| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - H & S CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
113   |
LNFT |
6.00 |
678.00 |
9.00 |
1,017.00 |
|
|
|
|
| 202-02-I |
removal of railroad crossing
|
1   |
EACH |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
10.00 |
5,000.00 |
20.00 |
10,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
4   |
EACH |
6.00 |
24.00 |
50.00 |
200.00 |
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8.5" thick)
|
7,013   |
SQYD |
21.00 |
147,273.00 |
9.00 |
63,117.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
471   |
CUYD |
50.00 |
23,550.00 |
65.00 |
30,615.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
8,566.3 |
TON |
75.00 |
642,472.50 |
90.00 |
770,967.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
250.0 |
TON |
75.00 |
18,750.00 |
120.00 |
30,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
57,494   |
SQYD |
2.00 |
114,988.00 |
2.95 |
169,607.30 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,438   |
CUYD |
5.00 |
- 12,190.00 |
0.01 |
- 24.38 |
|
|
|
|
| 510-01-C |
pavement patching (4" minimum thickness)
|
1,000   |
SQYD |
20.00 |
20,000.00 |
30.00 |
30,000.00 |
|
|
|
|
| 510-01-D |
pavement patching (9" minimum thickness)
|
275   |
SQYD |
45.00 |
12,375.00 |
100.00 |
27,500.00 |
|
|
|
|
| 510-01-E |
pavement patching (18" minimum thickness)
|
450   |
SQYD |
55.00 |
24,750.00 |
200.00 |
90,000.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
16   |
LNFT |
100.00 |
1,600.00 |
250.00 |
4,000.00 |
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
1,800.00 |
3,600.00 |
1,500.00 |
3,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
3   |
EACH |
2,500.00 |
7,500.00 |
3,165.00 |
9,495.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.266 |
MILE |
300.00 |
1,579.80 |
383.00 |
2,016.88 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.127 |
MILE |
1.00 |
6.13 |
352.00 |
2,156.70 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
28.548 |
MILE |
1.00 |
28.55 |
508.00 |
14,502.38 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
1,000.00 |
1,000.00 |
7,500.00 |
7,500.00 |
|
|
|
|
| 726-01 |
bedding material
|
10.0 |
CUYD |
50.00 |
500.00 |
25.00 |
250.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
130,000.00 |
130,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
11   |
EACH |
55.00 |
605.00 |
100.00 |
1,100.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
5   |
EACH |
65.00 |
325.00 |
135.00 |
675.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,260   |
EACH |
5.50 |
12,430.00 |
6.00 |
13,560.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
804   |
LNFT |
1.00 |
804.00 |
1.00 |
804.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
681   |
LNFT |
3.25 |
2,213.25 |
3.75 |
2,553.75 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.274 |
MILE |
2,700.00 |
38,539.80 |
3,045.00 |
43,464.33 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.063 |
MILE |
700.00 |
2,144.10 |
812.00 |
2,487.16 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
12   |
EACH |
180.00 |
2,160.00 |
209.00 |
2,508.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
11   |
EACH |
230.00 |
2,530.00 |
299.00 |
3,289.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,370,236.13 |
|
1,491,361.12 |
|
|
|
|
|