| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - F. MILLER CONSTRUCTION LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
300,000.00 |
300,000.00 |
250,000.00 |
250,000.00 |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
35,000.00 |
35,000.00 |
3,000.00 |
3,000.00 |
| 202-02-A-01 |
removal of bridge (sta 1+529.74; 7.10 m x 81.40 m
timber bridge) |
1   |
ea |
31,000.00 |
31,000.00 |
55,000.00 |
55,000.00 |
25,000.00 |
25,000.00 |
150,000.00 |
150,000.00 |
| 202-02-A-02 |
removal of bridge (sta 2+036.63; 7.10 m x 17.57 m
timber bridge) |
1   |
ea |
18,000.00 |
18,000.00 |
18,000.00 |
18,000.00 |
10,000.00 |
10,000.00 |
40,000.00 |
40,000.00 |
| 202-02-A-03 |
removal of bridge (sta 3+271.87; 7.10 m x 14.03 m
timber bridge) |
1   |
ea |
18,000.00 |
18,000.00 |
17,000.00 |
17,000.00 |
10,000.00 |
10,000.00 |
40,000.00 |
40,000.00 |
| 202-02-A-04 |
removal of bridge (sta 4+275.83; 7.10 m x 35.00 m
timber bridge) |
1   |
ea |
25,000.00 |
25,000.00 |
28,000.00 |
28,000.00 |
10,000.00 |
10,000.00 |
35,000.00 |
35,000.00 |
| 202-02-B |
removal of concrete box culverts
|
1   |
ea |
7,000.00 |
7,000.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
70   |
sq m |
100.00 |
7,000.00 |
25.00 |
1,750.00 |
20.00 |
1,400.00 |
10.00 |
700.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
13,104.4 |
sq m |
3.50 |
45,865.40 |
6.00 |
78,626.40 |
6.00 |
78,626.40 |
9.00 |
117,939.60 |
| 202-02-H |
removal of guard rail
|
820   |
ln m |
7.00 |
5,740.00 |
15.00 |
12,300.00 |
28.50 |
23,370.00 |
13.00 |
10,660.00 |
| 202-02-01 |
removal of sign (sta. 3+100 lt., 3.65 m x 7.30 m)
|
1   |
ea |
1,500.00 |
1,500.00 |
1,300.00 |
1,300.00 |
1,800.00 |
1,800.00 |
1,200.00 |
1,200.00 |
| 202-02-02 |
removal of metal canopy (sta. 4+439 lt., 9.14 m x
7.30 m) |
1   |
ea |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
1,800.00 |
1,800.00 |
2,500.00 |
2,500.00 |
| 202-02-03 |
removal of concrete slab (sta. 4+440 lt., 9.14 m x
6.10 m) |
1   |
ea |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
4,400.00 |
4,400.00 |
1,000.00 |
1,000.00 |
| 202-02-04 |
removal of pumps, dispensers, & consoles (sta.
4+441 lt., 0.6 m x 0.3 m) |
1   |
ea |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
2,200.00 |
2,200.00 |
47,000.00 |
47,000.00 |
| 203-01 |
general excavation
|
13,642   |
cu m |
7.00 |
95,494.00 |
10.00 |
136,420.00 |
9.00 |
122,778.00 |
15.00 |
204,630.00 |
| 203-02 |
drainage excavation
|
19,670   |
cu m |
8.00 |
157,360.00 |
18.00 |
354,060.00 |
9.00 |
177,030.00 |
8.00 |
157,360.00 |
| 203-03 |
embankment
|
37,062   |
cu m |
12.00 |
444,744.00 |
21.50 |
796,833.00 |
13.00 |
481,806.00 |
18.00 |
667,116.00 |
| 204-03 |
temporary slope drains
|
143   |
ln m |
100.00 |
14,300.00 |
40.00 |
5,720.00 |
90.00 |
12,870.00 |
28.00 |
4,004.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
30   |
ea |
500.00 |
15,000.00 |
110.00 |
3,300.00 |
170.00 |
5,100.00 |
80.00 |
2,400.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
10   |
ea |
500.00 |
5,000.00 |
425.00 |
4,250.00 |
350.00 |
3,500.00 |
510.00 |
5,100.00 |
| 204-06 |
temporary silt fencing
|
3,042   |
ln m |
9.00 |
27,378.00 |
12.00 |
36,504.00 |
5.80 |
17,643.60 |
5.00 |
15,210.00 |
| 302-02-C |
class ii base course (200 mm thick)
|
13,715.2 |
sq m |
17.00 |
233,158.40 |
15.00 |
205,728.00 |
8.60 |
117,950.72 |
30.00 |
411,456.00 |
| 302-02-F |
class ii base course (300 mm thick)
|
966.1 |
sq m |
37.00 |
35,745.70 |
55.00 |
53,135.50 |
32.00 |
30,915.20 |
29.00 |
28,016.90 |
| 302-02-G |
class ii base course (100 mm thick)
|
17,909.3 |
sq m |
14.00 |
250,730.20 |
18.00 |
322,367.40 |
12.00 |
214,911.60 |
13.00 |
232,820.90 |
| 304-01 |
lime
|
51.41 |
Mg |
275.00 |
14,137.75 |
200.00 |
10,282.00 |
150.00 |
7,711.50 |
155.00 |
7,968.55 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
3,400   |
sq m |
8.00 |
27,200.00 |
2.00 |
6,800.00 |
1.50 |
5,100.00 |
13.50 |
45,900.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
649   |
cu m |
70.00 |
45,430.00 |
25.00 |
16,225.00 |
100.00 |
64,900.00 |
150.00 |
97,350.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
250.0 |
cu m |
90.00 |
22,500.00 |
55.00 |
13,750.00 |
60.00 |
15,000.00 |
150.00 |
37,500.00 |
| 502-01 |
superpave asphaltic concrete
|
3,522.2 |
Mg |
125.00 |
440,275.00 |
110.50 |
389,203.10 |
100.00 |
352,220.00 |
140.00 |
493,108.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
532.3 |
Mg |
150.00 |
79,845.00 |
150.00 |
79,845.00 |
170.00 |
90,491.00 |
190.00 |
101,137.00 |
| 701-01-K |
cross drain pipe (750 mm rcp/pcp)
|
25.0 |
ln m |
300.00 |
7,500.00 |
380.00 |
9,500.00 |
360.00 |
9,000.00 |
375.00 |
9,375.00 |
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
74.0 |
ln m |
225.00 |
16,650.00 |
270.00 |
19,980.00 |
250.00 |
18,500.00 |
200.00 |
14,800.00 |
| 701-03-G-01 |
storm drain pipe (450 mm pcp)(outfall)
|
27.0 |
ln m |
225.00 |
6,075.00 |
230.00 |
6,210.00 |
250.00 |
6,750.00 |
190.00 |
5,130.00 |
| 701-05-G |
side drain pipe (450 mm)
|
24.0 |
ln m |
225.00 |
5,400.00 |
260.00 |
6,240.00 |
250.00 |
6,000.00 |
195.00 |
4,680.00 |
| 701-05-I |
side drain pipe (600 mm)
|
46.0 |
ln m |
325.00 |
14,950.00 |
330.00 |
15,180.00 |
320.00 |
14,720.00 |
230.00 |
10,580.00 |
| 701-05-K |
side drain pipe (750 mm)
|
19.0 |
ln m |
350.00 |
6,650.00 |
430.00 |
8,170.00 |
700.00 |
13,300.00 |
370.00 |
7,030.00 |
| 702-03-C |
catch basins (cb-06)
|
4   |
ea |
4,500.00 |
18,000.00 |
6,000.00 |
24,000.00 |
4,800.00 |
19,200.00 |
6,100.00 |
24,400.00 |
| 703-01 |
shoulder underdrain systems
|
288   |
ln m |
50.00 |
14,400.00 |
45.00 |
12,960.00 |
94.00 |
27,072.00 |
44.00 |
12,672.00 |
| 704-03 |
blocked out guard rail
|
346.71 |
ln m |
55.78 |
19,339.48 |
55.00 |
19,069.05 |
64.00 |
22,189.44 |
70.00 |
24,269.70 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
121.92 |
ln m |
164.00 |
19,994.88 |
165.00 |
20,116.80 |
185.00 |
22,555.20 |
195.00 |
23,774.40 |
| 704-11-A |
guard rail end treatment (flared)
|
16   |
ea |
1,925.00 |
30,800.00 |
2,000.00 |
32,000.00 |
2,200.00 |
35,200.00 |
2,000.00 |
32,000.00 |
| 705-01 |
barbed wire fence
|
140   |
ln m |
20.00 |
2,800.00 |
30.00 |
4,200.00 |
20.00 |
2,800.00 |
30.00 |
4,200.00 |
| 705-06-A |
chain link fence (1200 mm height)
|
69   |
ln m |
100.00 |
6,900.00 |
65.00 |
4,485.00 |
95.00 |
6,555.00 |
65.00 |
4,485.00 |
| 705-08-A |
6-meter double gates for chain link fence (1200 mm
height) |
2   |
dbgt |
950.00 |
1,900.00 |
1,000.00 |
2,000.00 |
865.00 |
1,730.00 |
1,100.00 |
2,200.00 |
| 706-02-C |
concrete drive (150 mm thick)
|
463.8 |
sq m |
100.00 |
46,380.00 |
145.00 |
67,251.00 |
85.00 |
39,423.00 |
160.00 |
74,208.00 |
| 707-03 |
combination concrete curb & gutter
|
248.2 |
ln m |
175.00 |
43,435.00 |
160.00 |
39,712.00 |
130.00 |
32,266.00 |
210.00 |
52,122.00 |
| 708-01 |
right-of-way monument
|
46   |
ea |
125.00 |
5,750.00 |
200.00 |
9,200.00 |
400.00 |
18,400.00 |
300.00 |
13,800.00 |
| 708-02 |
right-of-way monument witness post
|
41   |
ea |
125.00 |
5,125.00 |
200.00 |
8,200.00 |
400.00 |
16,400.00 |
300.00 |
12,300.00 |
| 711-01-D |
riprap (25 kg, 460 mm thick)
|
4,692   |
sq m |
53.00 |
248,676.00 |
55.00 |
258,060.00 |
75.00 |
351,900.00 |
60.00 |
281,520.00 |
| 711-04 |
geotextile fabric
|
4,692   |
sq m |
2.50 |
11,730.00 |
3.00 |
14,076.00 |
2.50 |
11,730.00 |
2.00 |
9,384.00 |
| 712-04 |
flexible revetment
|
6,096   |
sq m |
52.00 |
316,992.00 |
55.00 |
335,280.00 |
75.00 |
457,200.00 |
65.00 |
396,240.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
85,000.00 |
85,000.00 |
65,000.00 |
65,000.00 |
100,000.00 |
100,000.00 |
134,000.00 |
134,000.00 |
| 716-01-A |
mulch (vegetative)
|
24.8 |
kg |
350.00 |
8,680.00 |
550.00 |
13,640.00 |
350.00 |
8,680.00 |
125.00 |
3,100.00 |
| 717-01 |
seeding
|
498   |
kg |
15.43 |
7,684.14 |
45.00 |
22,410.00 |
15.00 |
7,470.00 |
12.00 |
5,976.00 |
| 718-01 |
fertilizer
|
8,210   |
kg |
0.65 |
5,336.50 |
0.80 |
6,568.00 |
0.75 |
6,157.50 |
1.00 |
8,210.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
7,834   |
sq m |
1.35 |
10,575.90 |
1.25 |
9,792.50 |
1.50 |
11,751.00 |
2.00 |
15,668.00 |
| 722-01 |
project site laboratory
|
1   |
ea |
25,000.00 |
25,000.00 |
12,500.00 |
12,500.00 |
90,000.00 |
90,000.00 |
20,000.00 |
20,000.00 |
| 726-01 |
bedding material
|
103.4 |
cu m |
125.00 |
12,925.00 |
115.00 |
11,891.00 |
100.00 |
10,340.00 |
110.00 |
11,374.00 |
| 727-01 |
mobilization
|
lump |
lump |
430,000.00 |
430,000.00 |
630,000.00 |
630,000.00 |
760,000.00 |
760,000.00 |
708,115.00 |
708,115.00 |
| 729-16-B |
object marker assembly (type 2)
|
2   |
ea |
65.00 |
130.00 |
65.00 |
130.00 |
75.00 |
150.00 |
65.00 |
130.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
ea |
69.00 |
1,104.00 |
70.00 |
1,120.00 |
80.00 |
1,280.00 |
85.00 |
1,360.00 |
| 731-02 |
reflectorized raised pavement markers
|
162   |
ea |
5.10 |
826.20 |
5.00 |
810.00 |
6.00 |
972.00 |
6.00 |
972.00 |
| 732-02-A |
plastic pavement striping (solid line) (100 mm width)
|
7.768 |
km |
1,590.00 |
12,351.12 |
1,600.00 |
12,428.80 |
1,800.00 |
13,982.40 |
2,000.00 |
15,536.00 |
| 735-01 |
mailboxes
|
10   |
ea |
1.00 |
10.00 |
10.00 |
100.00 |
5.00 |
50.00 |
40.00 |
400.00 |
| 735-02 |
mailbox supports (single)
|
10   |
ea |
200.00 |
2,000.00 |
150.00 |
1,500.00 |
200.00 |
2,000.00 |
250.00 |
2,500.00 |
| 740-01 |
construction layout
|
lump |
lump |
80,000.00 |
80,000.00 |
106,000.00 |
106,000.00 |
125,000.00 |
125,000.00 |
180,000.00 |
180,000.00 |
| 740-02 |
utility oversight and coordination
|
lump |
lump |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
16,000.00 |
16,000.00 |
10,000.00 |
10,000.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
1,856.5 |
ln m |
200.00 |
371,300.00 |
250.00 |
464,125.00 |
150.00 |
278,475.00 |
214.00 |
397,291.00 |
| 804-01-D |
precast concrete piles (450 mm)
|
774.0 |
ln m |
250.00 |
193,500.00 |
280.00 |
216,720.00 |
165.00 |
127,710.00 |
397.00 |
307,278.00 |
| 804-05 |
precast concrete test piles
|
1   |
ea |
17,000.00 |
17,000.00 |
56,000.00 |
56,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
| 804-09 |
loading test piles
|
1   |
ea |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
12,000.00 |
12,000.00 |
4,700.00 |
4,700.00 |
| 804-10 |
reloading test piles
|
1   |
ea |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
6,600.00 |
6,600.00 |
1,000.00 |
1,000.00 |
| 804-11 |
redriving test piles
|
1   |
ea |
1.00 |
1.00 |
500.00 |
500.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
| 804-12 |
loading permanent piles
|
4   |
ea |
1.00 |
4.00 |
2,000.00 |
8,000.00 |
6,000.00 |
24,000.00 |
100.00 |
400.00 |
| 804-17 |
dynamic monitoring
|
3   |
ea |
2,500.00 |
7,500.00 |
1,500.00 |
4,500.00 |
3,800.00 |
11,400.00 |
2,600.00 |
7,800.00 |
| 805-01-F |
class a concrete (bents)
|
214.26 |
cu m |
850.00 |
182,121.00 |
1,000.00 |
214,260.00 |
1,500.00 |
321,390.00 |
2,300.00 |
492,798.00 |
| 805-03 |
class aa concrete
|
932.73 |
cu m |
750.00 |
699,547.50 |
825.00 |
769,502.25 |
1,475.00 |
1,375,776.75 |
1,425.00 |
1,329,140.25 |
| 806-01 |
deformed reinforcing steel
|
119,493   |
kg |
2.75 |
328,605.75 |
2.00 |
238,986.00 |
4.00 |
477,972.00 |
4.00 |
477,972.00 |
| 810-01 |
concrete railing (barrier)
|
228.00 |
ln m |
225.00 |
51,300.00 |
185.00 |
42,180.00 |
200.00 |
45,600.00 |
65.00 |
14,820.00 |
| 813-01 |
concrete approach slabs
|
1,180.80 |
sq m |
250.00 |
295,200.00 |
200.00 |
236,160.00 |
260.00 |
307,008.00 |
270.00 |
318,816.00 |
| S-001 |
saw cutting of existing pavement (full depth)
|
126   |
ln m |
10.00 |
1,260.00 |
12.00 |
1,512.00 |
15.00 |
1,890.00 |
500.00 |
63,000.00 |
| S-101 |
dynamic analysis
|
3   |
ea |
2,500.00 |
7,500.00 |
1,000.00 |
3,000.00 |
3,400.00 |
10,200.00 |
3,000.00 |
9,000.00 |
| S-102 |
ornamental concrete railing
|
168   |
ln m |
1,500.00 |
252,000.00 |
800.00 |
134,400.00 |
1,750.00 |
294,000.00 |
2,400.00 |
403,200.00 |
| S-103 |
vibration monitoring
|
lump |
lump |
3,500.00 |
3,500.00 |
10,000.00 |
10,000.00 |
2,300.00 |
2,300.00 |
6,300.00 |
6,300.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
6,383,813.92 |
|
7,165,024.80 |
|
7,623,569.31 |
|
8,997,103.30 |
|