| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - PRAIRIE CONTRACTORS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
2,363   |
CUYD |
22.00 |
51,986.00 |
10.00 |
23,630.00 |
15.00 |
35,445.00 |
8.00 |
18,904.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
20   |
EACH |
300.00 |
6,000.00 |
80.00 |
1,600.00 |
110.00 |
2,200.00 |
200.00 |
4,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
125   |
CUYD |
42.00 |
5,250.00 |
100.00 |
12,500.00 |
80.00 |
10,000.00 |
100.00 |
12,500.00 |
| 502-01 |
superpave asphaltic concrete
|
28,975.3 |
TON |
69.00 |
1,999,295.70 |
78.00 |
2,260,073.40 |
71.50 |
2,071,733.95 |
85.50 |
2,477,388.15 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
508.0 |
TON |
156.00 |
79,248.00 |
160.00 |
81,280.00 |
125.00 |
63,500.00 |
140.00 |
71,120.00 |
| 509-01 |
cold planing asphaltic pavement
|
123,034   |
SQYD |
1.60 |
196,854.40 |
0.60 |
73,820.40 |
1.95 |
239,916.30 |
1.50 |
184,551.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 5,060   |
CUYD |
0.10 |
- 506.00 |
0.01 |
- 50.60 |
0.01 |
- 50.60 |
0.01 |
- 50.60 |
| 510-01-A |
pavement patching (6" minimum thickness)
|
180   |
SQYD |
67.00 |
12,060.00 |
72.00 |
12,960.00 |
40.00 |
7,200.00 |
90.00 |
16,200.00 |
| 510-01-C |
pavement patching (15" minimum thickness)
|
250   |
SQYD |
134.00 |
33,500.00 |
185.00 |
46,250.00 |
125.00 |
31,250.00 |
100.00 |
25,000.00 |
| 510-03 |
pavement joint repair
|
424.8 |
TON |
245.00 |
104,076.00 |
110.00 |
46,728.00 |
150.00 |
63,720.00 |
50.00 |
21,240.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
13,000.00 |
13,000.00 |
10,000.00 |
10,000.00 |
90,000.00 |
90,000.00 |
16,500.00 |
16,500.00 |
| 713-02-C |
temporary pavement markings (8" width)
|
2,944   |
LNFT |
0.25 |
736.00 |
0.50 |
1,472.00 |
0.25 |
736.00 |
0.25 |
736.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
24.709 |
MILE |
135.00 |
3,335.72 |
330.00 |
8,153.97 |
325.00 |
8,030.43 |
400.00 |
9,883.60 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.056 |
MILE |
325.00 |
2,618.20 |
1.00 |
8.06 |
300.00 |
2,416.80 |
1,550.00 |
12,486.80 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
17.631 |
MILE |
650.00 |
11,460.15 |
1.00 |
17.63 |
600.00 |
10,578.60 |
800.00 |
14,104.80 |
| 727-01 |
mobilization
|
lump |
LUMP |
95,000.00 |
95,000.00 |
185,000.00 |
185,000.00 |
185,000.00 |
185,000.00 |
50,000.00 |
50,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
12   |
EACH |
85.00 |
1,020.00 |
60.00 |
720.00 |
70.00 |
840.00 |
100.00 |
1,200.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,441   |
EACH |
5.00 |
7,205.00 |
5.50 |
7,925.50 |
5.00 |
7,205.00 |
5.00 |
7,205.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
502   |
LNFT |
1.20 |
602.40 |
1.00 |
502.00 |
1.10 |
552.20 |
2.00 |
1,004.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
1,113   |
LNFT |
3.35 |
3,728.55 |
3.40 |
3,784.20 |
3.30 |
3,672.90 |
4.00 |
4,452.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.631 |
MILE |
2,542.00 |
44,818.00 |
2,800.00 |
49,366.80 |
2,500.00 |
44,077.50 |
2,500.00 |
44,077.50 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.056 |
MILE |
775.00 |
6,243.40 |
760.00 |
6,122.56 |
800.00 |
6,444.80 |
800.00 |
6,444.80 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
165.00 |
495.00 |
195.00 |
585.00 |
175.00 |
525.00 |
200.00 |
600.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
6,000.00 |
6,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
| S-001 |
rumble strips (ground-in)
|
16.6 |
MILE |
675.00 |
11,205.00 |
600.00 |
9,960.00 |
750.00 |
12,450.00 |
825.00 |
13,695.00 |
| S-006 |
roadway reinforcing mesh (complete road system)
|
113,112   |
SQYD |
7.25 |
820,062.00 |
6.35 |
718,261.20 |
7.25 |
820,062.00 |
6.75 |
763,506.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,521,293.52 |
|
3,566,670.12 |
|
3,742,505.88 |
|
3,786,748.05 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - H & S CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
2,363   |
CUYD |
20.00 |
47,260.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
20   |
EACH |
140.00 |
2,800.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
125   |
CUYD |
68.00 |
8,500.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
28,975.3 |
TON |
98.00 |
2,839,579.40 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
508.0 |
TON |
135.00 |
68,580.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
123,034   |
SQYD |
1.35 |
166,095.90 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 5,060   |
CUYD |
0.01 |
- 50.60 |
|
|
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
180   |
SQYD |
82.00 |
14,760.00 |
|
|
|
|
|
|
| 510-01-C |
pavement patching (15" minimum thickness)
|
250   |
SQYD |
150.00 |
37,500.00 |
|
|
|
|
|
|
| 510-03 |
pavement joint repair
|
424.8 |
TON |
750.00 |
318,600.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
165,000.00 |
165,000.00 |
|
|
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
2,944   |
LNFT |
0.35 |
1,030.40 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
24.709 |
MILE |
375.00 |
9,265.88 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.056 |
MILE |
355.00 |
2,859.88 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
17.631 |
MILE |
510.00 |
8,991.81 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
12   |
EACH |
98.00 |
1,176.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,441   |
EACH |
6.01 |
8,660.41 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
502   |
LNFT |
1.06 |
532.12 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,113   |
LNFT |
3.65 |
4,062.45 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.631 |
MILE |
3,060.00 |
53,950.86 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.056 |
MILE |
816.00 |
6,573.70 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
206.25 |
618.75 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
16.6 |
MILE |
640.00 |
10,624.00 |
|
|
|
|
|
|
| S-006 |
roadway reinforcing mesh (complete road system)
|
113,112   |
SQYD |
7.50 |
848,340.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|