Lead Project: 053-06-0017
Parish: RED RIVER
Routes: LA 1
Description: NATCHITOCHES PARISH LINE -JUNCTION US 84 (SOUTH SECTION)
Type Const: cold planing asphaltic pavement, pavement patching, superpave asphaltic concrete
overlay, asphaltic surface treatment and related work
Estimated Construction Cost: $1,010,166.70
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $1,165,927.40
2 12312 GILCHRIST CONSTRUCTION CO. LLC $1,391,578.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 500      CUYD 25.25 12,625.00 12.00 6,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
128      CUYD 10.00 1,280.00 125.00 16,000.00        
502-01 superpave asphaltic concrete 8,039.0    TON 78.10 627,845.90 85.00 683,315.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
250.0    TON 40.00 10,000.00 145.00 36,250.00        
507-01-A asphaltic material (crs-2p emulsion) 18,581      GAL 2.80 52,026.80 2.50 46,452.50        
507-02-B aggregate (s2) 45,320      SQYD 1.74 78,856.80 1.00 45,320.00        
509-01 cold planing asphaltic pavement 69,491      SQYD 1.50 104,236.50 3.00 208,473.00        
510-01-A pavement patching (6" minimum thickness) 500      SQYD 30.00 15,000.00 40.00 20,000.00        
510-01-B pavement patching (12" minimum thickness) 1,500      SQYD 40.00 60,000.00 80.00 120,000.00        
510-03 pavement joint repair 80.0    TON 215.00 17,200.00 200.00 16,000.00        
712-04 flexible revetment 150      SQYD 100.00 15,000.00 115.00 17,250.00        
713-01 temporary signs & barricades lump      LUMP 59,100.00 59,100.00 16,000.00 16,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
10.300  MILE 325.00 3,347.50 350.00 3,605.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
10.300  MILE 1.00 10.30 1.00 10.30        
713-04-A temporary pavement markings (solid line)(4" width) 20.600  MILE 1.00 20.60 1.00 20.60        
716-01-A mulch (vegetative) 6.0    TON 650.00 3,900.00 500.00 3,000.00        
727-01 mobilization lump      LUMP 59,100.00 59,100.00 100,000.00 100,000.00        
731-02 reflectorized raised pavement markers 680      EACH 4.50 3,060.00 6.00 4,080.00        
732-02-A plastic pavement striping (solid line) (4" width) 10.300  MILE 2,150.00 22,145.00 3,000.00 30,900.00        
732-03-A plastic pavement striping (broken line)(4" width) 5.150  MILE 700.00 3,605.00 750.00 3,862.50        
735-01 mailboxes 8      EACH 1.00 8.00 5.00 40.00        
735-02 mailbox supports (single) 8      EACH 145.00 1,160.00 250.00 2,000.00        
739-01 hydro-seeding 3.00   ACRE 1,200.00 3,600.00 1,000.00 3,000.00        
740-01 construction layout lump      LUMP 12,800.00 12,800.00 10,000.00 10,000.00        
                       
 CONTRACTOR TOTAL       1,165,927.40   1,391,578.90        