| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
200   |
SQYD |
1.00 |
200.00 |
45.00 |
9,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
15.0 |
SQYD |
1.00 |
15.00 |
65.00 |
975.00 |
|
|
|
|
| 203-04 |
nonplastic embankment
|
350   |
CUYD |
25.00 |
8,750.00 |
100.00 |
35,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
1,000   |
CUYD |
8.00 |
8,000.00 |
10.00 |
10,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,025   |
CUYD |
30.00 |
30,750.00 |
65.00 |
66,625.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,503.2 |
TON |
63.00 |
472,701.60 |
60.00 |
450,192.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
506.0 |
TON |
160.00 |
80,960.00 |
150.00 |
75,900.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,000   |
SQYD |
65.00 |
65,000.00 |
55.00 |
55,000.00 |
|
|
|
|
| 510-02 |
pavement widening
|
2,918.6 |
SQYD |
49.00 |
143,011.40 |
60.00 |
175,116.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
60   |
LNFT |
160.00 |
9,600.00 |
150.00 |
9,000.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
125.0 |
LNFT |
50.00 |
6,250.00 |
55.00 |
6,875.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
75.0 |
LNFT |
25.00 |
1,875.00 |
26.00 |
1,950.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,600.00 |
10,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
250   |
LNFT |
0.10 |
25.00 |
0.10 |
25.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
25   |
LNFT |
0.10 |
2.50 |
0.10 |
2.50 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.020 |
MILE |
10.00 |
100.20 |
150.00 |
1,503.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.430 |
MILE |
10.00 |
34.30 |
10.00 |
34.30 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
9.850 |
MILE |
10.00 |
98.50 |
10.00 |
98.50 |
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
3   |
EACH |
10.00 |
30.00 |
10.00 |
30.00 |
|
|
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
3   |
EACH |
10.00 |
30.00 |
10.00 |
30.00 |
|
|
|
|
| 713-05-E |
temporary pavement legends and symbols (school
crossing) |
2   |
EACH |
10.00 |
20.00 |
10.00 |
20.00 |
|
|
|
|
| 726-01 |
bedding material
|
20.0 |
CUYD |
85.00 |
1,700.00 |
60.00 |
1,200.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
110,000.00 |
110,000.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
32   |
EACH |
75.00 |
2,400.00 |
75.00 |
2,400.00 |
|
|
|
|
| 729-19-B |
dead end road installations(type b)
|
16   |
EACH |
800.00 |
12,800.00 |
850.00 |
13,600.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
528   |
EACH |
5.25 |
2,772.00 |
5.50 |
2,904.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
250   |
LNFT |
0.90 |
225.00 |
1.00 |
250.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
25   |
LNFT |
3.10 |
77.50 |
3.00 |
75.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.850 |
MILE |
2,700.00 |
26,595.00 |
2,700.00 |
26,595.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.430 |
MILE |
700.00 |
2,401.00 |
700.00 |
2,401.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
175.00 |
525.00 |
180.00 |
540.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
225.00 |
675.00 |
250.00 |
750.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
450.00 |
900.00 |
450.00 |
900.00 |
|
|
|
|
| 735-01 |
mailboxes
|
190   |
EACH |
1.00 |
190.00 |
1.00 |
190.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
177   |
EACH |
100.00 |
17,700.00 |
110.00 |
19,470.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
170.00 |
340.00 |
160.00 |
320.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
300.00 |
900.00 |
250.00 |
750.00 |
|
|
|
|
| 736-09 |
loop detector
|
757   |
LNFT |
12.00 |
9,084.00 |
12.50 |
9,462.50 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
4,000.00 |
4,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
saw cutting
|
4,000   |
INFT |
1.00 |
4,000.00 |
1.00 |
4,000.00 |
|
|
|
|
| S-002 |
surface preparation
|
51,708   |
SQYD |
0.85 |
43,951.80 |
0.50 |
25,854.00 |
|
|
|
|
| S-003 |
headwall & wingwall extensions
|
2   |
EACH |
5,000.00 |
10,000.00 |
8,000.00 |
16,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,104,689.80 |
|