| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
32   |
SQYD |
10.00 |
320.00 |
23.00 |
736.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
413   |
LNFT |
4.00 |
1,652.00 |
23.00 |
9,499.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
600   |
CUYD |
2.00 |
1,200.00 |
11.00 |
6,600.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
596   |
CUYD |
12.00 |
7,152.00 |
12.00 |
7,152.00 |
|
|
|
|
| 203-08 |
geotextile fabric
|
260   |
SQYD |
2.50 |
650.00 |
2.50 |
650.00 |
|
|
|
|
| 304-01 |
lime
|
369.39 |
TON |
150.00 |
55,408.50 |
185.00 |
68,337.15 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
26,059   |
SQYD |
2.00 |
52,118.00 |
2.75 |
71,662.25 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
66,001   |
SQYD |
7.60 |
501,607.60 |
7.50 |
495,007.50 |
|
|
|
|
| 308-02 |
removal of existing patches
|
300   |
SQYD |
10.00 |
3,000.00 |
25.00 |
7,500.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,506   |
CUYD |
45.00 |
67,770.00 |
40.00 |
60,240.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,000.6 |
TON |
79.80 |
957,647.88 |
90.00 |
1,080,054.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
455.9 |
TON |
40.00 |
18,236.00 |
175.00 |
79,782.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
57,114   |
SQYD |
1.40 |
79,959.60 |
2.30 |
131,362.20 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,344   |
CUYD |
0.01 |
- 13.44 |
0.01 |
- 13.44 |
|
|
|
|
| 701-02-N/N |
cross drain pipe arch (84" equiv. rcpa or 84" equiv.
cmpa) |
52   |
LNFT |
275.00 |
14,300.00 |
440.00 |
22,880.00 |
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
32   |
LNFT |
200.00 |
6,400.00 |
600.00 |
19,200.00 |
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
700.00 |
2,800.00 |
1,000.00 |
4,000.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
159.6 |
LNFT |
33.00 |
5,266.80 |
38.00 |
6,064.80 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
62.5 |
LNFT |
17.50 |
1,093.75 |
20.00 |
1,250.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
53.00 |
5,300.00 |
60.00 |
6,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,300.00 |
9,200.00 |
|
|
|
|
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
10.00 |
400.00 |
65.00 |
2,600.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
80   |
SQYD |
70.00 |
5,600.00 |
130.00 |
10,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
68,500.00 |
68,500.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.423 |
MILE |
300.00 |
4,326.90 |
350.00 |
5,048.05 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.435 |
MILE |
1.00 |
7.44 |
1.00 |
7.44 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
48.424 |
MILE |
1.00 |
48.42 |
1.00 |
48.42 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.5 |
TON |
2,500.00 |
1,250.00 |
3,500.00 |
1,750.00 |
|
|
|
|
| 717-01 |
seeding
|
8   |
LB |
20.00 |
160.00 |
30.00 |
240.00 |
|
|
|
|
| 718-01 |
fertilizer
|
251   |
LB |
1.00 |
251.00 |
3.00 |
753.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
7,500.00 |
7,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
38.0 |
CUYD |
90.00 |
3,420.00 |
115.00 |
4,370.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
68,500.00 |
68,500.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
60.00 |
240.00 |
70.00 |
280.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
80.00 |
320.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
635   |
EACH |
5.10 |
3,238.50 |
6.00 |
3,810.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
11   |
LNFT |
3.10 |
34.10 |
3.50 |
38.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
16.141 |
MILE |
2,350.00 |
37,931.35 |
2,700.00 |
43,580.70 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.478 |
MILE |
590.00 |
1,462.02 |
700.00 |
1,734.60 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
400.00 |
400.00 |
500.00 |
500.00 |
|
|
|
|
| 735-01 |
mailboxes
|
23   |
EACH |
1.00 |
23.00 |
5.00 |
115.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
125.00 |
1,875.00 |
170.00 |
2,550.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
8   |
EACH |
175.00 |
1,400.00 |
275.00 |
2,200.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
125   |
LNFT |
10.00 |
1,250.00 |
10.00 |
1,250.00 |
|
|
|
|
| S-002 |
sack concrete headwall
|
76.0 |
CUYD |
255.00 |
19,380.00 |
400.00 |
30,400.00 |
|
|
|
|
| S-003 |
saw cutting
|
200   |
INFT |
5.00 |
1,000.00 |
4.00 |
800.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,036,846.42 |
|
2,456,959.67 |
|
|
|
|
|