| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 502-01 |
superpave asphaltic concrete
|
1,015.0 |
TON |
98.00 |
99,470.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
24.0 |
TON |
200.00 |
4,800.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
9,445   |
SQYD |
4.00 |
37,780.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 394   |
CUYD |
0.01 |
- 3.94 |
|
|
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
120.00 |
6,000.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
170.00 |
510.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,500.00 |
12,500.00 |
|
|
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
236   |
LNFT |
0.36 |
84.96 |
|
|
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
99   |
LNFT |
1.07 |
105.93 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.378 |
MILE |
597.00 |
225.67 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.184 |
MILE |
567.00 |
104.33 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
1.512 |
MILE |
949.00 |
1,434.89 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
10   |
EACH |
60.00 |
600.00 |
|
|
|
|
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
3   |
EACH |
60.00 |
180.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
353   |
EACH |
6.30 |
2,223.90 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
236   |
LNFT |
1.10 |
259.60 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
99   |
LNFT |
4.50 |
445.50 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.512 |
MILE |
3,212.00 |
4,856.54 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.184 |
MILE |
830.00 |
152.72 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
10   |
EACH |
233.00 |
2,330.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
281.00 |
843.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
205,903.10 |
|
|
|
|
|
|