 |
10.00 |
34,610.00 |
| S-021 |
cleaning drainage culverts (18" to 36")
|
5,173   |
LNFT |
22.00 |
113,806.00 |
4.00 |
20,692.00 |
2.00 |
10,346.00 |
20.00 |
103,460.00 |
| S-022 |
cleaning drainage culverts (larger than 36")
|
4,580   |
LNFT |
27.00 |
123,660.00 |
4.00 |
18,320.00 |
3.00 |
13,740.00 |
40.00 |
183,200.00 |
| S-023 |
impact attenuator (construction zone)
|
1   |
EACH |
20,000.00 |
20,000.00 |
29,000.00 |
29,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,831,575.00 |
|
5,422,245.50 |
|
5,634,008.50 |
|
6,198,271.00 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BOH BROS. CONSTRUCTION CO., LLC. |
- 6 - BARRIERE CONSTRUCTION CO., LLC. |
- 7 - CYCLE CONSTRUCTION CO. L.L.C. |
- 8 - CERES ENVIRONMENTAL SERVICES,INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
20,000.00 |
20,000.00 |
86,125.00 |
86,125.00 |
| 202-02-I |
removal of concrete pipe (31" x 51")
|
120   |
LNFT |
16.00 |
1,920.00 |
50.00 |
6,000.00 |
30.00 |
3,600.00 |
25.75 |
3,090.00 |
| 202-02-J |
removal of concrete pipe (48")
|
494   |
LNFT |
17.00 |
8,398.00 |
50.00 |
24,700.00 |
25.00 |
12,350.00 |
27.25 |
13,461.50 |
| 202-02-K |
removal of concrete pipe (24")
|
200   |
LNFT |
14.00 |
2,800.00 |
30.00 |
6,000.00 |
16.00 |
3,200.00 |
22.44 |
4,488.00 |
| 202-02-L |
removal of corrugated metal pipe (62" x 102")
|
104   |
LNFT |
20.00 |
2,080.00 |
90.00 |
9,360.00 |
40.00 |
4,160.00 |
86.29 |
8,974.16 |
| 202-02-M |
removal of corrugated metal pipe (48")
|
65   |
LNFT |
13.00 |
845.00 |
50.00 |
3,250.00 |
25.00 |
1,625.00 |
69.04 |
4,487.60 |
| 202-02-N |
removal of corrugated metal pipe (24")
|
60   |
LNFT |
12.00 |
720.00 |
40.00 |
2,400.00 |
16.00 |
960.00 |
53.18 |
3,190.80 |
| 202-02-O |
removal of concrete catch basin/drop inlet
|
4   |
EACH |
200.00 |
800.00 |
900.00 |
3,600.00 |
500.00 |
2,000.00 |
2,852.75 |
11,411.00 |
| 202-02-P |
removal of water line (12")
|
118   |
LNFT |
15.00 |
1,770.00 |
30.00 |
3,540.00 |
30.00 |
3,540.00 |
27.04 |
3,190.72 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
410,000.00 |
410,000.00 |
250,000.00 |
250,000.00 |
250,000.00 |
250,000.00 |
738,562.50 |
738,562.50 |
| 204-06 |
temporary silt fencing
|
2,100   |
LNFT |
1.50 |
3,150.00 |
2.00 |
4,200.00 |
2.00 |
4,200.00 |
3.38 |
7,098.00 |
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
38   |
LNFT |
200.00 |
7,600.00 |
230.00 |
8,740.00 |
300.00 |
11,400.00 |
120.93 |
4,595.34 |
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
25   |
LNFT |
215.00 |
5,375.00 |
300.00 |
7,500.00 |
400.00 |
10,000.00 |
131.05 |
3,276.25 |
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
122   |
LNFT |
280.00 |
34,160.00 |
300.00 |
36,600.00 |
400.00 |
48,800.00 |
127.06 |
15,501.32 |
| 701-03-Q |
storm drain pipe (60" rcp/pcp)
|
2,682   |
LNFT |
360.00 |
965,520.00 |
380.00 |
1,019,160.00 |
455.00 |
1,220,310.00 |
176.21 |
472,595.22 |
| 701-12-G |
corrugated metal pipe (extension)(18")
|
30   |
LNFT |
135.00 |
4,050.00 |
144.00 |
4,320.00 |
400.00 |
12,000.00 |
108.24 |
3,247.20 |
| 701-12-I |
corrugated metal pipe (extension)(24")
|
80   |
LNFT |
150.00 |
12,000.00 |
195.00 |
15,600.00 |
400.00 |
32,000.00 |
96.19 |
7,695.20 |
| 701-12-Q |
corrugated metal pipe (extension)(60")
|
95   |
LNFT |
420.00 |
39,900.00 |
330.00 |
31,350.00 |
650.00 |
61,750.00 |
233.18 |
22,152.10 |
| 701-12-S |
corrugated metal pipe (extension)(72")
|
400   |
LNFT |
500.00 |
200,000.00 |
370.00 |
148,000.00 |
850.00 |
340,000.00 |
399.95 |
159,980.00 |
| 701-15 |
concrete collar
|
9   |
EACH |
2,500.00 |
22,500.00 |
2,000.00 |
18,000.00 |
6,000.00 |
54,000.00 |
6,060.00 |
54,540.00 |
| 702-02-G |
manholes (mh-12.5 x 9)
|
6   |
EACH |
6,500.00 |
39,000.00 |
8,000.00 |
48,000.00 |
20,000.00 |
120,000.00 |
87,941.66 |
527,649.96 |
| 702-03-C |
catch basins (cb-06)
|
4   |
EACH |
5,500.00 |
22,000.00 |
8,700.00 |
34,800.00 |
10,000.00 |
40,000.00 |
11,040.00 |
44,160.00 |
| 702-03-I |
catch basins (cb-opntop4)
|
14   |
EACH |
10,000.00 |
140,000.00 |
12,000.00 |
168,000.00 |
20,000.00 |
280,000.00 |
17,595.00 |
246,330.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
3,098.9 |
SQYD |
70.00 |
216,923.00 |
48.00 |
148,747.20 |
55.00 |
170,439.50 |
51.04 |
158,167.86 |
| 712-02 |
sacked concrete revetment
|
1,200   |
SQYD |
100.00 |
120,000.00 |
43.00 |
51,600.00 |
32.00 |
38,400.00 |
88.23 |
105,876.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
86,000.00 |
86,000.00 |
80,000.00 |
80,000.00 |
75,830.00 |
75,830.00 |
| 713-07 |
temporary precast concrete barrier (contractor
furnished) |
50   |
EACH |
1,500.00 |
75,000.00 |
1,300.00 |
65,000.00 |
1,000.00 |
50,000.00 |
1,394.30 |
69,715.00 |
| 713-10 |
temporary precast concrete barrier movement
|
25   |
EACH |
200.00 |
5,000.00 |
550.00 |
13,750.00 |
350.00 |
8,750.00 |
350.70 |
8,767.50 |
| 722-01 |
project site laboratory
|
1   |
EACH |
35,000.00 |
35,000.00 |
42,000.00 |
42,000.00 |
10,000.00 |
10,000.00 |
41,200.00 |
41,200.00 |
| 726-01 |
bedding material
|
5,218.1 |
CUYD |
65.00 |
339,176.50 |
62.00 |
323,522.20 |
105.00 |
547,900.50 |
117.95 |
615,474.90 |
| 727-01 |
mobilization
|
lump |
LUMP |
458,000.00 |
458,000.00 |
400,000.00 |
400,000.00 |
250,000.00 |
250,000.00 |
841,718.75 |
841,718.75 |
| 739-01 |
hydro-seeding
|
10.50 |
ACRE |
750.00 |
7,875.00 |
1,000.00 |
10,500.00 |
1,000.00 |
10,500.00 |
2,258.10 |
23,710.05 |
| 740-01 |
construction layout
|
lump |
LUMP |
120,000.00 |
120,000.00 |
55,000.00 |
55,000.00 |
30,000.00 |
30,000.00 |
189,637.50 |
189,637.50 |
| S-001 |
junction box
|
2   |
EACH |
50,000.00 |
100,000.00 |
70,000.00 |
140,000.00 |
54,000.00 |
108,000.00 |
23,975.00 |
47,950.00 |
| S-002 |
duckbill check valve (60" rubber)
|
2   |
EACH |
40,000.00 |
80,000.00 |
50,000.00 |
100,000.00 |
56,000.00 |
112,000.00 |
7,130.00 |
14,260.00 |
| S-003 |
reinforced concrete flume
|
800   |
LNFT |
1,500.00 |
1,200,000.00 |
1,400.00 |
1,120,000.00 |
1,120.00 |
896,000.00 |
1,710.01 |
1,368,008.00 |
| S-004 |
jacked or bored steel pipe (60" dia., 1.25" thick)
|
452   |
LNFT |
1,500.00 |
678,000.00 |
1,800.00 |
813,600.00 |
1,650.00 |
745,800.00 |
2,023.69 |
914,707.88 |
| S-005 |
jacked or bored steel pipe (60" dia., 0.75" thick)
|
320   |
LNFT |
1,200.00 |
384,000.00 |
1,500.00 |
480,000.00 |
1,420.00 |
454,400.00 |
1,768.80 |
566,016.00 |
| S-006 |
waterline aerial crossing (12" long span dip. sta
10+85) |
lump |
LUMP |
45,000.00 |
45,000.00 |
20,000.00 |
20,000.00 |
46,000.00 |
46,000.00 |
52,037.50 |
52,037.50 |
| S-007 |
waterline aerial crossing (12" long span dip. sta
17+97) |
lump |
LUMP |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
46,000.00 |
46,000.00 |
51,362.50 |
51,362.50 |
| S-008 |
interior bent
|
4   |
EACH |
7,800.00 |
31,200.00 |
15,000.00 |
60,000.00 |
14,000.00 |
56,000.00 |
16,555.20 |
66,220.80 |
| S-009 |
end bent
|
4   |
EACH |
7,400.00 |
29,600.00 |
15,000.00 |
60,000.00 |
12,000.00 |
48,000.00 |
14,805.60 |
59,222.40 |
| S-010 |
gate valve (12")
|
7   |
EACH |
1,500.00 |
10,500.00 |
3,000.00 |
21,000.00 |
2,500.00 |
17,500.00 |
5,546.85 |
38,827.95 |
| S-011 |
water line (12" dip unrestrained joint)
|
410.0 |
LNFT |
85.00 |
34,850.00 |
80.00 |
32,800.00 |
100.00 |
41,000.00 |
87.36 |
35,817.60 |
| S-012 |
water line (12" dip restrained joint)
|
547.0 |
LNFT |
120.00 |
65,640.00 |
100.00 |
54,700.00 |
145.00 |
79,315.00 |
110.69 |
60,547.43 |
| S-013 |
thrust blocking (steel sheet pile)
|
4   |
EACH |
1,000.00 |
4,000.00 |
1,000.00 |
4,000.00 |
5,000.00 |
20,000.00 |
2,057.50 |
8,230.00 |
| S-014 |
box culvert crossing
|
1   |
EACH |
20,000.00 |
20,000.00 |
13,000.00 |
13,000.00 |
15,000.00 |
15,000.00 |
47,987.50 |
47,987.50 |
| S-015 |
cleaning existing box culverts (per barrel)
|
884   |
LNFT |
40.00 |
35,360.00 |
28.00 |
24,752.00 |
15.00 |
13,260.00 |
83.40 |
73,725.60 |
| S-016 |
sanitary sewer force main (4" c-900 restrained joint)
|
150   |
LNFT |
35.00 |
5,250.00 |
50.00 |
7,500.00 |
60.00 |
9,000.00 |
44.60 |
6,690.00 |
| S-017 |
sanitary sewer force main (4" c-900 unrestrained joint)
|
150   |
LNFT |
30.00 |
4,500.00 |
51.00 |
7,650.00 |
50.00 |
7,500.00 |
39.88 |
5,982.00 |
| S-018 |
water line (6" dip restrained joint)
|
20   |
LNFT |
45.00 |
900.00 |
100.00 |
2,000.00 |
200.00 |
4,000.00 |
192.94 |
3,858.80 |
| S-019 |
fire hydrant assembly
|
1   |
EACH |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
7,319.90 |
7,319.90 |
| S-020 |
cleaning drainage culverts (less than 18")
|
3,461   |
LNFT |
3.25 |
11,248.25 |
12.00 |
41,532.00 |
5.00 |
17,305.00 |
26.96 |
93,308.56 |
| S-021 |
cleaning drainage culverts (18" to 36")
|
5,173   |
LNFT |
5.25 |
27,158.25 |
22.00 |
113,806.00 |
6.00 |
31,038.00 |
36.96 |
191,194.08 |
| S-022 |
cleaning drainage culverts (larger than 36")
|
4,580   |
LNFT |
5.85 |
26,793.00 |
28.00 |
128,240.00 |
7.00 |
32,060.00 |
48.74 |
223,229.20 |
| S-023 |
impact attenuator (construction zone)
|
1   |
EACH |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
26,000.00 |
26,000.00 |
30,035.00 |
30,035.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
6,210,562.00 |
|
6,384,819.40 |
|
6,563,063.00 |
|
8,542,438.13 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 9 - BEVERLY CONSTRUCTION CO. LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
34,000.00 |
34,000.00 |
|
|
|
|
|
|
| 202-02-I |
removal of concrete pipe (31" x 51")
|
120   |
LNFT |
50.00 |
6,000.00 |
|
|
|
|
|
|
| 202-02-J |
removal of concrete pipe (48")
|
494   |
LNFT |
47.00 |
23,218.00 |
|
|
|
|
|
|
| 202-02-K |
removal of concrete pipe (24")
|
200   |
LNFT |
33.00 |
6,600.00 |
|
|
|
|
|
|
| 202-02-L |
removal of corrugated metal pipe (62" x 102")
|
104   |
LNFT |
70.00 |
7,280.00 |
|
|
|
|
|
|
| 202-02-M |
removal of corrugated metal pipe (48")
|
65   |
LNFT |
51.00 |
3,315.00 |
|
|
|
|
|
|
| 202-02-N |
removal of corrugated metal pipe (24")
|
60   |
LNFT |
40.00 |
2,400.00 |
|
|
|
|
|
|
| 202-02-O |
removal of concrete catch basin/drop inlet
|
4   |
EACH |
1,100.00 |
4,400.00 |
|
|
|
|
|
|
| 202-02-P |
removal of water line (12")
|
118   |
LNFT |
50.00 |
5,900.00 |
|
|
|
|
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
478,000.00 |
478,000.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
2,100   |
LNFT |
3.10 |
6,510.00 |
|
|
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
38   |
LNFT |
175.00 |
6,650.00 |
|
|
|
|
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
25   |
LNFT |
200.00 |
5,000.00 |
|
|
|
|
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
122   |
LNFT |
220.00 |
26,840.00 |
|
|
|
|
|
|
| 701-03-Q |
storm drain pipe (60" rcp/pcp)
|
2,682   |
LNFT |
260.00 |
697,320.00 |
|
|
|
|
|
|
| 701-12-G |
corrugated metal pipe (extension)(18")
|
30   |
LNFT |
134.00 |
4,020.00 |
|
|
|
|
|
|
| 701-12-I |
corrugated metal pipe (extension)(24")
|
80   |
LNFT |
148.00 |
11,840.00 |
|
|
|
|
|
|
| 701-12-Q |
corrugated metal pipe (extension)(60")
|
95   |
LNFT |
280.00 |
26,600.00 |
|
|
|
|
|
|
| 701-12-S |
corrugated metal pipe (extension)(72")
|
400   |
LNFT |
325.00 |
130,000.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
9   |
EACH |
1,700.00 |
15,300.00 |
|
|
|
|
|
|
| 702-02-G |
manholes (mh-12.5 x 9)
|
6   |
EACH |
6,400.00 |
38,400.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
4   |
EACH |
7,800.00 |
31,200.00 |
|
|
|
|
|
|
| 702-03-I |
catch basins (cb-opntop4)
|
14   |
EACH |
11,000.00 |
154,000.00 |
|
|
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
3,098.9 |
SQYD |
55.00 |
170,439.50 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
1,200   |
SQYD |
67.00 |
80,400.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 713-07 |
temporary precast concrete barrier (contractor
furnished) |
50   |
EACH |
1,000.00 |
50,000.00 |
|
|
|
|
|
|
| 713-10 |
temporary precast concrete barrier movement
|
25   |
EACH |
115.00 |
2,875.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
42,000.00 |
42,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
5,218.1 |
CUYD |
82.00 |
427,884.20 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
190,000.00 |
190,000.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
10.50 |
ACRE |
1,800.00 |
18,900.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
71,000.00 |
71,000.00 |
|
|
|
|
|
|
| S-001 |
junction box
|
2   |
EACH |
34,000.00 |
68,000.00 |
|
|
|
|
|
|
| S-002 |
duckbill check valve (60" rubber)
|
2   |
EACH |
43,500.00 |
87,000.00 |
|
|
|
|
|
|
| S-003 |
reinforced concrete flume
|
800   |
LNFT |
790.00 |
632,000.00 |
|
|
|
|
|
|
| S-004 |
jacked or bored steel pipe (60" dia., 1.25" thick)
|
452   |
LNFT |
1,642.00 |
742,184.00 |
|
|
|
|
|
|
| S-005 |
jacked or bored steel pipe (60" dia., 0.75" thick)
|
320   |
LNFT |
1,435.00 |
459,200.00 |
|
|
|
|
|
|
| S-006 |
waterline aerial crossing (12" long span dip. sta
10+85) |
lump |
LUMP |
14,500.00 |
14,500.00 |
|
|
|
|
|
|
| S-007 |
waterline aerial crossing (12" long span dip. sta
17+97) |
lump |
LUMP |
14,500.00 |
14,500.00 |
|
|
|
|
|
|
| S-008 |
interior bent
|
4   |
EACH |
12,500.00 |
50,000.00 |
|
|
|
|
|
|
| S-009 |
end bent
|
4   |
EACH |
13,250.00 |
53,000.00 |
|
|
|
|
|
|
| S-010 |
gate valve (12")
|
7   |
EACH |
2,900.00 |
20,300.00 |
|
|
|
|
|
|
| S-011 |
water line (12" dip unrestrained joint)
|
410.0 |
LNFT |
60.00 |
24,600.00 |
|
|
|
|
|
|
| S-012 |
water line (12" dip restrained joint)
|
547.0 |
LNFT |
82.00 |
44,854.00 |
|
|
|
|
|
|
| S-013 |
thrust blocking (steel sheet pile)
|
4   |
EACH |
1,400.00 |
5,600.00 |
|
|
|
|
|
|
| S-014 |
box culvert crossing
|
1   |
EACH |
11,500.00 |
11,500.00 |
|
|
|
|
|
|
| S-015 |
cleaning existing box culverts (per barrel)
|
884   |
LNFT |
11.00 |
9,724.00 |
|
|
|
|
|
|
| S-016 |
sanitary sewer force main (4" c-900 restrained joint)
|
150   |
LNFT |
21.00 |
3,150.00 |
|
|
|
|
|
|
| S-017 |
sanitary sewer force main (4" c-900 unrestrained joint)
|
150   |
LNFT |
26.00 |
3,900.00 |
|
|
|
|
|
|
| S-018 |
water line (6" dip restrained joint)
|
20   |
LNFT |
65.00 |
1,300.00 |
|
|
|
|
|
|
| S-019 |
fire hydrant assembly
|
1   |
EACH |
4,500.00 |
4,500.00 |
|
|
|
|
|
|
| S-020 |
cleaning drainage culverts (less than 18")
|
3,461   |
LNFT |
7.00 |
24,227.00 |
|
|
|
|
|
|
| S-021 |
cleaning drainage culverts (18" to 36")
|
5,173   |
LNFT |
950.00 |
4,914,350.00 |
|
|
|
|
|
|
| S-022 |
cleaning drainage culverts (larger than 36")
|
4,580   |
LNFT |
14.00 |
64,120.00 |
|
|
|
|
|
|
| S-023 |
impact attenuator (construction zone)
|
1   |
EACH |
27,000.00 |
27,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
10,097,800.70 |
|
|
|
|
|
|
|