| Lead Project: 087-01-0029 |
| Parish: WEBSTER |
| Routes: LA 159 |
| Description: LOG MILE 9.500 - JUNCTION LA 2 |
Type Const:
grading, drainage structures, pavement patching, superpave asphaltic concrete overlay,
and related work. |
| Estimated Construction Cost: $2,615,693.63 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
30   |
SQYD |
50.00 |
1,500.00 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
1.00 |
1.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
12,000   |
CUYD |
14.05 |
168,600.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
21,444.3 |
TON |
73.85 |
1,583,661.56 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,100.0 |
TON |
40.00 |
44,000.00 |
|
|
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
31,660   |
GAL |
2.05 |
64,903.00 |
|
|
|
|
|
|
| 507-02-C |
aggregate (s3)
|
102,129   |
SQYD |
1.22 |
124,597.38 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
102,129   |
SQYD |
1.45 |
148,087.05 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,063   |
CUYD |
1.00 |
- 1,063.00 |
|
|
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
3,500   |
SQYD |
25.00 |
87,500.00 |
|
|
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
6   |
LNFT |
120.00 |
720.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
160.00 |
1,280.00 |
|
|
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
4   |
LNFT |
180.00 |
720.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
700.00 |
2,800.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
300   |
SQYD |
70.00 |
21,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
78,000.00 |
78,000.00 |
|
|
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
22   |
LNFT |
0.60 |
13.20 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.547 |
MILE |
400.00 |
3,418.80 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.420 |
MILE |
275.00 |
390.50 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
29.181 |
MILE |
550.00 |
16,049.55 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
30.0 |
TON |
600.00 |
18,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
78,000.00 |
78,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
100.00 |
800.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,128   |
EACH |
4.50 |
5,076.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
11   |
LNFT |
3.00 |
33.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
29.181 |
MILE |
2,300.00 |
67,116.30 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.420 |
MILE |
700.00 |
994.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
18   |
EACH |
1.00 |
18.00 |
|
|
|
|
|
|
| 735-01-A |
mailboxes (large box)
|
2   |
EACH |
2.00 |
4.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
20   |
EACH |
139.00 |
2,780.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
15.00 |
ACRE |
1,200.00 |
18,000.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| S-001 |
saw cutting existing concrete drives
|
120   |
LNFT |
9.00 |
1,080.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,558,080.34 |
|
|
|
|
|
|
|