| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - CHAMBERS CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-A-01 |
removal of bridges (3 @ 19', concrete slab spans w/
timber piles) |
1   |
EACH |
18,700.00 |
18,700.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
50   |
CUYD |
44.00 |
2,200.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
10   |
EACH |
95.00 |
950.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
75   |
LNFT |
8.00 |
600.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,400.00 |
5,400.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
18,750.00 |
18,750.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
1,300.00 |
1,300.00 |
|
|
|
|
|
|
| 804-01-B-01 |
precast concrete piles (14")(50' long)
|
600   |
LNFT |
62.20 |
37,320.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
2,200.00 |
2,200.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (24' clr. rdwy.,
90 deg. xing) (pre-cast) |
3   |
SPAN |
28,200.00 |
84,600.00 |
|
|
|
|
|
|
| S-101 |
concrete approach slabs (24' clr. rdwy., 90 deg. xing,
w/tapered barrier rails)(w/out asphalt) |
2   |
EACH |
11,400.00 |
22,800.00 |
|
|
|
|
|
|
| S-102 |
installation of bulkhead
|
lump |
LUMP |
10,100.00 |
10,100.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
204,920.00 |
|
|
|
|
|
|
|