| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C W & W CONTRACTORS, INC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
15,000.00 |
15,000.00 |
38,000.00 |
38,000.00 |
30,000.00 |
30,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 9+997.5; 7.438m x 15.265m
timber/steel) |
1   |
ea |
5,000.00 |
5,000.00 |
6,500.00 |
6,500.00 |
15,000.00 |
15,000.00 |
|
|
| 202-02-A-02 |
removal of bridge (sta. 9+999.5; 6.16m x 15.37m
timber/steel) |
1   |
ea |
4,500.00 |
4,500.00 |
6,500.00 |
6,500.00 |
18,000.00 |
18,000.00 |
|
|
| 202-02-A-03 |
removal of bridge (sta. 10+000; 6.344m x 8.369m
timber/steel) |
1   |
ea |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
75,000.00 |
75,000.00 |
68,000.00 |
68,000.00 |
93,000.00 |
93,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
54   |
ea |
5.00 |
270.00 |
10.00 |
540.00 |
30.00 |
1,620.00 |
|
|
| 204-03 |
temporary slope drains
|
70   |
ln m |
10.00 |
700.00 |
10.00 |
700.00 |
75.00 |
5,250.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
ea |
125.00 |
1,500.00 |
250.00 |
3,000.00 |
300.00 |
3,600.00 |
|
|
| 204-06 |
temporary silt fencing
|
525   |
ln m |
15.00 |
7,875.00 |
10.00 |
5,250.00 |
13.00 |
6,825.00 |
|
|
| 302-01 |
class ii base course
|
329.0 |
cu m |
100.00 |
32,900.00 |
100.00 |
32,900.00 |
160.00 |
52,640.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
4   |
cu m |
250.00 |
1,000.00 |
100.00 |
400.00 |
660.00 |
2,640.00 |
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
117.2 |
cu m |
110.00 |
12,892.00 |
100.00 |
11,720.00 |
125.00 |
14,650.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
124.8 |
Mg |
200.00 |
24,960.00 |
295.00 |
36,816.00 |
175.00 |
21,840.00 |
|
|
| 701-05-I |
side drain pipe (600 mm)
|
9.0 |
ln m |
140.00 |
1,260.00 |
250.00 |
2,250.00 |
200.00 |
1,800.00 |
|
|
| 701-05-I-01 |
side drain pipe (600 mm)(erosion)
|
69.0 |
ln m |
110.00 |
7,590.00 |
250.00 |
17,250.00 |
180.00 |
12,420.00 |
|
|
| 701-05-K |
side drain pipe (750 mm)
|
32.0 |
ln m |
180.00 |
5,760.00 |
325.00 |
10,400.00 |
300.00 |
9,600.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(450 mm)
|
11.5 |
ln m |
165.00 |
1,897.50 |
320.00 |
3,680.00 |
180.00 |
2,070.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
53.34 |
ln m |
205.00 |
10,934.70 |
275.00 |
14,668.50 |
170.00 |
9,067.80 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
53.34 |
ln m |
100.00 |
5,334.00 |
150.00 |
8,001.00 |
85.00 |
4,533.90 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
ea |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
2,150.00 |
2,150.00 |
|
|
| 705-01 |
barbed wire fence
|
60   |
ln m |
27.50 |
1,650.00 |
20.00 |
1,200.00 |
23.00 |
1,380.00 |
|
|
| 705-05 |
double swinging driveway gates
|
1   |
dbgt |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
800.00 |
800.00 |
|
|
| 705-06-A |
chain link fence (1200 mm height)
|
42   |
ln m |
60.00 |
2,520.00 |
60.00 |
2,520.00 |
50.00 |
2,100.00 |
|
|
| 707-04 |
asphaltic curb
|
12.0 |
ln m |
50.00 |
600.00 |
195.00 |
2,340.00 |
50.00 |
600.00 |
|
|
| 711-01-D |
riprap (25 kg,460mm thick)
|
728   |
sq m |
95.00 |
69,160.00 |
80.00 |
58,240.00 |
70.00 |
50,960.00 |
|
|
| 711-04 |
geotextile fabric
|
728   |
sq m |
3.50 |
2,548.00 |
5.00 |
3,640.00 |
3.00 |
2,184.00 |
|
|
| 712-01 |
concrete cast-in-place revetment (100 mm thick)
|
84.0 |
sq m |
90.00 |
7,560.00 |
250.00 |
21,000.00 |
70.00 |
5,880.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.6 |
hctr |
10,000.00 |
6,000.00 |
10,000.00 |
6,000.00 |
3,600.00 |
2,160.00 |
|
|
| 717-01 |
seeding
|
27   |
kg |
65.00 |
1,755.00 |
50.00 |
1,350.00 |
20.00 |
540.00 |
|
|
| 718-01 |
fertilizer
|
680   |
kg |
3.50 |
2,380.00 |
5.00 |
3,400.00 |
5.00 |
3,400.00 |
|
|
| 725-04 |
low profile runaround
|
1   |
ea |
41,000.00 |
41,000.00 |
35,000.00 |
35,000.00 |
22,000.00 |
22,000.00 |
|
|
| 726-01 |
bedding material
|
47.0 |
cu m |
120.00 |
5,640.00 |
200.00 |
9,400.00 |
175.00 |
8,225.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
75,000.00 |
75,000.00 |
112,000.00 |
112,000.00 |
100,000.00 |
100,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
85.00 |
340.00 |
100.00 |
400.00 |
70.00 |
280.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
15   |
ea |
100.00 |
1,500.00 |
140.00 |
2,100.00 |
80.00 |
1,200.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
20,000.00 |
20,000.00 |
12,000.00 |
12,000.00 |
50,000.00 |
50,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
lump |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
180.0 |
ln m |
330.00 |
59,400.00 |
198.00 |
35,640.00 |
280.00 |
50,400.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
306.0 |
ln m |
300.00 |
91,800.00 |
225.00 |
68,850.00 |
300.00 |
91,800.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
100.00 |
200.00 |
1.00 |
2.00 |
1,000.00 |
2,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
17.65 |
cu m |
1,200.00 |
21,180.00 |
2,200.00 |
38,830.00 |
2,000.00 |
35,300.00 |
|
|
| 805-10-A |
bridge superstructure & substructure (7.3 m rdwy;
90 degree xing)(c.i.p. bents) |
5   |
span |
23,000.00 |
115,000.00 |
25,000.00 |
125,000.00 |
23,000.00 |
115,000.00 |
|
|
| 805-10-B |
bridge superstructure & substructure (7.3 m rdwy;
90 degree xing)(c.i.p.) |
4   |
span |
25,000.00 |
100,000.00 |
25,000.00 |
100,000.00 |
27,000.00 |
108,000.00 |
|
|
| 805-12-I-01 |
reinforced concrete box culverts (1500 mm x 1500 mm)
(precast only) (astm c-1433) |
54.00 |
ln m |
1,400.00 |
75,600.00 |
2,200.00 |
118,800.00 |
2,000.00 |
108,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
905   |
kg |
6.00 |
5,430.00 |
5.00 |
4,525.00 |
3.00 |
2,715.00 |
|
|
| S-001 |
relocate existing yard pipe and tie into prcb
|
lump |
lump |
1,500.00 |
1,500.00 |
3,500.00 |
3,500.00 |
1,000.00 |
1,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
979,636.20 |
|
1,097,812.50 |
|
1,117,630.70 |
|
|
|