Letting of 10/31/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 066-05-0025
Parish: ALLEN
Routes: LA 10
Description: LA 372 - EVANGELINE PARISH LINE
Type Const: grading, cold planing, pavement patching, pavement widening, superpave asphaltic
concrete pavement and related work.
Estimated Construction Cost: $774,110.67
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $785,450.73
2 34356 PRAIRIE CONTRACTORS INC. $807,647.84
3 12312 GILCHRIST CONSTRUCTION CO. LLC $972,372.01
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 546      LNFT 14.00 7,644.00 20.00 10,920.00 17.00 9,282.00    
203-07 borrow (vehicular measurement) 250      CUYD 25.00 6,250.00 30.00 7,500.00 20.00 5,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
1,206      CUYD 80.00 96,480.00 9.00 10,854.00 100.00 120,600.00    
502-01 superpave asphaltic concrete 3,199.7    TON 71.50 228,778.55 85.00 271,974.50 85.00 271,974.50    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
485.6    TON 130.00 63,128.00 130.00 63,128.00 165.00 80,124.00    
510-01-B pavement patching (12" minimum thickness) 2,131      SQYD 88.00 187,528.00 87.00 185,397.00 90.00 191,790.00    
510-02 pavement widening 439.4    SQYD 80.00 35,152.00 90.00 39,546.00 130.00 57,122.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 148.0    LNFT 35.00 5,180.00 34.00 5,032.00 35.00 5,180.00    
704-03 blocked out guard rail 325.0    LNFT 18.00 5,850.00 18.00 5,850.00 19.00 6,175.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 54.00 5,400.00 55.00 5,500.00 55.00 5,500.00    
704-11-B guard rail end treatment (tangent) 4      EACH 2,500.00 10,000.00 2,500.00 10,000.00 2,700.00 10,800.00    
713-01 temporary signs & barricades lump      LUMP 8,375.00 8,375.00 60,000.00 60,000.00 25,000.00 25,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
4.120  MILE 145.00 597.40 400.00 1,648.00 350.00 1,442.00    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.068  MILE 282.00 1,147.18 0.01 0.04 1.00 4.07    
713-04-A temporary pavement markings (solid line)(4" width) 10.388  MILE 575.00 5,973.10 0.01 0.10 1.00 10.39    
717-01 seeding 9      LB 55.00 495.00 75.00 675.00 55.00 495.00    
718-01 fertilizer 150      LB 2.20 330.00 5.00 750.00 2.00 300.00    
727-01 mobilization lump      LUMP 60,000.00 60,000.00 80,000.00 80,000.00 90,000.00 90,000.00    
729-16-B object marker assembly (type 2) 4      EACH 65.00 260.00 60.00 240.00 70.00 280.00    
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 75.00 300.00 75.00 300.00    
731-02 reflectorized raised pavement markers 272      EACH 5.00 1,360.00 5.00 1,360.00 6.00 1,632.00    
732-02-A plastic pavement striping (solid line) (4" width) 5.194  MILE 2,500.00 12,985.00 2,500.00 12,985.00 3,000.00 15,582.00    
732-03-A plastic pavement striping (broken line)(4" width) 2.034  MILE 750.00 1,525.50 800.00 1,627.20 825.00 1,678.05    
735-01 mailboxes 12      EACH 1.00 12.00 5.00 60.00 5.50 66.00    
735-02 mailbox supports (single) 10      EACH 125.00 1,250.00 200.00 2,000.00 175.00 1,750.00    
735-03 mailbox supports (double) 1      EACH 200.00 200.00 300.00 300.00 285.00 285.00    
740-01 construction layout lump      LUMP 9,250.00 9,250.00 1.00 1.00 10,000.00 10,000.00    
S-001 surface preparation lump      LUMP 30,000.00 30,000.00 30,000.00 30,000.00 60,000.00 60,000.00    
                       
 CONTRACTOR TOTAL       785,450.73   807,647.84   972,372.01    