| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
546   |
LNFT |
14.00 |
7,644.00 |
20.00 |
10,920.00 |
17.00 |
9,282.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
250   |
CUYD |
25.00 |
6,250.00 |
30.00 |
7,500.00 |
20.00 |
5,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,206   |
CUYD |
80.00 |
96,480.00 |
9.00 |
10,854.00 |
100.00 |
120,600.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
3,199.7 |
TON |
71.50 |
228,778.55 |
85.00 |
271,974.50 |
85.00 |
271,974.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
485.6 |
TON |
130.00 |
63,128.00 |
130.00 |
63,128.00 |
165.00 |
80,124.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
2,131   |
SQYD |
88.00 |
187,528.00 |
87.00 |
185,397.00 |
90.00 |
191,790.00 |
|
|
| 510-02 |
pavement widening
|
439.4 |
SQYD |
80.00 |
35,152.00 |
90.00 |
39,546.00 |
130.00 |
57,122.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
148.0 |
LNFT |
35.00 |
5,180.00 |
34.00 |
5,032.00 |
35.00 |
5,180.00 |
|
|
| 704-03 |
blocked out guard rail
|
325.0 |
LNFT |
18.00 |
5,850.00 |
18.00 |
5,850.00 |
19.00 |
6,175.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
54.00 |
5,400.00 |
55.00 |
5,500.00 |
55.00 |
5,500.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
2,700.00 |
10,800.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,375.00 |
8,375.00 |
60,000.00 |
60,000.00 |
25,000.00 |
25,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.120 |
MILE |
145.00 |
597.40 |
400.00 |
1,648.00 |
350.00 |
1,442.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.068 |
MILE |
282.00 |
1,147.18 |
0.01 |
0.04 |
1.00 |
4.07 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
10.388 |
MILE |
575.00 |
5,973.10 |
0.01 |
0.10 |
1.00 |
10.39 |
|
|
| 717-01 |
seeding
|
9   |
LB |
55.00 |
495.00 |
75.00 |
675.00 |
55.00 |
495.00 |
|
|
| 718-01 |
fertilizer
|
150   |
LB |
2.20 |
330.00 |
5.00 |
750.00 |
2.00 |
300.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
60,000.00 |
60,000.00 |
80,000.00 |
80,000.00 |
90,000.00 |
90,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
65.00 |
260.00 |
60.00 |
240.00 |
70.00 |
280.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
75.00 |
300.00 |
75.00 |
300.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
272   |
EACH |
5.00 |
1,360.00 |
5.00 |
1,360.00 |
6.00 |
1,632.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.194 |
MILE |
2,500.00 |
12,985.00 |
2,500.00 |
12,985.00 |
3,000.00 |
15,582.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.034 |
MILE |
750.00 |
1,525.50 |
800.00 |
1,627.20 |
825.00 |
1,678.05 |
|
|
| 735-01 |
mailboxes
|
12   |
EACH |
1.00 |
12.00 |
5.00 |
60.00 |
5.50 |
66.00 |
|
|
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
125.00 |
1,250.00 |
200.00 |
2,000.00 |
175.00 |
1,750.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
200.00 |
200.00 |
300.00 |
300.00 |
285.00 |
285.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
9,250.00 |
9,250.00 |
1.00 |
1.00 |
10,000.00 |
10,000.00 |
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
60,000.00 |
60,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
785,450.73 |
|
807,647.84 |
|
972,372.01 |
|
|
|