| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,776   |
LNFT |
7.00 |
12,432.00 |
7.50 |
13,320.00 |
20.00 |
35,520.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
90   |
CUYD |
30.00 |
2,700.00 |
45.00 |
4,050.00 |
25.00 |
2,250.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
328   |
CUYD |
20.00 |
6,560.00 |
65.00 |
21,320.00 |
50.00 |
16,400.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
14,983.9 |
TON |
98.00 |
1,468,422.20 |
92.00 |
1,378,518.80 |
100.00 |
1,498,390.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,527.5 |
TON |
98.00 |
149,695.00 |
200.00 |
305,500.00 |
165.00 |
252,037.50 |
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
58,272   |
GAL |
2.30 |
134,025.60 |
3.00 |
174,816.00 |
3.50 |
203,952.00 |
|
|
| 507-02-B |
aggregate (s2)
|
104,645   |
SQYD |
0.90 |
94,180.50 |
1.50 |
156,967.50 |
1.10 |
115,109.50 |
|
|
| 507-02-C |
aggregate (s3)
|
56,914   |
SQYD |
0.70 |
39,839.80 |
1.25 |
71,142.50 |
1.10 |
62,605.40 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
136,216   |
SQYD |
2.75 |
374,594.00 |
2.25 |
306,486.00 |
2.35 |
320,107.60 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,783   |
CUYD |
0.01 |
- 37.83 |
0.10 |
- 378.30 |
0.01 |
- 37.83 |
|
|
| 510-01-C |
pavement patching (18" minimum thickness)
|
424   |
SQYD |
175.00 |
74,200.00 |
200.00 |
84,800.00 |
220.00 |
93,280.00 |
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
80   |
LNFT |
175.00 |
14,000.00 |
200.00 |
16,000.00 |
350.00 |
28,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
1,200.0 |
LNFT |
18.00 |
21,600.00 |
20.00 |
24,000.00 |
20.00 |
24,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
250.0 |
LNFT |
50.00 |
12,500.00 |
50.00 |
12,500.00 |
60.00 |
15,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
10   |
EACH |
2,000.00 |
20,000.00 |
2,250.00 |
22,500.00 |
2,500.00 |
25,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
255,000.00 |
255,000.00 |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line) (4" width)
(4' length) |
32.761 |
MILE |
200.00 |
6,552.20 |
150.00 |
4,914.15 |
100.00 |
3,276.10 |
|
|
| 713-03-B |
temporary pavement markings (broken line) (4" width)
(10' length) |
32.761 |
MILE |
150.00 |
4,914.15 |
400.00 |
13,104.40 |
100.00 |
3,276.10 |
|
|
| 713-04-A |
temporary pavement markings (solid line) (4" width)
|
73.374 |
MILE |
1.00 |
73.37 |
800.00 |
58,699.20 |
950.00 |
69,705.30 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
520   |
EACH |
1.75 |
910.00 |
2.00 |
1,040.00 |
1.75 |
910.00 |
|
|
| 726-01 |
bedding material
|
23.1 |
CUYD |
100.00 |
2,310.00 |
100.00 |
2,310.00 |
120.00 |
2,772.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
330,000.00 |
330,000.00 |
450,000.00 |
450,000.00 |
295,000.00 |
295,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
10   |
EACH |
95.00 |
950.00 |
80.00 |
800.00 |
80.00 |
800.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,459   |
EACH |
9.00 |
22,131.00 |
5.00 |
12,295.00 |
7.00 |
17,213.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
876   |
LNFT |
12.50 |
10,950.00 |
4.00 |
3,504.00 |
4.50 |
3,942.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.840 |
MILE |
3,000.00 |
65,520.00 |
3,000.00 |
65,520.00 |
3,200.00 |
69,888.00 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.080 |
MILE |
26,000.00 |
2,080.00 |
7,000.00 |
560.00 |
6,500.00 |
520.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
10.920 |
MILE |
1,800.00 |
19,656.00 |
800.00 |
8,736.00 |
1,500.00 |
16,380.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
28   |
EACH |
300.00 |
8,400.00 |
200.00 |
5,600.00 |
230.00 |
6,440.00 |
|
|
| 732-05 |
removal of existing markings
|
0.044 |
MILE |
45,000.00 |
1,980.00 |
12,000.00 |
528.00 |
10,000.00 |
440.00 |
|
|
| 735-01 |
mailboxes
|
33   |
EACH |
21.00 |
693.00 |
1.00 |
33.00 |
10.00 |
330.00 |
|
|
| 735-02 |
mailbox supports (single)
|
28   |
EACH |
180.00 |
5,040.00 |
125.00 |
3,500.00 |
200.00 |
5,600.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
200.00 |
200.00 |
180.00 |
180.00 |
250.00 |
250.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
350.00 |
350.00 |
300.00 |
300.00 |
350.00 |
350.00 |
|
|
| S-001 |
ultra-thin hmac wearing course system (0.75 inch thick)
|
195,038   |
SQYD |
7.25 |
1,414,025.50 |
7.50 |
1,462,785.00 |
9.00 |
1,755,342.00 |
|
|
| S-003 |
raising and/or undersealing concrete approach slab
|
8,200   |
LB |
5.50 |
45,100.00 |
6.00 |
49,200.00 |
5.00 |
41,000.00 |
|
|
| S-004 |
soil compaction at depth
|
1,250   |
LB |
6.50 |
8,125.00 |
8.00 |
10,000.00 |
7.50 |
9,375.00 |
|
|
| S-005 |
radar traffic sensor and recorder system
|
1   |
EACH |
26,000.00 |
26,000.00 |
30,000.00 |
30,000.00 |
35,000.00 |
35,000.00 |
|
|
| S-006 |
concrete island
|
lump |
LUMP |
7,500.00 |
7,500.00 |
9,000.00 |
9,000.00 |
18,000.00 |
18,000.00 |
|
|
| S-007 |
alter existing ditch
|
lump |
LUMP |
7,500.00 |
7,500.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-008 |
saw cuts
|
1,268   |
LNFT |
4.00 |
5,072.00 |
4.00 |
5,072.00 |
6.00 |
7,608.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,675,743.49 |
|
4,845,223.25 |
|
5,095,031.67 |
|
|
|