Letting of 10/31/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 029-03-0029
Parish: VERNON
Routes: LA 468
Description: US 171 - LA 8 BRIDGES
Type Const: grading, removal of bridges, drainage structures, lime treatment,class ii base course,
superpave asphaltic concrete pavement, concrete slab span bridges, and related work.
Estimated Construction Cost: $6,177,060.75
 
RankLicenseBidderConstruction Bid
1 08815 W. E. MCDONALD & SON, LLC. $6,383,813.92
2 34567 JAMES CONSTRUCTION GROUP LLC $7,165,024.80
3 12312 GILCHRIST CONSTRUCTION CO. LLC $7,623,569.31
4 00060 F. MILLER CONSTRUCTION LLC $8,997,103.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
F. MILLER CONSTRUCTION LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 300,000.00 300,000.00 250,000.00 250,000.00 100,000.00 100,000.00 50,000.00 50,000.00
202-01 removal of structures & obstructions lump      lump 10,000.00 10,000.00 15,000.00 15,000.00 35,000.00 35,000.00 3,000.00 3,000.00
202-02-A-01 removal of bridge (sta 1+529.74; 7.10 m x 81.40 m
timber bridge)
1      ea 31,000.00 31,000.00 55,000.00 55,000.00 25,000.00 25,000.00 150,000.00 150,000.00
202-02-A-02 removal of bridge (sta 2+036.63; 7.10 m x 17.57 m
timber bridge)
1      ea 18,000.00 18,000.00 18,000.00 18,000.00 10,000.00 10,000.00 40,000.00 40,000.00
202-02-A-03 removal of bridge (sta 3+271.87; 7.10 m x 14.03 m
timber bridge)
1      ea 18,000.00 18,000.00 17,000.00 17,000.00 10,000.00 10,000.00 40,000.00 40,000.00
202-02-A-04 removal of bridge (sta 4+275.83; 7.10 m x 35.00 m
timber bridge)
1      ea 25,000.00 25,000.00 28,000.00 28,000.00 10,000.00 10,000.00 35,000.00 35,000.00
202-02-B removal of concrete box culverts 1      ea 7,000.00 7,000.00 4,000.00 4,000.00 2,000.00 2,000.00 4,000.00 4,000.00
202-02-D removal of concrete walks & drives 70      sq m 100.00 7,000.00 25.00 1,750.00 20.00 1,400.00 10.00 700.00
202-02-G removal of surfacing & stabilized base 13,104.4    sq m 3.50 45,865.40 6.00 78,626.40 6.00 78,626.40 9.00 117,939.60
202-02-H removal of guard rail 820      ln m 7.00 5,740.00 15.00 12,300.00 28.50 23,370.00 13.00 10,660.00
202-02-01 removal of sign (sta. 3+100 lt., 3.65 m x 7.30 m) 1      ea 1,500.00 1,500.00 1,300.00 1,300.00 1,800.00 1,800.00 1,200.00 1,200.00
202-02-02 removal of metal canopy (sta. 4+439 lt., 9.14 m x
7.30 m)
1      ea 2,000.00 2,000.00 4,000.00 4,000.00 1,800.00 1,800.00 2,500.00 2,500.00
202-02-03 removal of concrete slab (sta. 4+440 lt., 9.14 m x
6.10 m)
1      ea 1,000.00 1,000.00 5,000.00 5,000.00 4,400.00 4,400.00 1,000.00 1,000.00
202-02-04 removal of pumps, dispensers, & consoles (sta.
4+441 lt., 0.6 m x 0.3 m)
1      ea 2,000.00 2,000.00 4,000.00 4,000.00 2,200.00 2,200.00 47,000.00 47,000.00
203-01 general excavation 13,642      cu m 7.00 95,494.00 10.00 136,420.00 9.00 122,778.00 15.00 204,630.00
203-02 drainage excavation 19,670      cu m 8.00 157,360.00 18.00 354,060.00 9.00 177,030.00 8.00 157,360.00
203-03 embankment 37,062      cu m 12.00 444,744.00 21.50 796,833.00 13.00 481,806.00 18.00 667,116.00
204-03 temporary slope drains 143      ln m 100.00 14,300.00 40.00 5,720.00 90.00 12,870.00 28.00 4,004.00
204-05-A temporary sediment check dams (hay) 30      ea 500.00 15,000.00 110.00 3,300.00 170.00 5,100.00 80.00 2,400.00
204-05-B temporary sediment check dams (stone) 10      ea 500.00 5,000.00 425.00 4,250.00 350.00 3,500.00 510.00 5,100.00
204-06 temporary silt fencing 3,042      ln m 9.00 27,378.00 12.00 36,504.00 5.80 17,643.60 5.00 15,210.00
302-02-C class ii base course (200 mm thick) 13,715.2    sq m 17.00 233,158.40 15.00 205,728.00 8.60 117,950.72 30.00 411,456.00
302-02-F class ii base course (300 mm thick) 966.1    sq m 37.00 35,745.70 55.00 53,135.50 32.00 30,915.20 29.00 28,016.90
302-02-G class ii base course (100 mm thick) 17,909.3    sq m 14.00 250,730.20 18.00 322,367.40 12.00 214,911.60 13.00 232,820.90
304-01 lime 51.41   Mg 275.00 14,137.75 200.00 10,282.00 150.00 7,711.50 155.00 7,968.55
304-04-D lime treatment (type d) (300 mm thick) 3,400      sq m 8.00 27,200.00 2.00 6,800.00 1.50 5,100.00 13.50 45,900.00
401-02 aggregate surface course (adjusted vehicular
measurement)
649      cu m 70.00 45,430.00 25.00 16,225.00 100.00 64,900.00 150.00 97,350.00
402-01 traffic maintenance aggregate (vehicular measurement) 250.0    cu m 90.00 22,500.00 55.00 13,750.00 60.00 15,000.00 150.00 37,500.00
502-01 superpave asphaltic concrete 3,522.2    Mg 125.00 440,275.00 110.50 389,203.10 100.00 352,220.00 140.00 493,108.00
502-01-A superpave asphaltic concrete, drives, turnouts, and
miscellaneous
532.3    Mg 150.00 79,845.00 150.00 79,845.00 170.00 90,491.00 190.00 101,137.00
701-01-K cross drain pipe (750 mm rcp/pcp) 25.0    ln m 300.00 7,500.00 380.00 9,500.00 360.00 9,000.00 375.00 9,375.00
701-03-G storm drain pipe (450 mm rcp/pcp) 74.0    ln m 225.00 16,650.00 270.00 19,980.00 250.00 18,500.00 200.00 14,800.00
701-03-G-01 storm drain pipe (450 mm pcp)(outfall) 27.0    ln m 225.00 6,075.00 230.00 6,210.00 250.00 6,750.00 190.00 5,130.00
701-05-G side drain pipe (450 mm) 24.0    ln m 225.00 5,400.00 260.00 6,240.00 250.00 6,000.00 195.00 4,680.00
701-05-I side drain pipe (600 mm) 46.0    ln m 325.00 14,950.00 330.00 15,180.00 320.00 14,720.00 230.00 10,580.00
701-05-K side drain pipe (750 mm) 19.0    ln m 350.00 6,650.00 430.00 8,170.00 700.00 13,300.00 370.00 7,030.00
702-03-C catch basins (cb-06) 4      ea 4,500.00 18,000.00 6,000.00 24,000.00 4,800.00 19,200.00 6,100.00 24,400.00
703-01 shoulder underdrain systems 288      ln m 50.00 14,400.00 45.00 12,960.00 94.00 27,072.00 44.00 12,672.00
704-03 blocked out guard rail 346.71   ln m 55.78 19,339.48 55.00 19,069.05 64.00 22,189.44 70.00 24,269.70
704-08-B guard rail transitions (double thrie beam) 121.92   ln m 164.00 19,994.88 165.00 20,116.80 185.00 22,555.20 195.00 23,774.40
704-11-A guard rail end treatment (flared) 16      ea 1,925.00 30,800.00 2,000.00 32,000.00 2,200.00 35,200.00 2,000.00 32,000.00
705-01 barbed wire fence 140      ln m 20.00 2,800.00 30.00 4,200.00 20.00 2,800.00 30.00 4,200.00
705-06-A chain link fence (1200 mm height) 69      ln m 100.00 6,900.00 65.00 4,485.00 95.00 6,555.00 65.00 4,485.00
705-08-A 6-meter double gates for chain link fence (1200 mm
height)
2      dbgt 950.00 1,900.00 1,000.00 2,000.00 865.00 1,730.00 1,100.00 2,200.00
706-02-C concrete drive (150 mm thick) 463.8    sq m 100.00 46,380.00 145.00 67,251.00 85.00 39,423.00 160.00 74,208.00
707-03 combination concrete curb & gutter 248.2    ln m 175.00 43,435.00 160.00 39,712.00 130.00 32,266.00 210.00 52,122.00
708-01 right-of-way monument 46      ea 125.00 5,750.00 200.00 9,200.00 400.00 18,400.00 300.00 13,800.00
708-02 right-of-way monument witness post 41      ea 125.00 5,125.00 200.00 8,200.00 400.00 16,400.00 300.00 12,300.00
711-01-D riprap (25 kg, 460 mm thick) 4,692      sq m 53.00 248,676.00 55.00 258,060.00 75.00 351,900.00 60.00 281,520.00
711-04 geotextile fabric 4,692      sq m 2.50 11,730.00 3.00 14,076.00 2.50 11,730.00 2.00 9,384.00
712-04 flexible revetment 6,096      sq m 52.00 316,992.00 55.00 335,280.00 75.00 457,200.00 65.00 396,240.00
713-01 temporary signs & barricades lump      lump 85,000.00 85,000.00 65,000.00 65,000.00 100,000.00 100,000.00 134,000.00 134,000.00
716-01-A mulch (vegetative) 24.8    kg 350.00 8,680.00 550.00 13,640.00 350.00 8,680.00 125.00 3,100.00
717-01 seeding 498      kg 15.43 7,684.14 45.00 22,410.00 15.00 7,470.00 12.00 5,976.00
718-01 fertilizer 8,210      kg 0.65 5,336.50 0.80 6,568.00 0.75 6,157.50 1.00 8,210.00
720-01-A erosion control system, slope protection (type a) 7,834      sq m 1.35 10,575.90 1.25 9,792.50 1.50 11,751.00 2.00 15,668.00
722-01 project site laboratory 1      ea 25,000.00 25,000.00 12,500.00 12,500.00 90,000.00 90,000.00 20,000.00 20,000.00
726-01 bedding material 103.4    cu m 125.00 12,925.00 115.00 11,891.00 100.00 10,340.00 110.00 11,374.00
727-01 mobilization lump      lump 430,000.00 430,000.00 630,000.00 630,000.00 760,000.00 760,000.00 708,115.00 708,115.00
729-16-B object marker assembly (type 2) 2      ea 65.00 130.00 65.00 130.00 75.00 150.00 65.00 130.00
729-16-C object marker assembly (type 3) 16      ea 69.00 1,104.00 70.00 1,120.00 80.00 1,280.00 85.00 1,360.00
731-02 reflectorized raised pavement markers 162      ea 5.10 826.20 5.00 810.00 6.00 972.00 6.00 972.00
732-02-A plastic pavement striping (solid line) (100 mm width) 7.768  km 1,590.00 12,351.12 1,600.00 12,428.80 1,800.00 13,982.40 2,000.00 15,536.00
735-01 mailboxes 10      ea 1.00 10.00 10.00 100.00 5.00 50.00 40.00 400.00
735-02 mailbox supports (single) 10      ea 200.00 2,000.00 150.00 1,500.00 200.00 2,000.00 250.00 2,500.00
740-01 construction layout lump      lump 80,000.00 80,000.00 106,000.00 106,000.00 125,000.00 125,000.00 180,000.00 180,000.00
740-02 utility oversight and coordination lump      lump 50,000.00 50,000.00 20,000.00 20,000.00 16,000.00 16,000.00 10,000.00 10,000.00
804-01-C precast concrete piles (400 mm) 1,856.5    ln m 200.00 371,300.00 250.00 464,125.00 150.00 278,475.00 214.00 397,291.00
804-01-D precast concrete piles (450 mm) 774.0    ln m 250.00 193,500.00 280.00 216,720.00 165.00 127,710.00 397.00 307,278.00
804-05 precast concrete test piles 1      ea 17,000.00 17,000.00 56,000.00 56,000.00 11,000.00 11,000.00 11,000.00 11,000.00
804-09 loading test piles 1      ea 10,000.00 10,000.00 6,000.00 6,000.00 12,000.00 12,000.00 4,700.00 4,700.00
804-10 reloading test piles 1      ea 1.00 1.00 1,000.00 1,000.00 6,600.00 6,600.00 1,000.00 1,000.00
804-11 redriving test piles 1      ea 1.00 1.00 500.00 500.00 4,000.00 4,000.00 2,000.00 2,000.00
804-12 loading permanent piles 4      ea 1.00 4.00 2,000.00 8,000.00 6,000.00 24,000.00 100.00 400.00
804-17 dynamic monitoring 3      ea 2,500.00 7,500.00 1,500.00 4,500.00 3,800.00 11,400.00 2,600.00 7,800.00
805-01-F class a concrete (bents) 214.26   cu m 850.00 182,121.00 1,000.00 214,260.00 1,500.00 321,390.00 2,300.00 492,798.00
805-03 class aa concrete 932.73   cu m 750.00 699,547.50 825.00 769,502.25 1,475.00 1,375,776.75 1,425.00 1,329,140.25
806-01 deformed reinforcing steel 119,493      kg 2.75 328,605.75 2.00 238,986.00 4.00 477,972.00 4.00 477,972.00
810-01 concrete railing (barrier) 228.00   ln m 225.00 51,300.00 185.00 42,180.00 200.00 45,600.00 65.00 14,820.00
813-01 concrete approach slabs 1,180.80   sq m 250.00 295,200.00 200.00 236,160.00 260.00 307,008.00 270.00 318,816.00
S-001 saw cutting of existing pavement (full depth) 126      ln m 10.00 1,260.00 12.00 1,512.00 15.00 1,890.00 500.00 63,000.00
S-101 dynamic analysis 3      ea 2,500.00 7,500.00 1,000.00 3,000.00 3,400.00 10,200.00 3,000.00 9,000.00
S-102 ornamental concrete railing 168      ln m 1,500.00 252,000.00 800.00 134,400.00 1,750.00 294,000.00 2,400.00 403,200.00
S-103 vibration monitoring lump      lump 3,500.00 3,500.00 10,000.00 10,000.00 2,300.00 2,300.00 6,300.00 6,300.00
                       
 CONTRACTOR TOTAL       6,383,813.92   7,165,024.80   7,623,569.31   8,997,103.30