DBE GOAL FED
Lead Project: 742-17-0150
Parish: E BATON ROUGE
Routes:
Description: CENTRAL THRUWAY BRIDGES (COMITE AND BEAVER BAYOU NO. 1)
Type Const: precast-prestressed concrete girder span bridges and related work.
Estimated Construction Cost: $31,259,475.00
 
RankLicenseBidderConstruction Bid
1 00755 L & A CONTRACTING CO. $23,830,132.62
2 14422 T. L. WALLACE CONSTRUCTION, INC. $24,134,245.04
3 12312 GILCHRIST CONSTRUCTION CO. LLC $25,104,469.35
4 42076 AUSTIN BRIDGE & ROAD, LP $25,502,606.80
5 12370 HILL BROTHERS CONSTRUCTION CO., INC $25,990,416.85
6 34567 JAMES CONSTRUCTION GROUP LLC $26,433,241.90
7 02179 BOH BROS. CONSTRUCTION CO., LLC. $26,748,776.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
L & A CONTRACTING CO.
- 2 -
T. L. WALLACE CONSTRUCTION, INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
AUSTIN BRIDGE & ROAD, LP
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
701-05-G-01 side drain pipe (18")(bridge end drain) 250      LNFT 90.00 22,500.00 60.00 15,000.00 80.00 20,000.00 45.00 11,250.00
702-03-A catch basins (cb-01) 6      EACH 4,200.00 25,200.00 4,500.00 27,000.00 4,000.00 24,000.00 2,300.00 13,800.00
712-04 flexible revetment 1,532      SQYD 74.00 113,368.00 65.00 99,580.00 70.00 107,240.00 75.00 114,900.00
722-01 project site laboratory 1      EACH 50,000.00 50,000.00 11,000.00 11,000.00 75,000.00 75,000.00 10,000.00 10,000.00
727-01 mobilization lump      LUMP 2,300,000.00 2,300,000.00 2,025,000.00 2,025,000.00 2,400,000.00 2,400,000.00 2,482,500.00 2,482,500.00
740-01 construction layout lump      LUMP 750,000.00 750,000.00 225,000.00 225,000.00 250,000.00 250,000.00 450,000.00 450,000.00
804-01-B precast concrete piles (14") 301      LNFT 94.00 28,294.00 40.50 12,190.50 60.00 18,060.00 60.00 18,060.00
804-01-F precast concrete piles (24") 46,518      LNFT 81.55 3,793,542.90 101.00 4,698,318.00 81.00 3,767,958.00 85.00 3,954,030.00
804-01-G precast concrete piles (30") 7,927      LNFT 140.00 1,109,780.00 188.00 1,490,276.00 115.00 911,605.00 118.00 935,386.00
804-05 precast concrete test piles 2      EACH 14,000.00 28,000.00 24,000.00 48,000.00 30,000.00 60,000.00 26,500.00 53,000.00
804-09 loading test piles 2      EACH 32,300.00 64,600.00 30,000.00 60,000.00 30,000.00 60,000.00 25,000.00 50,000.00
804-10 reloading test piles 2      EACH 3,350.00 6,700.00 3,000.00 6,000.00 5,000.00 10,000.00 6,100.00 12,200.00
804-11 redriving test piles 2      EACH 4,150.00 8,300.00 6,000.00 12,000.00 3,000.00 6,000.00 7,700.00 15,400.00
804-12 loading permanent piles 2      EACH 13,400.00 26,800.00 30,000.00 60,000.00 2,000.00 4,000.00 16,500.00 33,000.00
804-17 dynamic monitoring 6      EACH 4,750.00 28,500.00 1,000.00 6,000.00 5,000.00 30,000.00 1,600.00 9,600.00
805-01-F class a concrete (bents) 2,409.61   CUYD 450.00 1,084,324.50 600.00 1,445,766.00 620.00 1,493,958.20 760.00 1,831,303.60
805-03 class aa concrete 10,434.99   CUYD 478.00 4,987,925.22 550.00 5,739,244.50 665.00 6,939,268.35 600.00 6,260,994.00
805-08-C precast-prestressed concrete girders (type iii) 34,418.6    LNFT 91.00 3,132,092.60 80.00 2,753,488.00 85.00 2,925,581.00 97.00 3,338,604.20
805-08-G precast-prestressed concrete girders (type bt-72) 13,979.2    LNFT 130.00 1,817,296.00 138.00 1,929,129.60 145.00 2,026,984.00 140.00 1,957,088.00
805-11 strip seal joints 989.00   LNFT 114.50 113,240.50 120.00 118,680.00 150.00 148,350.00 160.00 158,240.00
806-01 deformed reinforcing steel 3,072,400      LB 0.96 2,949,504.00 0.76 2,335,024.00 0.85 2,611,540.00 0.95 2,918,780.00
807-08 structural metalwork lump      LUMP 95,400.00 95,400.00 50,000.00 50,000.00 90,000.00 90,000.00 70,000.00 70,000.00
810-01-A concrete railing (barrier) 8,788.00   LNFT 60.00 527,280.00 38.00 333,944.00 45.00 395,460.00 35.00 307,580.00
810-01-B concrete railing (median barrier) 4,322.00   LNFT 75.00 324,150.00 55.00 237,710.00 65.00 280,930.00 45.00 194,490.00
813-01 concrete approach slabs 1,493.34   SQYD 235.00 350,934.90 166.00 247,894.44 220.00 328,534.80 150.00 224,001.00
S-101 impact attenuators (kinetic) 4      EACH 22,200.00 88,800.00 35,000.00 140,000.00 25,000.00 100,000.00 19,000.00 76,000.00
S-102 dynamic analysis 2      each 1,800.00 3,600.00 4,000.00 8,000.00 10,000.00 20,000.00 1,200.00 2,400.00
                       
 CONTRACTOR TOTAL       23,830,132.62   24,134,245.04   25,104,469.35   25,502,606.80
 
Item Number Item Description Quantity Unit of Measure - 5 -
HILL BROTHERS CONSTRUCTION CO., INC
- 6 -
JAMES CONSTRUCTION GROUP LLC
- 7 -
BOH BROS. CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
701-05-G-01 side drain pipe (18")(bridge end drain) 250      LNFT 30.00 7,500.00 65.00 16,250.00 65.00 16,250.00    
702-03-A catch basins (cb-01) 6      EACH 4,000.00 24,000.00 4,000.00 24,000.00 1,500.00 9,000.00    
712-04 flexible revetment 1,532      SQYD 55.00 84,260.00 60.00 91,920.00 60.00 91,920.00    
722-01 project site laboratory 1      EACH 70,000.00 70,000.00 20,000.00 20,000.00 45,000.00 45,000.00    
727-01 mobilization lump      LUMP 2,000,000.00 2,000,000.00 2,600,000.00 2,600,000.00 2,600,000.00 2,600,000.00    
740-01 construction layout lump      LUMP 200,000.00 200,000.00 400,000.00 400,000.00 700,000.00 700,000.00    
804-01-B precast concrete piles (14") 301      LNFT 50.00 15,050.00 65.00 19,565.00 82.00 24,682.00    
804-01-F precast concrete piles (24") 46,518      LNFT 86.00 4,000,548.00 90.00 4,186,620.00 105.00 4,884,390.00    
804-01-G precast concrete piles (30") 7,927      LNFT 160.00 1,268,320.00 135.00 1,070,145.00 125.00 990,875.00    
804-05 precast concrete test piles 2      EACH 20,000.00 40,000.00 35,000.00 70,000.00 20,000.00 40,000.00    
804-09 loading test piles 2      EACH 5,500.00 11,000.00 10,000.00 20,000.00 54,000.00 108,000.00    
804-10 reloading test piles 2      EACH 4,000.00 8,000.00 1,000.00 2,000.00 500.00 1,000.00    
804-11 redriving test piles 2      EACH 8,500.00 17,000.00 1,000.00 2,000.00 750.00 1,500.00    
804-12 loading permanent piles 2      EACH 5,500.00 11,000.00 3,000.00 6,000.00 15,000.00 30,000.00    
804-17 dynamic monitoring 6      EACH 3,000.00 18,000.00 1,500.00 9,000.00 5,300.00 31,800.00    
805-01-F class a concrete (bents) 2,409.61   CUYD 625.00 1,506,006.25 750.00 1,807,207.50 650.00 1,566,246.50    
805-03 class aa concrete 10,434.99   CUYD 700.00 7,304,493.00 650.00 6,782,743.50 550.00 5,739,244.50    
805-08-C precast-prestressed concrete girders (type iii) 34,418.6    LNFT 90.00 3,097,674.00 94.00 3,235,348.40 110.00 3,786,046.00    
805-08-G precast-prestressed concrete girders (type bt-72) 13,979.2    LNFT 140.00 1,957,088.00 190.00 2,656,048.00 180.00 2,516,256.00    
805-11 strip seal joints 989.00   LNFT 150.00 148,350.00 136.00 134,504.00 125.00 123,625.00    
806-01 deformed reinforcing steel 3,072,400      LB 1.00 3,072,400.00 0.73 2,242,852.00 0.80 2,457,920.00    
807-08 structural metalwork lump      LUMP 85,000.00 85,000.00 65,000.00 65,000.00 65,000.00 65,000.00    
810-01-A concrete railing (barrier) 8,788.00   LNFT 55.00 483,340.00 44.00 386,672.00 40.00 351,520.00    
810-01-B concrete railing (median barrier) 4,322.00   LNFT 60.00 259,320.00 56.00 242,032.00 50.00 216,100.00    
813-01 concrete approach slabs 1,493.34   SQYD 140.00 209,067.60 175.00 261,334.50 180.00 268,801.20    
S-101 impact attenuators (kinetic) 4      EACH 22,000.00 88,000.00 20,000.00 80,000.00 20,000.00 80,000.00    
S-102 dynamic analysis 2      each 2,500.00 5,000.00 1,000.00 2,000.00 1,800.00 3,600.00    
                       
 CONTRACTOR TOTAL       25,990,416.85   26,433,241.90   26,748,776.20    