Letting of 10/31/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 209-02-0016
Parish: JEFF DAVIS
Routes: LA 101
Description: CALCASIEU PARISH LN. - 3.115 MILES N. OF PARISH LN.
Type Const: cold planing asphaltic concrete pavement, pavement patching, superpave asphaltic
concrete overlay and related work.
Estimated Construction Cost: $1,274,273.24
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,122,110.90
2 34356 PRAIRIE CONTRACTORS INC. $1,165,710.55
3 12312 GILCHRIST CONSTRUCTION CO. LLC $1,205,089.60
4 14096 BESSETTE DEVELOPMENT CORP. $1,257,166.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
BESSETTE DEVELOPMENT CORP.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
1,461      CUYD 72.00 105,192.00 53.00 77,433.00 90.00 131,490.00 95.00 138,795.00
502-01 superpave asphaltic concrete 9,529.8    TON 69.00 657,556.20 81.00 771,913.80 72.00 686,145.60 82.00 781,443.60
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
563.8    TON 138.00 77,804.40 137.00 77,240.60 130.00 73,294.00 168.00 94,718.40
509-01 cold planing asphaltic pavement 44,590      SQYD 1.50 66,885.00 1.60 71,344.00 1.35 60,196.50 1.65 73,573.50
509-02 contractor retained reclaimed asphaltic pavement - 623      CUYD 0.10 - 62.30 0.01 - 6.23 0.01 - 6.23 1.00 - 623.00
510-01-B pavement patching (12" minimum thickness) 1,154      SQYD 87.00 100,398.00 75.00 86,550.00 105.00 121,170.00 73.75 85,107.50
713-01 temporary signs & barricades lump      LUMP 7,500.00 7,500.00 20,000.00 20,000.00 7,500.00 7,500.00 5,500.00 5,500.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
9.347  MILE 135.00 1,261.85 400.00 3,738.80 350.00 3,271.45 350.00 3,271.45
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
9.347  MILE 335.00 3,131.25 0.01 0.09 1.00 9.35 350.00 3,271.45
713-04-A temporary pavement markings (solid line)(4" width) 18.930  MILE 665.00 12,588.45 0.01 0.19 1.00 18.93 665.00 12,588.45
727-01 mobilization lump      LUMP 58,000.00 58,000.00 30,000.00 30,000.00 80,000.00 80,000.00 30,000.00 30,000.00
729-16-B object marker assembly (type 2) 12      EACH 41.00 492.00 50.00 600.00 55.00 660.00 45.00 540.00
729-16-C object marker assembly (type 3) 4      EACH 76.00 304.00 80.00 320.00 85.00 340.00 90.00 360.00
731-02 reflectorized raised pavement markers 412      EACH 5.00 2,060.00 5.00 2,060.00 6.00 2,472.00 5.00 2,060.00
732-02-A plastic pavement striping (solid line) (4" width) 6.229  MILE 2,450.00 15,261.05 2,500.00 15,572.50 3,000.00 18,687.00 2,550.00 15,883.95
732-03-A plastic pavement striping (broken line)(4" width) 3.116  MILE 750.00 2,337.00 800.00 2,492.80 1,000.00 3,116.00 775.00 2,414.90
732-05 removal of existing markings 0.023  MILE 10,000.00 230.00 15,000.00 345.00 10,000.00 230.00 12,000.00 276.00
735-01 mailboxes 47      EACH 1.00 47.00 5.00 235.00 10.00 470.00 1.50 70.50
735-02 mailbox supports (single) 31      EACH 125.00 3,875.00 150.00 4,650.00 150.00 4,650.00 115.00 3,565.00
735-03 mailbox supports (double) 5      EACH 150.00 750.00 160.00 800.00 175.00 875.00 170.00 850.00
735-04 mailbox supports (multiple) 2      EACH 250.00 500.00 210.00 420.00 250.00 500.00 250.00 500.00
740-01 construction layout lump      LUMP 6,000.00 6,000.00 1.00 1.00 10,000.00 10,000.00 3,000.00 3,000.00
                       
 CONTRACTOR TOTAL       1,122,110.90   1,165,710.55   1,205,089.60   1,257,166.70