Letting of 10/31/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 008-05-0035
Parish: ST LANDRY
Routes: US 71
Description: 1.2 MI. N. OF FLOODWAY LEVEE - W. LA 10
Type Const: pavement patching, cold planing asphaltic pavement, superpave asphaltic concrete
pavement and related work.
Estimated Construction Cost: $4,508,179.82
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,521,293.52
2 12312 GILCHRIST CONSTRUCTION CO. LLC $3,566,670.12
3 00481 COASTAL BRIDGE CO., L.L.C. $3,742,505.88
4 34356 PRAIRIE CONTRACTORS INC. $3,786,748.05
5 04089 H & S CONSTRUCTION CO., INC. $4,900,310.96
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
COASTAL BRIDGE CO., L.L.C.
- 4 -
PRAIRIE CONTRACTORS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 2,363      CUYD 22.00 51,986.00 10.00 23,630.00 15.00 35,445.00 8.00 18,904.00
204-05-A temporary sediment check dams (hay) 20      EACH 300.00 6,000.00 80.00 1,600.00 110.00 2,200.00 200.00 4,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
125      CUYD 42.00 5,250.00 100.00 12,500.00 80.00 10,000.00 100.00 12,500.00
502-01 superpave asphaltic concrete 28,975.3    TON 69.00 1,999,295.70 78.00 2,260,073.40 71.50 2,071,733.95 85.50 2,477,388.15
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
508.0    TON 156.00 79,248.00 160.00 81,280.00 125.00 63,500.00 140.00 71,120.00
509-01 cold planing asphaltic pavement 123,034      SQYD 1.60 196,854.40 0.60 73,820.40 1.95 239,916.30 1.50 184,551.00
509-02 contractor retained reclaimed asphaltic pavement - 5,060      CUYD 0.10 - 506.00 0.01 - 50.60 0.01 - 50.60 0.01 - 50.60
510-01-A pavement patching (6" minimum thickness) 180      SQYD 67.00 12,060.00 72.00 12,960.00 40.00 7,200.00 90.00 16,200.00
510-01-C pavement patching (15" minimum thickness) 250      SQYD 134.00 33,500.00 185.00 46,250.00 125.00 31,250.00 100.00 25,000.00
510-03 pavement joint repair 424.8    TON 245.00 104,076.00 110.00 46,728.00 150.00 63,720.00 50.00 21,240.00
713-01 temporary signs & barricades lump      LUMP 13,000.00 13,000.00 10,000.00 10,000.00 90,000.00 90,000.00 16,500.00 16,500.00
713-02-C temporary pavement markings (8" width) 2,944      LNFT 0.25 736.00 0.50 1,472.00 0.25 736.00 0.25 736.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
24.709  MILE 135.00 3,335.72 330.00 8,153.97 325.00 8,030.43 400.00 9,883.60
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
8.056  MILE 325.00 2,618.20 1.00 8.06 300.00 2,416.80 1,550.00 12,486.80
713-04-A temporary pavement markings (solid line)(4" width) 17.631  MILE 650.00 11,460.15 1.00 17.63 600.00 10,578.60 800.00 14,104.80
727-01 mobilization lump      LUMP 95,000.00 95,000.00 185,000.00 185,000.00 185,000.00 185,000.00 50,000.00 50,000.00
729-16-B object marker assembly (type 2) 12      EACH 85.00 1,020.00 60.00 720.00 70.00 840.00 100.00 1,200.00
731-02 reflectorized raised pavement markers 1,441      EACH 5.00 7,205.00 5.50 7,925.50 5.00 7,205.00 5.00 7,205.00
732-01-C plastic pavement striping (8" width) 502      LNFT 1.20 602.40 1.00 502.00 1.10 552.20 2.00 1,004.00
732-01-E plastic pavement striping (24" width) 1,113      LNFT 3.35 3,728.55 3.40 3,784.20 3.30 3,672.90 4.00 4,452.00
732-02-A plastic pavement striping (solid line) (4" width) 17.631  MILE 2,542.00 44,818.00 2,800.00 49,366.80 2,500.00 44,077.50 2,500.00 44,077.50
732-03-A plastic pavement striping (broken line)(4" width) 8.056  MILE 775.00 6,243.40 760.00 6,122.56 800.00 6,444.80 800.00 6,444.80
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 165.00 495.00 195.00 585.00 175.00 525.00 200.00 600.00
740-01 construction layout lump      LUMP 12,000.00 12,000.00 6,000.00 6,000.00 25,000.00 25,000.00 10,000.00 10,000.00
S-001 rumble strips (ground-in) 16.6    MILE 675.00 11,205.00 600.00 9,960.00 750.00 12,450.00 825.00 13,695.00
S-006 roadway reinforcing mesh (complete road system) 113,112      SQYD 7.25 820,062.00 6.35 718,261.20 7.25 820,062.00 6.75 763,506.00
                       
 CONTRACTOR TOTAL       3,521,293.52   3,566,670.12   3,742,505.88   3,786,748.05
 
Item Number Item Description Quantity Unit of Measure - 5 -
H & S CONSTRUCTION CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 2,363      CUYD 20.00 47,260.00            
204-05-A temporary sediment check dams (hay) 20      EACH 140.00 2,800.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
125      CUYD 68.00 8,500.00            
502-01 superpave asphaltic concrete 28,975.3    TON 98.00 2,839,579.40            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
508.0    TON 135.00 68,580.00            
509-01 cold planing asphaltic pavement 123,034      SQYD 1.35 166,095.90            
509-02 contractor retained reclaimed asphaltic pavement - 5,060      CUYD 0.01 - 50.60            
510-01-A pavement patching (6" minimum thickness) 180      SQYD 82.00 14,760.00            
510-01-C pavement patching (15" minimum thickness) 250      SQYD 150.00 37,500.00            
510-03 pavement joint repair 424.8    TON 750.00 318,600.00            
713-01 temporary signs & barricades lump      LUMP 165,000.00 165,000.00            
713-02-C temporary pavement markings (8" width) 2,944      LNFT 0.35 1,030.40            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
24.709  MILE 375.00 9,265.88            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
8.056  MILE 355.00 2,859.88            
713-04-A temporary pavement markings (solid line)(4" width) 17.631  MILE 510.00 8,991.81            
727-01 mobilization lump      LUMP 250,000.00 250,000.00            
729-16-B object marker assembly (type 2) 12      EACH 98.00 1,176.00            
731-02 reflectorized raised pavement markers 1,441      EACH 6.01 8,660.41            
732-01-C plastic pavement striping (8" width) 502      LNFT 1.06 532.12            
732-01-E plastic pavement striping (24" width) 1,113      LNFT 3.65 4,062.45            
732-02-A plastic pavement striping (solid line) (4" width) 17.631  MILE 3,060.00 53,950.86            
732-03-A plastic pavement striping (broken line)(4" width) 8.056  MILE 816.00 6,573.70            
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 206.25 618.75            
740-01 construction layout lump      LUMP 25,000.00 25,000.00            
S-001 rumble strips (ground-in) 16.6    MILE 640.00 10,624.00            
S-006 roadway reinforcing mesh (complete road system) 113,112      SQYD 7.50 848,340.00            
                       
 CONTRACTOR TOTAL       4,900,310.96            