| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
12,000.00 |
12,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
600.0 |
LNFT |
11.25 |
6,750.00 |
25.00 |
15,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
250   |
CUYD |
50.00 |
12,500.00 |
50.00 |
12,500.00 |
|
|
|
|
| 502-01 |
superpave asphalt concrete
|
5,821.9 |
TON |
80.00 |
465,752.00 |
85.00 |
494,861.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
720.0 |
TON |
100.00 |
72,000.00 |
150.00 |
108,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
50,436   |
SQYD |
4.00 |
201,744.00 |
3.50 |
176,526.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,101   |
CUYD |
1.00 |
- 2,101.00 |
5.00 |
- 10,505.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
750   |
SQYD |
60.00 |
45,000.00 |
40.00 |
30,000.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
2,500   |
SQYD |
90.00 |
225,000.00 |
100.00 |
250,000.00 |
|
|
|
|
| 510-03 |
pavement joint repair
|
100.0 |
TON |
100.00 |
10,000.00 |
200.00 |
20,000.00 |
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
10,686   |
LNFT |
2.00 |
21,372.00 |
3.00 |
32,058.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
108   |
EACH |
100.00 |
10,800.00 |
100.00 |
10,800.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
10   |
EACH |
1,000.00 |
10,000.00 |
1,000.00 |
10,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
200.0 |
SQYD |
75.00 |
15,000.00 |
60.00 |
12,000.00 |
|
|
|
|
| 706-04 |
handicapped curb ramps
|
20   |
EACH |
1,375.00 |
27,500.00 |
1,000.00 |
20,000.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
600.0 |
LNFT |
44.50 |
26,700.00 |
65.00 |
39,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
46,000.00 |
46,000.00 |
220,000.00 |
220,000.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
3,000   |
LNFT |
0.10 |
300.00 |
0.30 |
900.00 |
|
|
|
|
| 713-02-D |
temporary pavement markings (12" width)
|
1,800   |
LNFT |
0.20 |
360.00 |
0.80 |
1,440.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
1,000   |
LNFT |
0.30 |
300.00 |
1.00 |
1,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.640 |
MILE |
200.00 |
1,328.00 |
500.00 |
3,320.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.640 |
MILE |
20.00 |
132.80 |
325.00 |
2,158.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
6.640 |
MILE |
30.00 |
199.20 |
525.00 |
3,486.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
140,000.00 |
140,000.00 |
160,000.00 |
160,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
500   |
EACH |
6.00 |
3,000.00 |
6.00 |
3,000.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,500   |
LNFT |
1.00 |
1,500.00 |
1.00 |
1,500.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
900   |
LNFT |
2.00 |
1,800.00 |
2.00 |
1,800.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
500   |
LNFT |
3.50 |
1,750.00 |
3.00 |
1,500.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.320 |
MILE |
3,000.00 |
9,960.00 |
2,500.00 |
8,300.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.320 |
MILE |
800.00 |
2,656.00 |
700.00 |
2,324.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
35,000.00 |
35,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
3   |
EACH |
430.00 |
1,290.00 |
1,000.00 |
3,000.00 |
|
|
|
|
| S-001 |
dynamic message sign unit
|
2   |
EACH |
5,000.00 |
10,000.00 |
8,000.00 |
16,000.00 |
|
|
|
|
| S-002 |
tree trimming
|
20   |
EACH |
600.00 |
12,000.00 |
700.00 |
14,000.00 |
|
|
|
|
| S-003 |
tree pruning
|
20   |
EACH |
100.00 |
2,000.00 |
150.00 |
3,000.00 |
|
|
|
|
| S-004 |
cleaning catch basins
|
50   |
EACH |
100.00 |
5,000.00 |
200.00 |
10,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,434,593.00 |
|
1,687,968.50 |
|
|
|
|
|