| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,000.00 |
2,000.00 |
1,600.00 |
1,600.00 |
15,000.00 |
15,000.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
5,964   |
CUYD |
12.35 |
73,655.40 |
13.50 |
80,514.00 |
16.00 |
95,424.00 |
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
923   |
CUYD |
12.00 |
11,076.00 |
11.00 |
10,153.00 |
16.00 |
14,768.00 |
|
|
| 304-01 |
lime
|
487.19 |
TON |
140.00 |
68,206.60 |
169.00 |
82,335.11 |
150.00 |
73,078.50 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
30,933   |
SQYD |
2.00 |
61,866.00 |
2.50 |
77,332.50 |
1.25 |
38,666.25 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
31,149   |
SQYD |
7.50 |
233,617.50 |
6.90 |
214,928.10 |
8.00 |
249,192.00 |
|
|
| 308-02 |
removal of existing patches
|
350   |
SQYD |
10.00 |
3,500.00 |
18.00 |
6,300.00 |
25.00 |
8,750.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
4,403   |
CUYD |
56.50 |
248,769.50 |
16.00 |
70,448.00 |
58.00 |
255,374.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
20,693.4 |
TON |
70.00 |
1,448,538.00 |
77.50 |
1,603,738.50 |
80.00 |
1,655,472.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
491.6 |
TON |
40.00 |
19,664.00 |
159.00 |
78,164.40 |
200.00 |
98,320.00 |
|
|
| 507-01-A |
asphaltic material (crs-2p cold applied emulsion)
|
42,644   |
GAL |
2.41 |
102,772.04 |
2.65 |
113,006.60 |
2.50 |
106,610.00 |
|
|
| 507-02-B |
aggregate (s2)
|
62,712   |
SQYD |
1.19 |
74,627.28 |
1.25 |
78,390.00 |
1.15 |
72,118.80 |
|
|
| 507-02-C |
aggregate (s3)
|
62,712   |
SQYD |
1.06 |
66,474.72 |
1.00 |
62,712.00 |
0.90 |
56,440.80 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
27,290   |
SQYD |
1.80 |
49,122.00 |
1.80 |
49,122.00 |
2.25 |
61,402.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,960   |
CUYD |
0.10 |
- 296.00 |
0.10 |
- 296.00 |
0.01 |
- 29.60 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
625   |
SQYD |
63.25 |
39,531.25 |
95.00 |
59,375.00 |
100.00 |
62,500.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
24   |
LNFT |
180.00 |
4,320.00 |
200.00 |
4,800.00 |
260.00 |
6,240.00 |
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
700.00 |
1,400.00 |
747.00 |
1,494.00 |
1,200.00 |
2,400.00 |
|
|
| 712-02 |
sacked concrete revetment
|
200   |
SQYD |
70.00 |
14,000.00 |
78.00 |
15,600.00 |
85.00 |
17,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
67,000.00 |
67,000.00 |
15,500.00 |
15,500.00 |
10,000.00 |
10,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.846 |
MILE |
325.00 |
6,124.95 |
135.00 |
2,544.21 |
350.00 |
6,596.10 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.559 |
MILE |
1.00 |
8.56 |
305.00 |
2,610.50 |
1.00 |
8.56 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
63.340 |
MILE |
1.00 |
63.34 |
595.00 |
37,687.30 |
1.00 |
63.34 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,176   |
EACH |
1.25 |
1,470.00 |
1.75 |
2,058.00 |
1.50 |
1,764.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
13.0 |
TON |
600.00 |
7,800.00 |
339.00 |
4,407.00 |
350.00 |
4,550.00 |
|
|
| 717-01 |
seeding
|
195   |
LB |
8.00 |
1,560.00 |
8.62 |
1,680.90 |
10.00 |
1,950.00 |
|
|
| 718-01 |
fertilizer
|
6,484   |
LB |
0.50 |
3,242.00 |
0.42 |
2,723.28 |
0.45 |
2,917.80 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
2,500.00 |
2,500.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
| 726-01 |
bedding material
|
7.6 |
CUYD |
100.00 |
760.00 |
90.00 |
684.00 |
115.00 |
874.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
67,000.00 |
67,000.00 |
125,000.00 |
125,000.00 |
165,000.00 |
165,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
84.00 |
336.00 |
70.00 |
280.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
881   |
EACH |
4.50 |
3,964.50 |
5.00 |
4,405.00 |
6.00 |
5,286.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
48   |
LNFT |
3.00 |
144.00 |
3.25 |
156.00 |
3.60 |
172.80 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
20.924 |
MILE |
2,300.00 |
48,125.20 |
2,400.00 |
50,217.60 |
3,000.00 |
62,772.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.281 |
MILE |
700.00 |
2,996.70 |
754.00 |
3,227.87 |
800.00 |
3,424.80 |
|
|
| 735-01 |
mailboxes
|
7   |
EACH |
1.00 |
7.00 |
1.00 |
7.00 |
5.00 |
35.00 |
|
|
| 735-02 |
mailbox supports (single)
|
5   |
EACH |
185.00 |
925.00 |
185.00 |
925.00 |
175.00 |
875.00 |
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
195.00 |
390.00 |
195.00 |
390.00 |
300.00 |
600.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,500.00 |
15,500.00 |
15,000.00 |
15,000.00 |
|
|
| 805-12-Y-01 |
reinforced concrete box culverts (3'x 3')(extension)
|
22.3 |
LNFT |
800.00 |
17,840.00 |
445.00 |
9,923.50 |
1,000.00 |
22,300.00 |
|
|
| S-002 |
general excavation (vehicular measurement)
|
100   |
CUYD |
10.00 |
1,000.00 |
18.25 |
1,825.00 |
45.00 |
4,500.00 |
|
|
| S-003 |
saw cutting
|
18,000   |
INFT |
0.01 |
180.00 |
0.40 |
7,200.00 |
2.50 |
45,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,771,345.54 |
|
2,908,725.37 |
|
3,262,696.65 |
|
|
|