| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
25.25 |
12,625.00 |
12.00 |
6,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
128   |
CUYD |
10.00 |
1,280.00 |
125.00 |
16,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
8,039.0 |
TON |
78.10 |
627,845.90 |
85.00 |
683,315.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
250.0 |
TON |
40.00 |
10,000.00 |
145.00 |
36,250.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
18,581   |
GAL |
2.80 |
52,026.80 |
2.50 |
46,452.50 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
45,320   |
SQYD |
1.74 |
78,856.80 |
1.00 |
45,320.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
69,491   |
SQYD |
1.50 |
104,236.50 |
3.00 |
208,473.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
500   |
SQYD |
30.00 |
15,000.00 |
40.00 |
20,000.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,500   |
SQYD |
40.00 |
60,000.00 |
80.00 |
120,000.00 |
|
|
|
|
| 510-03 |
pavement joint repair
|
80.0 |
TON |
215.00 |
17,200.00 |
200.00 |
16,000.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
150   |
SQYD |
100.00 |
15,000.00 |
115.00 |
17,250.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
59,100.00 |
59,100.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.300 |
MILE |
325.00 |
3,347.50 |
350.00 |
3,605.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.300 |
MILE |
1.00 |
10.30 |
1.00 |
10.30 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
20.600 |
MILE |
1.00 |
20.60 |
1.00 |
20.60 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
6.0 |
TON |
650.00 |
3,900.00 |
500.00 |
3,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
59,100.00 |
59,100.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
680   |
EACH |
4.50 |
3,060.00 |
6.00 |
4,080.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.300 |
MILE |
2,150.00 |
22,145.00 |
3,000.00 |
30,900.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.150 |
MILE |
700.00 |
3,605.00 |
750.00 |
3,862.50 |
|
|
|
|
| 735-01 |
mailboxes
|
8   |
EACH |
1.00 |
8.00 |
5.00 |
40.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
8   |
EACH |
145.00 |
1,160.00 |
250.00 |
2,000.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
3.00 |
ACRE |
1,200.00 |
3,600.00 |
1,000.00 |
3,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,800.00 |
12,800.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,165,927.40 |
|
1,391,578.90 |
|
|
|
|
|