Letting of 10/31/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 112-02-0007
Parish: SABINE
Routes: LA 174
Description: JCT. LA 191 - JCT. US 171
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete, cement treated base course, lime treatment, pvmt. patching, and related work.
Estimated Construction Cost: $1,887,886.06
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $2,036,846.42
2 12312 GILCHRIST CONSTRUCTION CO. LLC $2,456,959.67
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 3,500.00 3,500.00 5,000.00 5,000.00        
202-02-D removal of concrete walks & drives 32      SQYD 10.00 320.00 23.00 736.00        
202-02-H removal of guard rail 413      LNFT 4.00 1,652.00 23.00 9,499.00        
203-07 borrow (vehicular measurement) 600      CUYD 2.00 1,200.00 11.00 6,600.00        
203-07-A borrow (vehicular meas.)(selected soils) 596      CUYD 12.00 7,152.00 12.00 7,152.00        
203-08 geotextile fabric 260      SQYD 2.50 650.00 2.50 650.00        
304-01 lime 369.39   TON 150.00 55,408.50 185.00 68,337.15        
304-04-D lime treatment (type d) (12" thick) 26,059      SQYD 2.00 52,118.00 2.75 71,662.25        
308-01-A in-place cement treated base course (12" thick) 66,001      SQYD 7.60 501,607.60 7.50 495,007.50        
308-02 removal of existing patches 300      SQYD 10.00 3,000.00 25.00 7,500.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,506      CUYD 45.00 67,770.00 40.00 60,240.00        
502-01 superpave asphaltic concrete 12,000.6    TON 79.80 957,647.88 90.00 1,080,054.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
455.9    TON 40.00 18,236.00 175.00 79,782.50        
509-01 cold planing asphaltic pavement 57,114      SQYD 1.40 79,959.60 2.30 131,362.20        
509-02 contractor retained reclaimed asphaltic pavement - 1,344      CUYD 0.01 - 13.44 0.01 - 13.44        
701-02-N/N cross drain pipe arch (84" equiv. rcpa or 84" equiv.
cmpa)
52      LNFT 275.00 14,300.00 440.00 22,880.00        
701-10-M reinforced concrete pipe (extension)(36") 32      LNFT 200.00 6,400.00 600.00 19,200.00        
701-15 concrete collar 4      EACH 700.00 2,800.00 1,000.00 4,000.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 159.6    LNFT 33.00 5,266.80 38.00 6,064.80        
704-03 blocked out guard rail 62.5    LNFT 17.50 1,093.75 20.00 1,250.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 53.00 5,300.00 60.00 6,000.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00 2,300.00 9,200.00        
707-04 asphaltic curb 40.0    LNFT 10.00 400.00 65.00 2,600.00        
712-04 flexible revetment 80      SQYD 70.00 5,600.00 130.00 10,400.00        
713-01 temporary signs & barricades lump      LUMP 68,500.00 68,500.00 15,000.00 15,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
14.423  MILE 300.00 4,326.90 350.00 5,048.05        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
7.435  MILE 1.00 7.44 1.00 7.44        
713-04-A temporary pavement markings (solid line)(4" width) 48.424  MILE 1.00 48.42 1.00 48.42        
716-01-A mulch (vegetative) 0.5    TON 2,500.00 1,250.00 3,500.00 1,750.00        
717-01 seeding 8      LB 20.00 160.00 30.00 240.00        
718-01 fertilizer 251      LB 1.00 251.00 3.00 753.00        
722-01 project site laboratory 1      EACH 7,500.00 7,500.00 25,000.00 25,000.00        
726-01 bedding material 38.0    CUYD 90.00 3,420.00 115.00 4,370.00        
727-01 mobilization lump      LUMP 68,500.00 68,500.00 200,000.00 200,000.00        
729-16-B object marker assembly (type 2) 4      EACH 60.00 240.00 70.00 280.00        
729-16-C object marker assembly (type 3) 4      EACH 70.00 280.00 80.00 320.00        
731-02 reflectorized raised pavement markers 635      EACH 5.10 3,238.50 6.00 3,810.00        
732-01-E plastic pavement striping (24" width) 11      LNFT 3.10 34.10 3.50 38.50        
732-02-A plastic pavement striping (solid line) (4" width) 16.141  MILE 2,350.00 37,931.35 2,700.00 43,580.70        
732-03-A plastic pavement striping (broken line)(4" width) 2.478  MILE 590.00 1,462.02 700.00 1,734.60        
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 400.00 400.00 500.00 500.00        
735-01 mailboxes 23      EACH 1.00 23.00 5.00 115.00        
735-02 mailbox supports (single) 15      EACH 125.00 1,875.00 170.00 2,550.00        
735-03 mailbox supports (double) 8      EACH 175.00 1,400.00 275.00 2,200.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 12,000.00 12,000.00        
S-001 cleaning existing ditches 125      LNFT 10.00 1,250.00 10.00 1,250.00        
S-002 sack concrete headwall 76.0    CUYD 255.00 19,380.00 400.00 30,400.00        
S-003 saw cutting 200      INFT 5.00 1,000.00 4.00 800.00        
                       
 CONTRACTOR TOTAL       2,036,846.42   2,456,959.67        