| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - L & A CONTRACTING CO. |
- 2 - T. L. WALLACE CONSTRUCTION, INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - AUSTIN BRIDGE & ROAD, LP |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 701-05-G-01 |
side drain pipe (18")(bridge end drain)
|
250   |
LNFT |
90.00 |
22,500.00 |
60.00 |
15,000.00 |
80.00 |
20,000.00 |
45.00 |
11,250.00 |
| 702-03-A |
catch basins (cb-01)
|
6   |
EACH |
4,200.00 |
25,200.00 |
4,500.00 |
27,000.00 |
4,000.00 |
24,000.00 |
2,300.00 |
13,800.00 |
| 712-04 |
flexible revetment
|
1,532   |
SQYD |
74.00 |
113,368.00 |
65.00 |
99,580.00 |
70.00 |
107,240.00 |
75.00 |
114,900.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
50,000.00 |
50,000.00 |
11,000.00 |
11,000.00 |
75,000.00 |
75,000.00 |
10,000.00 |
10,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,300,000.00 |
2,300,000.00 |
2,025,000.00 |
2,025,000.00 |
2,400,000.00 |
2,400,000.00 |
2,482,500.00 |
2,482,500.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
750,000.00 |
750,000.00 |
225,000.00 |
225,000.00 |
250,000.00 |
250,000.00 |
450,000.00 |
450,000.00 |
| 804-01-B |
precast concrete piles (14")
|
301   |
LNFT |
94.00 |
28,294.00 |
40.50 |
12,190.50 |
60.00 |
18,060.00 |
60.00 |
18,060.00 |
| 804-01-F |
precast concrete piles (24")
|
46,518   |
LNFT |
81.55 |
3,793,542.90 |
101.00 |
4,698,318.00 |
81.00 |
3,767,958.00 |
85.00 |
3,954,030.00 |
| 804-01-G |
precast concrete piles (30")
|
7,927   |
LNFT |
140.00 |
1,109,780.00 |
188.00 |
1,490,276.00 |
115.00 |
911,605.00 |
118.00 |
935,386.00 |
| 804-05 |
precast concrete test piles
|
2   |
EACH |
14,000.00 |
28,000.00 |
24,000.00 |
48,000.00 |
30,000.00 |
60,000.00 |
26,500.00 |
53,000.00 |
| 804-09 |
loading test piles
|
2   |
EACH |
32,300.00 |
64,600.00 |
30,000.00 |
60,000.00 |
30,000.00 |
60,000.00 |
25,000.00 |
50,000.00 |
| 804-10 |
reloading test piles
|
2   |
EACH |
3,350.00 |
6,700.00 |
3,000.00 |
6,000.00 |
5,000.00 |
10,000.00 |
6,100.00 |
12,200.00 |
| 804-11 |
redriving test piles
|
2   |
EACH |
4,150.00 |
8,300.00 |
6,000.00 |
12,000.00 |
3,000.00 |
6,000.00 |
7,700.00 |
15,400.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
13,400.00 |
26,800.00 |
30,000.00 |
60,000.00 |
2,000.00 |
4,000.00 |
16,500.00 |
33,000.00 |
| 804-17 |
dynamic monitoring
|
6   |
EACH |
4,750.00 |
28,500.00 |
1,000.00 |
6,000.00 |
5,000.00 |
30,000.00 |
1,600.00 |
9,600.00 |
| 805-01-F |
class a concrete (bents)
|
2,409.61 |
CUYD |
450.00 |
1,084,324.50 |
600.00 |
1,445,766.00 |
620.00 |
1,493,958.20 |
760.00 |
1,831,303.60 |
| 805-03 |
class aa concrete
|
10,434.99 |
CUYD |
478.00 |
4,987,925.22 |
550.00 |
5,739,244.50 |
665.00 |
6,939,268.35 |
600.00 |
6,260,994.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
34,418.6 |
LNFT |
91.00 |
3,132,092.60 |
80.00 |
2,753,488.00 |
85.00 |
2,925,581.00 |
97.00 |
3,338,604.20 |
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
13,979.2 |
LNFT |
130.00 |
1,817,296.00 |
138.00 |
1,929,129.60 |
145.00 |
2,026,984.00 |
140.00 |
1,957,088.00 |
| 805-11 |
strip seal joints
|
989.00 |
LNFT |
114.50 |
113,240.50 |
120.00 |
118,680.00 |
150.00 |
148,350.00 |
160.00 |
158,240.00 |
| 806-01 |
deformed reinforcing steel
|
3,072,400   |
LB |
0.96 |
2,949,504.00 |
0.76 |
2,335,024.00 |
0.85 |
2,611,540.00 |
0.95 |
2,918,780.00 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
95,400.00 |
95,400.00 |
50,000.00 |
50,000.00 |
90,000.00 |
90,000.00 |
70,000.00 |
70,000.00 |
| 810-01-A |
concrete railing (barrier)
|
8,788.00 |
LNFT |
60.00 |
527,280.00 |
38.00 |
333,944.00 |
45.00 |
395,460.00 |
35.00 |
307,580.00 |
| 810-01-B |
concrete railing (median barrier)
|
4,322.00 |
LNFT |
75.00 |
324,150.00 |
55.00 |
237,710.00 |
65.00 |
280,930.00 |
45.00 |
194,490.00 |
| 813-01 |
concrete approach slabs
|
1,493.34 |
SQYD |
235.00 |
350,934.90 |
166.00 |
247,894.44 |
220.00 |
328,534.80 |
150.00 |
224,001.00 |
| S-101 |
impact attenuators (kinetic)
|
4   |
EACH |
22,200.00 |
88,800.00 |
35,000.00 |
140,000.00 |
25,000.00 |
100,000.00 |
19,000.00 |
76,000.00 |
| S-102 |
dynamic analysis
|
2   |
each |
1,800.00 |
3,600.00 |
4,000.00 |
8,000.00 |
10,000.00 |
20,000.00 |
1,200.00 |
2,400.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
23,830,132.62 |
|
24,134,245.04 |
|
25,104,469.35 |
|
25,502,606.80 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - HILL BROTHERS CONSTRUCTION CO., INC |
- 6 - JAMES CONSTRUCTION GROUP LLC |
- 7 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 701-05-G-01 |
side drain pipe (18")(bridge end drain)
|
250   |
LNFT |
30.00 |
7,500.00 |
65.00 |
16,250.00 |
65.00 |
16,250.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
6   |
EACH |
4,000.00 |
24,000.00 |
4,000.00 |
24,000.00 |
1,500.00 |
9,000.00 |
|
|
| 712-04 |
flexible revetment
|
1,532   |
SQYD |
55.00 |
84,260.00 |
60.00 |
91,920.00 |
60.00 |
91,920.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
70,000.00 |
70,000.00 |
20,000.00 |
20,000.00 |
45,000.00 |
45,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
2,000,000.00 |
2,000,000.00 |
2,600,000.00 |
2,600,000.00 |
2,600,000.00 |
2,600,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
200,000.00 |
200,000.00 |
400,000.00 |
400,000.00 |
700,000.00 |
700,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
301   |
LNFT |
50.00 |
15,050.00 |
65.00 |
19,565.00 |
82.00 |
24,682.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
46,518   |
LNFT |
86.00 |
4,000,548.00 |
90.00 |
4,186,620.00 |
105.00 |
4,884,390.00 |
|
|
| 804-01-G |
precast concrete piles (30")
|
7,927   |
LNFT |
160.00 |
1,268,320.00 |
135.00 |
1,070,145.00 |
125.00 |
990,875.00 |
|
|
| 804-05 |
precast concrete test piles
|
2   |
EACH |
20,000.00 |
40,000.00 |
35,000.00 |
70,000.00 |
20,000.00 |
40,000.00 |
|
|
| 804-09 |
loading test piles
|
2   |
EACH |
5,500.00 |
11,000.00 |
10,000.00 |
20,000.00 |
54,000.00 |
108,000.00 |
|
|
| 804-10 |
reloading test piles
|
2   |
EACH |
4,000.00 |
8,000.00 |
1,000.00 |
2,000.00 |
500.00 |
1,000.00 |
|
|
| 804-11 |
redriving test piles
|
2   |
EACH |
8,500.00 |
17,000.00 |
1,000.00 |
2,000.00 |
750.00 |
1,500.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
5,500.00 |
11,000.00 |
3,000.00 |
6,000.00 |
15,000.00 |
30,000.00 |
|
|
| 804-17 |
dynamic monitoring
|
6   |
EACH |
3,000.00 |
18,000.00 |
1,500.00 |
9,000.00 |
5,300.00 |
31,800.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
2,409.61 |
CUYD |
625.00 |
1,506,006.25 |
750.00 |
1,807,207.50 |
650.00 |
1,566,246.50 |
|
|
| 805-03 |
class aa concrete
|
10,434.99 |
CUYD |
700.00 |
7,304,493.00 |
650.00 |
6,782,743.50 |
550.00 |
5,739,244.50 |
|
|
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
34,418.6 |
LNFT |
90.00 |
3,097,674.00 |
94.00 |
3,235,348.40 |
110.00 |
3,786,046.00 |
|
|
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
13,979.2 |
LNFT |
140.00 |
1,957,088.00 |
190.00 |
2,656,048.00 |
180.00 |
2,516,256.00 |
|
|
| 805-11 |
strip seal joints
|
989.00 |
LNFT |
150.00 |
148,350.00 |
136.00 |
134,504.00 |
125.00 |
123,625.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
3,072,400   |
LB |
1.00 |
3,072,400.00 |
0.73 |
2,242,852.00 |
0.80 |
2,457,920.00 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
85,000.00 |
85,000.00 |
65,000.00 |
65,000.00 |
65,000.00 |
65,000.00 |
|
|
| 810-01-A |
concrete railing (barrier)
|
8,788.00 |
LNFT |
55.00 |
483,340.00 |
44.00 |
386,672.00 |
40.00 |
351,520.00 |
|
|
| 810-01-B |
concrete railing (median barrier)
|
4,322.00 |
LNFT |
60.00 |
259,320.00 |
56.00 |
242,032.00 |
50.00 |
216,100.00 |
|
|
| 813-01 |
concrete approach slabs
|
1,493.34 |
SQYD |
140.00 |
209,067.60 |
175.00 |
261,334.50 |
180.00 |
268,801.20 |
|
|
| S-101 |
impact attenuators (kinetic)
|
4   |
EACH |
22,000.00 |
88,000.00 |
20,000.00 |
80,000.00 |
20,000.00 |
80,000.00 |
|
|
| S-102 |
dynamic analysis
|
2   |
each |
2,500.00 |
5,000.00 |
1,000.00 |
2,000.00 |
1,800.00 |
3,600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
25,990,416.85 |
|
26,433,241.90 |
|
26,748,776.20 |
|
|
|