| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,500.00 |
1,500.00 |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
247   |
SQYD |
15.00 |
3,705.00 |
15.00 |
3,705.00 |
30.00 |
7,410.00 |
|
|
| 202-02-H |
removal of guard rail
|
350   |
LNFT |
5.00 |
1,750.00 |
10.00 |
3,500.00 |
6.00 |
2,100.00 |
|
|
| 203-07 |
borrow (vehicular meas.)(selected soils)
|
3,032   |
CUYD |
5.00 |
15,160.00 |
1.00 |
3,032.00 |
10.00 |
30,320.00 |
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
2,215   |
CUYD |
5.00 |
11,075.00 |
16.00 |
35,440.00 |
20.00 |
44,300.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
100.00 |
1,000.00 |
115.00 |
1,150.00 |
150.00 |
1,500.00 |
|
|
| 204-06 |
temporary silt fencing
|
31,258   |
LNFT |
1.50 |
46,887.00 |
1.50 |
46,887.00 |
1.35 |
42,198.30 |
|
|
| 304-01 |
lime
|
28.20 |
TON |
100.00 |
2,820.00 |
150.00 |
4,230.00 |
160.00 |
4,512.00 |
|
|
| 304-03-D |
lime treatment (type c) (12" thick)
|
996   |
SQYD |
2.00 |
1,992.00 |
3.00 |
2,988.00 |
2.00 |
1,992.00 |
|
|
| 304-05 |
lime treatment (type e)
|
56.47 |
TON |
200.00 |
11,294.00 |
275.00 |
15,529.25 |
200.00 |
11,294.00 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
79,676   |
SQYD |
4.00 |
318,704.00 |
7.25 |
577,651.00 |
8.00 |
637,408.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,547   |
CUYD |
12.00 |
30,564.00 |
10.00 |
25,470.00 |
40.00 |
101,880.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
60.00 |
30,000.00 |
20.00 |
10,000.00 |
35.00 |
17,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
14,670.8 |
TON |
60.00 |
880,248.00 |
68.75 |
1,008,617.50 |
70.00 |
1,026,956.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,223.3 |
TON |
60.00 |
73,398.00 |
90.00 |
110,097.00 |
100.00 |
122,330.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
69,283   |
SQYD |
4.00 |
277,132.00 |
2.90 |
200,920.70 |
3.50 |
242,490.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,330   |
CUYD |
0.01 |
- 43.30 |
0.01 |
- 43.30 |
0.00 |
0.00 |
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
32   |
LNFT |
200.00 |
6,400.00 |
150.00 |
4,800.00 |
250.00 |
8,000.00 |
|
|
| 701-08 |
relaying pipe
|
24   |
LNFT |
100.00 |
2,400.00 |
100.00 |
2,400.00 |
400.00 |
9,600.00 |
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
1,500.00 |
4,500.00 |
3,500.00 |
10,500.00 |
1,500.00 |
4,500.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
160.0 |
LNFT |
30.00 |
4,800.00 |
32.00 |
5,120.00 |
40.00 |
6,400.00 |
|
|
| 704-03 |
blocked out guard rail
|
100.9 |
LNFT |
20.00 |
2,018.00 |
18.50 |
1,866.65 |
25.00 |
2,522.50 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
91.7 |
LNFT |
50.00 |
4,585.00 |
52.00 |
4,768.40 |
60.00 |
5,502.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,400.00 |
4,800.00 |
2,400.00 |
4,800.00 |
3,000.00 |
6,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
25,000.00 |
25,000.00 |
60,000.00 |
60,000.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
96   |
LNFT |
0.50 |
48.00 |
1.00 |
96.00 |
2.00 |
192.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.760 |
MILE |
500.00 |
8,880.00 |
325.00 |
5,772.00 |
350.00 |
6,216.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.285 |
MILE |
500.00 |
142.50 |
300.00 |
85.50 |
500.00 |
142.50 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
35.415 |
MILE |
100.00 |
3,541.50 |
600.00 |
21,249.00 |
500.00 |
17,707.50 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 726-01 |
bedding material
|
23.8 |
CUYD |
0.00 |
0.00 |
125.00 |
2,975.00 |
40.00 |
952.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
290,000.00 |
290,000.00 |
190,000.00 |
190,000.00 |
100,000.00 |
100,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
80   |
EACH |
60.00 |
4,800.00 |
65.00 |
5,200.00 |
75.00 |
6,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
70.00 |
280.00 |
80.00 |
320.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
782   |
EACH |
6.00 |
4,692.00 |
4.50 |
3,519.00 |
6.00 |
4,692.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
96   |
LNFT |
5.00 |
480.00 |
3.00 |
288.00 |
5.00 |
480.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
23.645 |
MILE |
3,000.00 |
70,935.00 |
2,500.00 |
59,112.50 |
3,000.00 |
70,935.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.095 |
MILE |
900.00 |
85.50 |
1,000.00 |
95.00 |
1,000.00 |
95.00 |
|
|
| 735-01 |
mailboxes
|
38   |
EACH |
5.00 |
190.00 |
5.00 |
190.00 |
2.00 |
76.00 |
|
|
| 735-02 |
mailbox supports (single)
|
35   |
EACH |
150.00 |
5,250.00 |
125.00 |
4,375.00 |
120.00 |
4,200.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
300.00 |
300.00 |
200.00 |
200.00 |
300.00 |
300.00 |
|
|
| 739-01 |
hydro-seeding
|
7.18 |
ACRE |
1,200.00 |
8,616.00 |
1,000.00 |
7,180.00 |
1,000.00 |
7,180.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
|
|
| S-001 |
special anchor section
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,025.00 |
2,050.00 |
3,000.00 |
6,000.00 |
|
|
| S-002 |
saw cutting driveways (6" deep)
|
742   |
LNFT |
9.00 |
6,678.00 |
7.00 |
5,194.00 |
6.00 |
4,452.00 |
|
|
| S-003 |
traffic maintenance superpave asphaltic concrete
|
20.0 |
TON |
400.00 |
8,000.00 |
70.00 |
1,400.00 |
200.00 |
4,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,462,007.20 |
|
2,467,690.20 |
|
2,680,655.30 |
|
|
|