Lead Project: 087-01-0029
Parish: WEBSTER
Routes: LA 159
Description: LOG MILE 9.500 - JUNCTION LA 2
Type Const: grading, drainage structures, pavement patching, superpave asphaltic concrete overlay,
and related work.
Estimated Construction Cost: $2,615,693.63
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $2,558,080.34
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 30      SQYD 50.00 1,500.00            
203-05 excavation and embankment lump      LUMP 1.00 1.00            
203-07 borrow (vehicular measurement) 12,000      CUYD 14.05 168,600.00            
502-01 superpave asphaltic concrete 21,444.3    TON 73.85 1,583,661.56            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,100.0    TON 40.00 44,000.00            
507-01-A asphaltic material (crs-2p emulsion) 31,660      GAL 2.05 64,903.00            
507-02-C aggregate (s3) 102,129      SQYD 1.22 124,597.38            
509-01 cold planing asphaltic pavement 102,129      SQYD 1.45 148,087.05            
509-02 contractor retained reclaimed asphaltic pavement - 1,063      CUYD 1.00 - 1,063.00            
510-01-A pavement patching (6" minimum thickness) 3,500      SQYD 25.00 87,500.00            
701-10-G reinforced concrete pipe (extension)(18") 6      LNFT 120.00 720.00            
701-10-I reinforced concrete pipe (extension)(24") 8      LNFT 160.00 1,280.00            
701-10-K reinforced concrete pipe (extension)(30") 4      LNFT 180.00 720.00            
701-15 concrete collar 4      EACH 700.00 2,800.00            
712-04 flexible revetment 300      SQYD 70.00 21,000.00            
713-01 temporary signs & barricades lump      LUMP 78,000.00 78,000.00            
713-02-E temporary pavement markings (24" width) 22      LNFT 0.60 13.20            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
8.547  MILE 400.00 3,418.80            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.420  MILE 275.00 390.50            
713-04-A temporary pavement markings (solid line)(4" width) 29.181  MILE 550.00 16,049.55            
716-01-A mulch (vegetative) 30.0    TON 600.00 18,000.00            
727-01 mobilization lump      LUMP 78,000.00 78,000.00            
729-16-B object marker assembly (type 2) 8      EACH 100.00 800.00            
731-02 reflectorized raised pavement markers 1,128      EACH 4.50 5,076.00            
732-01-E plastic pavement striping (24" width) 11      LNFT 3.00 33.00            
732-02-A plastic pavement striping (solid line) (4" width) 29.181  MILE 2,300.00 67,116.30            
732-03-A plastic pavement striping (broken line)(4" width) 1.420  MILE 700.00 994.00            
735-01 mailboxes 18      EACH 1.00 18.00            
735-01-A mailboxes (large box) 2      EACH 2.00 4.00            
735-02 mailbox supports (single) 20      EACH 139.00 2,780.00            
739-01 hydro-seeding 15.00   ACRE 1,200.00 18,000.00            
740-01 construction layout lump      LUMP 20,000.00 20,000.00            
S-001 saw cutting existing concrete drives 120      LNFT 9.00 1,080.00            
                       
 CONTRACTOR TOTAL       2,558,080.34            