Letting of 10/31/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 123-04-0021
Parish: WINN
Routes: LA 34
Description: JCT. LA 3136 - 6.7 MILES NORTH
Type Const: grading, cold planing asphaltic concrete pavement, lime trea tment,cement treated
base course,pavement patching,superpave asphaltic concrete pavement and related work.
Estimated Construction Cost: $3,146,417.31
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $2,771,345.54
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,908,725.37
3 12312 GILCHRIST CONSTRUCTION CO. LLC $3,262,696.65
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 2,000.00 2,000.00 1,600.00 1,600.00 15,000.00 15,000.00    
203-07 borrow (vehicular measurement) 5,964      CUYD 12.35 73,655.40 13.50 80,514.00 16.00 95,424.00    
203-07-A borrow (vehicular meas.)(selected soils) 923      CUYD 12.00 11,076.00 11.00 10,153.00 16.00 14,768.00    
304-01 lime 487.19   TON 140.00 68,206.60 169.00 82,335.11 150.00 73,078.50    
304-04-D lime treatment (type d) (12" thick) 30,933      SQYD 2.00 61,866.00 2.50 77,332.50 1.25 38,666.25    
308-01-A in-place cement treated base course (12" thick) 31,149      SQYD 7.50 233,617.50 6.90 214,928.10 8.00 249,192.00    
308-02 removal of existing patches 350      SQYD 10.00 3,500.00 18.00 6,300.00 25.00 8,750.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
4,403      CUYD 56.50 248,769.50 16.00 70,448.00 58.00 255,374.00    
502-01 superpave asphaltic concrete 20,693.4    TON 70.00 1,448,538.00 77.50 1,603,738.50 80.00 1,655,472.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
491.6    TON 40.00 19,664.00 159.00 78,164.40 200.00 98,320.00    
507-01-A asphaltic material (crs-2p cold applied emulsion) 42,644      GAL 2.41 102,772.04 2.65 113,006.60 2.50 106,610.00    
507-02-B aggregate (s2) 62,712      SQYD 1.19 74,627.28 1.25 78,390.00 1.15 72,118.80    
507-02-C aggregate (s3) 62,712      SQYD 1.06 66,474.72 1.00 62,712.00 0.90 56,440.80    
509-01 cold planing asphaltic pavement 27,290      SQYD 1.80 49,122.00 1.80 49,122.00 2.25 61,402.50    
509-02 contractor retained reclaimed asphaltic pavement - 2,960      CUYD 0.10 - 296.00 0.10 - 296.00 0.01 - 29.60    
510-01-B pavement patching (12" minimum thickness) 625      SQYD 63.25 39,531.25 95.00 59,375.00 100.00 62,500.00    
701-10-K reinforced concrete pipe (extension)(30") 24      LNFT 180.00 4,320.00 200.00 4,800.00 260.00 6,240.00    
701-15 concrete collar 2      EACH 700.00 1,400.00 747.00 1,494.00 1,200.00 2,400.00    
712-02 sacked concrete revetment 200      SQYD 70.00 14,000.00 78.00 15,600.00 85.00 17,000.00    
713-01 temporary signs & barricades lump      LUMP 67,000.00 67,000.00 15,500.00 15,500.00 10,000.00 10,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
18.846  MILE 325.00 6,124.95 135.00 2,544.21 350.00 6,596.10    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
8.559  MILE 1.00 8.56 305.00 2,610.50 1.00 8.56    
713-04-A temporary pavement markings (solid line)(4" width) 63.340  MILE 1.00 63.34 595.00 37,687.30 1.00 63.34    
713-06-A temporary reflectorized raised pavement markers (tabs) 1,176      EACH 1.25 1,470.00 1.75 2,058.00 1.50 1,764.00    
716-01-A mulch (vegetative) 13.0    TON 600.00 7,800.00 339.00 4,407.00 350.00 4,550.00    
717-01 seeding 195      LB 8.00 1,560.00 8.62 1,680.90 10.00 1,950.00    
718-01 fertilizer 6,484      LB 0.50 3,242.00 0.42 2,723.28 0.45 2,917.80    
722-01 project site laboratory 1      EACH 2,500.00 2,500.00 10,000.00 10,000.00 20,000.00 20,000.00    
726-01 bedding material 7.6    CUYD 100.00 760.00 90.00 684.00 115.00 874.00    
727-01 mobilization lump      LUMP 67,000.00 67,000.00 125,000.00 125,000.00 165,000.00 165,000.00    
729-16-B object marker assembly (type 2) 4      EACH 100.00 400.00 84.00 336.00 70.00 280.00    
731-02 reflectorized raised pavement markers 881      EACH 4.50 3,964.50 5.00 4,405.00 6.00 5,286.00    
732-01-E plastic pavement striping (24" width) 48      LNFT 3.00 144.00 3.25 156.00 3.60 172.80    
732-02-A plastic pavement striping (solid line) (4" width) 20.924  MILE 2,300.00 48,125.20 2,400.00 50,217.60 3,000.00 62,772.00    
732-03-A plastic pavement striping (broken line)(4" width) 4.281  MILE 700.00 2,996.70 754.00 3,227.87 800.00 3,424.80    
735-01 mailboxes 7      EACH 1.00 7.00 1.00 7.00 5.00 35.00    
735-02 mailbox supports (single) 5      EACH 185.00 925.00 185.00 925.00 175.00 875.00    
735-03 mailbox supports (double) 2      EACH 195.00 390.00 195.00 390.00 300.00 600.00    
740-01 construction layout lump      LUMP 15,000.00 15,000.00 15,500.00 15,500.00 15,000.00 15,000.00    
805-12-Y-01 reinforced concrete box culverts (3'x 3')(extension) 22.3    LNFT 800.00 17,840.00 445.00 9,923.50 1,000.00 22,300.00    
S-002 general excavation (vehicular measurement) 100      CUYD 10.00 1,000.00 18.25 1,825.00 45.00 4,500.00    
S-003 saw cutting 18,000      INFT 0.01 180.00 0.40 7,200.00 2.50 45,000.00    
                       
 CONTRACTOR TOTAL       2,771,345.54   2,908,725.37   3,262,696.65    