| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARBER BROS. CONTRACTING CO., L.L.C |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - COASTAL BRIDGE CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-H |
removal of guard rail
|
1,874   |
LNFT |
6.50 |
12,181.00 |
5.00 |
9,370.00 |
10.00 |
18,740.00 |
|
|
| 203-02 |
drainage excavation
|
222   |
CUYD |
20.00 |
4,440.00 |
12.00 |
2,664.00 |
10.00 |
2,220.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
3,075   |
CUYD |
20.00 |
61,500.00 |
30.00 |
92,250.00 |
25.00 |
76,875.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,800   |
LNFT |
1.50 |
2,700.00 |
2.00 |
3,600.00 |
2.00 |
3,600.00 |
|
|
| 302-02-C |
class ii base course (8" thick)
|
4,171.2 |
SQYD |
45.00 |
187,704.00 |
50.00 |
208,560.00 |
33.50 |
139,735.20 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
475   |
CUYD |
100.00 |
47,500.00 |
30.00 |
14,250.00 |
40.00 |
19,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
39,845.8 |
TON |
75.00 |
2,988,435.00 |
70.00 |
2,789,206.00 |
75.00 |
2,988,435.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,837.4 |
TON |
100.00 |
183,740.00 |
70.00 |
128,618.00 |
145.00 |
266,423.00 |
|
|
| 509-01-A |
cold planing asphaltic pavement (0.5" average depth)
|
75,962   |
SQYD |
1.50 |
113,943.00 |
2.00 |
151,924.00 |
1.25 |
94,952.50 |
|
|
| 509-01-B |
cold planing asphaltic pavement (1.75" average depth)
|
163,603   |
SQYD |
2.25 |
368,106.75 |
4.00 |
654,412.00 |
3.50 |
572,610.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 6,756   |
CUYD |
0.00 |
0.00 |
0.01 |
- 67.56 |
1.00 |
- 6,756.00 |
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
195   |
SQYD |
65.00 |
12,675.00 |
70.00 |
13,650.00 |
46.50 |
9,067.50 |
|
|
| 510-01-C |
pavement patching (18" minimum thickness)
|
1,550   |
SQYD |
120.00 |
186,000.00 |
140.00 |
217,000.00 |
110.00 |
170,500.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
32   |
LNFT |
150.00 |
4,800.00 |
120.00 |
3,840.00 |
100.00 |
3,200.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
16   |
LNFT |
300.00 |
4,800.00 |
140.00 |
2,240.00 |
125.00 |
2,000.00 |
|
|
| 701-05-M |
side drain pipe (36")
|
208   |
LNFT |
160.00 |
33,280.00 |
200.00 |
41,600.00 |
150.00 |
31,200.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
6   |
LNFT |
800.00 |
4,800.00 |
180.00 |
1,080.00 |
500.00 |
3,000.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
600.00 |
4,800.00 |
180.00 |
1,440.00 |
800.00 |
6,400.00 |
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
1,500.00 |
4,500.00 |
1,500.00 |
4,500.00 |
3,500.00 |
10,500.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
3,000.00 |
6,000.00 |
3,500.00 |
7,000.00 |
6,000.00 |
12,000.00 |
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
4,000.00 |
4,000.00 |
3,700.00 |
3,700.00 |
3,500.00 |
3,500.00 |
|
|
| 702-07-A |
cross drain safety end (type 1)
|
7   |
EACH |
4,500.00 |
31,500.00 |
2,700.00 |
18,900.00 |
4,500.00 |
31,500.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
3   |
EACH |
5,000.00 |
15,000.00 |
2,700.00 |
8,100.00 |
5,500.00 |
16,500.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
237.6 |
LNFT |
55.00 |
13,068.00 |
50.00 |
11,880.00 |
50.00 |
11,880.00 |
|
|
| 704-03 |
blocked out guard rail
|
2,226.0 |
LNFT |
20.00 |
44,520.00 |
17.00 |
37,842.00 |
20.00 |
44,520.00 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
37.8 |
LNFT |
90.00 |
3,402.00 |
80.00 |
3,024.00 |
80.00 |
3,024.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
50.00 |
5,000.00 |
50.00 |
5,000.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
8   |
EACH |
2,600.00 |
20,800.00 |
2,300.00 |
18,400.00 |
2,300.00 |
18,400.00 |
|
|
| 704-11-C |
guard rail end treatment (bi-directional)
|
2   |
EACH |
4,500.00 |
9,000.00 |
3,800.00 |
7,600.00 |
3,800.00 |
7,600.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
320,000.00 |
320,000.00 |
100,000.00 |
100,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
7,000   |
LNFT |
0.40 |
2,800.00 |
0.25 |
1,750.00 |
0.30 |
2,100.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
1,200   |
LNFT |
1.20 |
1,440.00 |
0.75 |
900.00 |
1.00 |
1,200.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.709 |
MILE |
400.00 |
5,883.60 |
600.00 |
8,825.40 |
425.00 |
6,251.33 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
34.887 |
MILE |
350.00 |
12,210.45 |
300.00 |
10,466.10 |
300.00 |
10,466.10 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
61.137 |
MILE |
350.00 |
21,397.95 |
500.00 |
30,568.50 |
525.00 |
32,096.93 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
80   |
EACH |
60.00 |
4,800.00 |
25.00 |
2,000.00 |
50.00 |
4,000.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
40   |
EACH |
85.00 |
3,400.00 |
40.00 |
1,600.00 |
75.00 |
3,000.00 |
|
|
| 726-01 |
bedding material
|
123.4 |
CUYD |
80.00 |
9,872.00 |
0.00 |
0.00 |
70.00 |
8,638.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
325,000.00 |
325,000.00 |
475,000.00 |
475,000.00 |
600,000.00 |
600,000.00 |
|
|
| 728-01 |
jacked or bored pipe (size,type,class, or thickness)
|
58.0 |
LNFT |
700.00 |
40,600.00 |
800.00 |
46,400.00 |
500.00 |
29,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
68   |
EACH |
70.00 |
4,760.00 |
55.00 |
3,740.00 |
65.00 |
4,420.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
80.00 |
1,280.00 |
75.00 |
1,200.00 |
70.00 |
1,120.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,818   |
EACH |
6.00 |
10,908.00 |
6.00 |
10,908.00 |
5.25 |
9,544.50 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
7,000   |
LNFT |
1.05 |
7,350.00 |
1.20 |
8,400.00 |
1.00 |
7,000.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,200   |
LNFT |
3.50 |
4,200.00 |
3.70 |
4,440.00 |
3.00 |
3,600.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
30.185 |
MILE |
3,000.00 |
90,555.00 |
3,000.00 |
90,555.00 |
2,700.00 |
81,499.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
11.629 |
MILE |
800.00 |
9,303.20 |
900.00 |
10,466.10 |
700.00 |
8,140.30 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
80   |
EACH |
200.00 |
16,000.00 |
225.00 |
18,000.00 |
175.00 |
14,000.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
40   |
EACH |
275.00 |
11,000.00 |
275.00 |
11,000.00 |
250.00 |
10,000.00 |
|
|
| 735-01 |
mailboxes
|
67   |
EACH |
2.00 |
134.00 |
5.00 |
335.00 |
1.00 |
67.00 |
|
|
| 735-02 |
mailbox supports (single)
|
57   |
EACH |
120.00 |
6,840.00 |
135.00 |
7,695.00 |
125.00 |
7,125.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
160.00 |
160.00 |
165.00 |
165.00 |
200.00 |
200.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
275.00 |
550.00 |
300.00 |
600.00 |
400.00 |
800.00 |
|
|
| 736-09 |
loop detector
|
15,666   |
LNFT |
14.00 |
219,324.00 |
13.00 |
203,658.00 |
12.00 |
187,992.00 |
|
|
| 736-10 |
underground junction box
|
21   |
EACH |
300.00 |
6,300.00 |
300.00 |
6,300.00 |
250.00 |
5,250.00 |
|
|
| 739-01 |
hydro-seeding
|
11.90 |
ACRE |
1,200.00 |
14,280.00 |
1,200.00 |
14,280.00 |
1,000.00 |
11,900.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
100,800.00 |
100,800.00 |
50,000.00 |
50,000.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
19.7 |
MILE |
800.00 |
15,760.00 |
800.00 |
15,760.00 |
700.00 |
13,790.00 |
|
|
| S-002 |
dynamic message sign unit
|
4   |
EACH |
25,000.00 |
100,000.00 |
10,000.00 |
40,000.00 |
16,000.00 |
64,000.00 |
|
|
| S-003 |
saw cutting composite pavement (18" deep)
|
2,374   |
LNFT |
10.00 |
23,740.00 |
15.00 |
35,610.00 |
12.00 |
28,488.00 |
|
|
| S-004 |
cleaning existing ditches
|
2,020   |
LNFT |
5.00 |
10,100.00 |
12.00 |
24,240.00 |
10.00 |
20,200.00 |
|
|
| S-005 |
saw cutting asphaltic concrete (6" deep)
|
342   |
LNFT |
10.00 |
3,420.00 |
9.00 |
3,078.00 |
8.00 |
2,736.00 |
|
|
| S-006 |
roadway reinforcing mesh (complete system)
|
108,420   |
SQYD |
8.00 |
867,360.00 |
7.00 |
758,940.00 |
8.00 |
867,360.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
6,579,922.95 |
|
6,739,262.54 |
|
6,786,611.36 |
|
|
|