| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
- 3 - COASTAL BRIDGE CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
380   |
LNFT |
8.00 |
3,040.00 |
1.00 |
380.00 |
10.00 |
3,800.00 |
|
|
| 202-02-I |
removal of railroad grade crossing
|
2   |
EACH |
6,000.00 |
12,000.00 |
25,000.00 |
50,000.00 |
10,000.00 |
20,000.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
2,041   |
CUYD |
20.00 |
40,820.00 |
10.00 |
20,410.00 |
25.00 |
51,025.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
100.00 |
1,200.00 |
10.00 |
120.00 |
110.00 |
1,320.00 |
|
|
| 204-06 |
temporary silt fencing
|
4,740   |
LNFT |
1.40 |
6,636.00 |
0.50 |
2,370.00 |
1.50 |
7,110.00 |
|
|
| 302-02-F |
class ii base course (12" thick)
|
266.7 |
SQYD |
50.00 |
13,335.00 |
100.00 |
26,670.00 |
120.00 |
32,004.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,029   |
CUYD |
0.01 |
20.29 |
55.00 |
111,595.00 |
80.00 |
162,320.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
18,346.2 |
TON |
66.00 |
1,210,849.20 |
69.00 |
1,265,887.80 |
76.25 |
1,398,897.75 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
128.1 |
TON |
200.00 |
25,620.00 |
69.00 |
8,838.90 |
150.00 |
19,215.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
85,770   |
SQYD |
2.80 |
240,156.00 |
1.00 |
85,770.00 |
2.00 |
171,540.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,574   |
CUYD |
0.00 |
0.00 |
10.00 |
- 35,740.00 |
0.01 |
- 35.74 |
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
50   |
SQYD |
70.00 |
3,500.00 |
10.00 |
500.00 |
50.00 |
2,500.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,100   |
SQYD |
70.00 |
77,000.00 |
50.00 |
55,000.00 |
90.00 |
99,000.00 |
|
|
| 510-01-C |
pavement patching (24" minimum thickness)
|
400   |
SQYD |
130.00 |
52,000.00 |
70.00 |
28,000.00 |
125.00 |
50,000.00 |
|
|
| 510-02 |
pavement widening
|
104.2 |
SQYD |
130.00 |
13,546.00 |
50.00 |
5,210.00 |
40.00 |
4,168.00 |
|
|
| 704-03 |
blocked out guard rail
|
156.3 |
LNFT |
20.00 |
3,126.00 |
19.00 |
2,969.70 |
20.00 |
3,126.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
40.00 |
2,000.00 |
50.00 |
2,500.00 |
53.00 |
2,650.00 |
|
|
| 704-10 |
guard rail anchor block
|
2   |
EACH |
2,000.00 |
4,000.00 |
1,200.00 |
2,400.00 |
1,200.00 |
2,400.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,800.00 |
5,600.00 |
2,450.00 |
4,900.00 |
2,450.00 |
4,900.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
138,000.00 |
138,000.00 |
20,000.00 |
20,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
1,641   |
LNFT |
0.30 |
492.30 |
0.01 |
16.41 |
0.30 |
492.30 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
648   |
LNFT |
1.00 |
648.00 |
0.10 |
64.80 |
0.95 |
615.60 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.467 |
MILE |
170.00 |
2,289.39 |
150.00 |
2,020.05 |
440.00 |
5,925.48 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.856 |
MILE |
280.00 |
1,919.68 |
0.10 |
0.69 |
300.00 |
2,056.80 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
29.733 |
MILE |
420.00 |
12,487.86 |
0.10 |
2.97 |
450.00 |
13,379.85 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
33   |
EACH |
50.00 |
1,650.00 |
0.10 |
3.30 |
55.00 |
1,815.00 |
|
|
| 713-05-B |
temporary pavement legends and symbols (double arrow)
|
3   |
EACH |
55.00 |
165.00 |
0.10 |
0.30 |
60.00 |
180.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
12   |
EACH |
60.00 |
720.00 |
0.10 |
1.20 |
70.00 |
840.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
170,000.00 |
170,000.00 |
220,000.00 |
220,000.00 |
175,000.00 |
175,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
75.00 |
750.00 |
45.00 |
450.00 |
75.00 |
750.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
75.00 |
150.00 |
75.00 |
150.00 |
100.00 |
200.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
724   |
EACH |
5.10 |
3,692.40 |
5.10 |
3,692.40 |
5.50 |
3,982.00 |
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
96   |
LNFT |
0.70 |
67.20 |
0.70 |
67.20 |
0.80 |
76.80 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
547   |
LNFT |
0.90 |
492.30 |
0.90 |
492.30 |
1.00 |
547.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
216   |
LNFT |
4.00 |
864.00 |
4.00 |
864.00 |
4.25 |
918.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.904 |
MILE |
2,700.00 |
34,840.80 |
2,700.00 |
34,840.80 |
2,800.00 |
36,131.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.285 |
MILE |
800.00 |
1,828.00 |
800.00 |
1,828.00 |
850.00 |
1,942.25 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
11   |
EACH |
200.00 |
2,200.00 |
200.00 |
2,200.00 |
220.00 |
2,420.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
250.00 |
250.00 |
230.00 |
230.00 |
250.00 |
250.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
250.00 |
1,000.00 |
250.00 |
1,000.00 |
275.00 |
1,100.00 |
|
|
| 735-01 |
mailboxes
|
3   |
EACH |
10.00 |
30.00 |
1.00 |
3.00 |
1.00 |
3.00 |
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
175.00 |
175.00 |
150.00 |
150.00 |
200.00 |
200.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
250.00 |
250.00 |
250.00 |
250.00 |
400.00 |
400.00 |
|
|
| 739-01 |
hydro-seeding
|
1.92 |
ACRE |
1,100.00 |
2,112.00 |
1,000.00 |
1,920.00 |
1,200.00 |
2,304.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-001 |
saw cutting asphaltic concrete patches (6" deep)
|
500   |
LNFT |
8.00 |
4,000.00 |
1.00 |
500.00 |
8.00 |
4,000.00 |
|
|
| S-002 |
saw cutting asphaltic concrete patches (12" deep)
|
6,500   |
LNFT |
10.00 |
65,000.00 |
7.00 |
45,500.00 |
5.00 |
32,500.00 |
|
|
| S-003 |
rumble strips (ground-in)
|
5.8 |
MILE |
800.00 |
4,640.00 |
700.00 |
4,060.00 |
750.00 |
4,350.00 |
|
|
| S-004 |
roadway reinforcing mesh (complete road system)
|
20,821   |
SQYD |
6.50 |
135,336.50 |
6.00 |
124,926.00 |
8.00 |
166,568.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,175,498.92 |
|
2,241,014.82 |
|
2,529,887.29 |
|
|
|