| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HARD ROCK CONSTRUCTION CO. |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - RICHARD PRICE CONTRACTING CO, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
75,000.00 |
75,000.00 |
50,000.00 |
50,000.00 |
200,000.00 |
200,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
75,000.00 |
75,000.00 |
30,000.00 |
30,000.00 |
300,000.00 |
300,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
418   |
SQYD |
25.00 |
10,450.00 |
100.00 |
41,800.00 |
50.00 |
20,900.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
281   |
SQYD |
25.00 |
7,025.00 |
100.00 |
28,100.00 |
50.00 |
14,050.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
497.9 |
LNFT |
25.00 |
12,447.50 |
12.00 |
5,974.80 |
40.00 |
19,916.00 |
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
462.2 |
LNFT |
25.00 |
11,555.00 |
16.00 |
7,395.20 |
50.00 |
23,110.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,824.9 |
SQYD |
25.00 |
45,622.50 |
8.00 |
14,599.20 |
30.00 |
54,747.00 |
|
|
| 202-02-I |
removal of existing signal equipment and related items
|
lump |
LUMP |
8,000.00 |
8,000.00 |
12,000.00 |
12,000.00 |
13,000.00 |
13,000.00 |
|
|
| 202-03 |
relocation of pole mounted signs
|
2   |
EACH |
550.00 |
1,100.00 |
5,000.00 |
10,000.00 |
1,200.00 |
2,400.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
210,000.00 |
210,000.00 |
100,000.00 |
100,000.00 |
200,000.00 |
200,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
56   |
EACH |
12.00 |
672.00 |
20.00 |
1,120.00 |
30.00 |
1,680.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
7   |
EACH |
175.00 |
1,225.00 |
500.00 |
3,500.00 |
300.00 |
2,100.00 |
|
|
| 204-06 |
temporary silt fencing
|
2,888   |
LNFT |
2.00 |
5,776.00 |
1.50 |
4,332.00 |
4.50 |
12,996.00 |
|
|
| 302-02-C |
class ii base course (10" thick)
|
1,423.7 |
SQYD |
30.00 |
42,711.00 |
36.00 |
51,253.20 |
50.00 |
71,185.00 |
|
|
| 302-02-E |
class ii base course (8" thick)
|
6,416.7 |
SQYD |
28.00 |
179,667.60 |
25.00 |
160,417.50 |
40.00 |
256,668.00 |
|
|
| 304-01 |
lime
|
45.48 |
TON |
100.00 |
4,548.00 |
150.00 |
6,822.00 |
210.00 |
9,550.80 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
3,209   |
SQYD |
3.00 |
9,627.00 |
4.00 |
12,836.00 |
25.00 |
80,225.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
CUYD |
0.00 |
0.00 |
50.00 |
50,000.00 |
100.00 |
100,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
583.4 |
TON |
140.00 |
81,676.00 |
100.00 |
58,340.00 |
200.00 |
116,680.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,618   |
SQYD |
17.00 |
27,506.00 |
8.00 |
12,944.00 |
25.00 |
40,450.00 |
|
|
| 601-01-I-01 |
high early strength portland cement concrete pavement
(9" thick) |
4,156.5 |
SQYD |
100.00 |
415,650.00 |
120.00 |
498,780.00 |
500.00 |
2,078,250.00 |
|
|
| 601-03-I-01 |
high early strength portland cement concrete shoulder
(9" thick) |
1,962.2 |
SQYD |
100.00 |
196,220.00 |
120.00 |
235,464.00 |
500.00 |
981,100.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
14   |
LNFT |
120.00 |
1,680.00 |
100.00 |
1,400.00 |
67.00 |
938.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
129   |
LNFT |
63.00 |
8,127.00 |
100.00 |
12,900.00 |
75.00 |
9,675.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
118   |
LNFT |
77.00 |
9,086.00 |
100.00 |
11,800.00 |
105.00 |
12,390.00 |
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
628   |
LNFT |
85.00 |
53,380.00 |
110.00 |
69,080.00 |
144.00 |
90,432.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
4   |
LNFT |
720.00 |
2,880.00 |
250.00 |
1,000.00 |
270.00 |
1,080.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
8   |
LNFT |
400.00 |
3,200.00 |
250.00 |
2,000.00 |
500.00 |
4,000.00 |
|
|
| 701-14 |
cleaning existing pipes
|
179   |
LNFT |
10.00 |
1,790.00 |
40.00 |
7,160.00 |
40.00 |
7,160.00 |
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
3,000.00 |
3,000.00 |
1,200.00 |
1,200.00 |
2,100.00 |
2,100.00 |
|
|
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
5,320.00 |
5,320.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
7   |
EACH |
4,000.00 |
28,000.00 |
3,000.00 |
21,000.00 |
5,040.00 |
35,280.00 |
|
|
| 705-06-B-01 |
chain link fence (5-foot height)(control of access)
|
1,257   |
LNFT |
16.00 |
20,112.00 |
20.00 |
25,140.00 |
19.00 |
23,883.00 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
260.8 |
SQYD |
75.00 |
19,560.00 |
75.00 |
19,560.00 |
75.00 |
19,560.00 |
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
92.0 |
SQYD |
100.00 |
9,200.00 |
100.00 |
9,200.00 |
145.00 |
13,340.00 |
|
|
| 707-01 |
concrete curb
|
513.9 |
LNFT |
20.00 |
10,278.00 |
35.00 |
17,986.50 |
30.00 |
15,417.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
100,000.00 |
100,000.00 |
84,000.00 |
84,000.00 |
|
|
| 713-03-C-01 |
temporary pavement markings (8" width)(type i
removable) |
0.570 |
MILE |
30,000.00 |
17,100.00 |
35,000.00 |
19,950.00 |
46,760.00 |
26,653.20 |
|
|
| 713-03-E-01 |
temporary pavement markings (24" width)(type i
removable) |
0.060 |
MILE |
87,000.00 |
5,220.00 |
100,000.00 |
6,000.00 |
136,000.00 |
8,160.00 |
|
|
| 713-04-B-01 |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) |
0.610 |
MILE |
4,000.00 |
2,440.00 |
4,200.00 |
2,562.00 |
5,675.00 |
3,461.75 |
|
|
| 713-04-C-01 |
temporary pavement markings (broken line) (8" width)
(4' length) (type i removable) |
0.274 |
MILE |
2,000.00 |
548.00 |
3,000.00 |
822.00 |
7,850.00 |
2,150.90 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
2.886 |
MILE |
14,000.00 |
40,404.00 |
18,000.00 |
51,948.00 |
22,750.00 |
65,656.50 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
25   |
EACH |
50.00 |
1,250.00 |
60.00 |
1,500.00 |
100.00 |
2,500.00 |
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
5   |
EACH |
55.00 |
275.00 |
65.00 |
325.00 |
125.00 |
625.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
18   |
EACH |
75.00 |
1,350.00 |
85.00 |
1,530.00 |
125.00 |
2,250.00 |
|
|
| 717-01 |
seeding
|
81   |
LB |
15.00 |
1,215.00 |
20.00 |
1,620.00 |
16.00 |
1,296.00 |
|
|
| 718-01 |
fertilizer
|
1,360   |
LB |
1.00 |
1,360.00 |
1.00 |
1,360.00 |
1.50 |
2,040.00 |
|
|
| 719-04 |
landscaping
|
lump |
LUMP |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
1,680.00 |
1,680.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
1,141   |
SQYD |
2.00 |
2,282.00 |
3.00 |
3,423.00 |
2.50 |
2,852.50 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
23,000.00 |
23,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
| 724-01 |
pavement patching
|
3   |
SQYD |
500.00 |
1,500.00 |
1,000.00 |
3,000.00 |
500.00 |
1,500.00 |
|
|
| 726-01 |
bedding material
|
94.5 |
CUYD |
50.00 |
4,725.00 |
75.00 |
7,087.50 |
100.00 |
9,450.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
300,000.00 |
300,000.00 |
500,000.00 |
500,000.00 |
|
|
| 729-01 |
sign (type a)
|
370.5 |
SQFT |
22.00 |
8,151.00 |
30.00 |
11,115.00 |
41.00 |
15,190.50 |
|
|
| 729-06 |
sign (overhead mounted)
|
421.0 |
SQFT |
25.00 |
10,525.00 |
30.00 |
12,630.00 |
49.00 |
20,629.00 |
|
|
| 729-08-A |
mounting (2 1/2" post)
|
3   |
EACH |
800.00 |
2,400.00 |
1,000.00 |
3,000.00 |
1,050.00 |
3,150.00 |
|
|
| 729-09 |
mounting (overhead truss)(ground mounted)(108'-0" span)
|
1   |
EACH |
70,000.00 |
70,000.00 |
80,000.00 |
80,000.00 |
140,000.00 |
140,000.00 |
|
|
| 729-20 |
footings for overhead mountings (type a)
|
2   |
EACH |
19,000.00 |
38,000.00 |
25,000.00 |
50,000.00 |
34,000.00 |
68,000.00 |
|
|
| 729-21-A |
u-channel post(12')
|
3   |
EACH |
85.00 |
255.00 |
100.00 |
300.00 |
150.00 |
450.00 |
|
|
| 729-21-B |
u-channel post(5')
|
2   |
EACH |
55.00 |
110.00 |
75.00 |
150.00 |
125.00 |
250.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
631   |
EACH |
5.00 |
3,155.00 |
6.00 |
3,786.00 |
8.00 |
5,048.00 |
|
|
| 732-01-A-04 |
plastic pavement striping (4" width)(dashed line)
|
1,854   |
LNFT |
1.00 |
1,854.00 |
0.50 |
927.00 |
1.00 |
1,854.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
2,551   |
LNFT |
1.00 |
2,551.00 |
1.20 |
3,061.20 |
1.40 |
3,571.40 |
|
|
| 732-01-C-04 |
plastic pavement striping (8" width)(dashed line)
|
1,015   |
LNFT |
1.00 |
1,015.00 |
1.20 |
1,218.00 |
1.30 |
1,319.50 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
719   |
LNFT |
3.00 |
2,157.00 |
4.00 |
2,876.00 |
5.00 |
3,595.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.905 |
MILE |
2,000.00 |
3,810.00 |
3,000.00 |
5,715.00 |
3,700.00 |
7,048.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.588 |
MILE |
700.00 |
411.60 |
800.00 |
470.40 |
1,100.00 |
646.80 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
23   |
EACH |
155.00 |
3,565.00 |
200.00 |
4,600.00 |
250.00 |
5,750.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
4   |
EACH |
205.00 |
820.00 |
250.00 |
1,000.00 |
325.00 |
1,300.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
16   |
EACH |
165.00 |
2,640.00 |
200.00 |
3,200.00 |
250.00 |
4,000.00 |
|
|
| 732-05 |
removal of existing markings
|
1.788 |
MILE |
6,000.00 |
10,728.00 |
6,500.00 |
11,622.00 |
8,900.00 |
15,913.20 |
|
|
| 736-01 |
trenching and backfilling
|
2,535   |
LNFT |
3.50 |
8,872.50 |
4.00 |
10,140.00 |
5.50 |
13,942.50 |
|
|
| 736-03-A |
jacking or boring conduit (2" pec schedule 80)
|
1,855   |
LNFT |
14.00 |
25,970.00 |
16.00 |
29,680.00 |
22.00 |
40,810.00 |
|
|
| 736-03-B |
jacking or boring conduit (3" pec schedule 80)
|
1,865   |
LNFT |
18.00 |
33,570.00 |
20.50 |
38,232.50 |
28.00 |
52,220.00 |
|
|
| 736-04-B |
signal support, 25' mast arm with luminaire
|
1   |
EACH |
9,000.00 |
9,000.00 |
10,000.00 |
10,000.00 |
14,000.00 |
14,000.00 |
|
|
| 736-04-C |
signal support, 35' mast arm with luminaire
|
2   |
EACH |
10,000.00 |
20,000.00 |
12,000.00 |
24,000.00 |
16,000.00 |
32,000.00 |
|
|
| 736-04-D |
signal support, 40' mast arm with luminaire
|
2   |
EACH |
11,000.00 |
22,000.00 |
15,000.00 |
30,000.00 |
17,640.00 |
35,280.00 |
|
|
| 736-04-E |
signal support, 55' mast arm with luminaire
|
5   |
EACH |
15,000.00 |
75,000.00 |
18,000.00 |
90,000.00 |
23,000.00 |
115,000.00 |
|
|
| 736-05-B |
signal head, 3 face l.e.d. (r,y,g)
|
12   |
EACH |
840.00 |
10,080.00 |
1,000.00 |
12,000.00 |
1,300.00 |
15,600.00 |
|
|
| 736-05-C |
signal head, 3 face l.e.d. (r,<-y,<-g)
|
7   |
EACH |
700.00 |
4,900.00 |
800.00 |
5,600.00 |
1,100.00 |
7,700.00 |
|
|
| 736-05-D |
signal head, 3 face l.e.d. (r,y->,g->)
|
1   |
EACH |
700.00 |
700.00 |
800.00 |
800.00 |
1,100.00 |
1,100.00 |
|
|
| 736-05-E |
signal head, 4 face l.e.d. (r,y,<-g,g)
|
4   |
EACH |
1,100.00 |
4,400.00 |
1,400.00 |
5,600.00 |
1,725.00 |
6,900.00 |
|
|
| 736-05-F |
signal head, 5 face l.e.d. (r,y,<-y,g,<-g)
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
1,900.00 |
1,900.00 |
|
|
| 736-05-G |
signal head, 5 face l.e.d. (r,y->,y,g->,g)
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,500.00 |
3,000.00 |
1,900.00 |
3,800.00 |
|
|
| 736-06 |
signal service, modified power pedestal
|
2   |
EACH |
1,450.00 |
2,900.00 |
1,800.00 |
3,600.00 |
2,300.00 |
4,600.00 |
|
|
| 736-09 |
loop detector (saw cut, loop wire, sealant)
|
360   |
LNFT |
11.00 |
3,960.00 |
12.00 |
4,320.00 |
17.00 |
6,120.00 |
|
|
| 736-10-A |
underground junction box type "e"
|
10   |
EACH |
360.00 |
3,600.00 |
450.00 |
4,500.00 |
570.00 |
5,700.00 |
|
|
| 736-10-B |
underground junction box type "f"
|
22   |
EACH |
420.00 |
9,240.00 |
500.00 |
11,000.00 |
660.00 |
14,520.00 |
|
|
| 736-10-C |
underground junction box type "g"
|
3   |
EACH |
740.00 |
2,220.00 |
850.00 |
2,550.00 |
1,200.00 |
3,600.00 |
|
|
| 736-10-D |
underground junction box type "h"
|
4   |
EACH |
800.00 |
3,200.00 |
900.00 |
3,600.00 |
1,300.00 |
5,200.00 |
|
|
| 736-11-A |
conduit (1/2" pec schedule 80)
|
50   |
LNFT |
5.00 |
250.00 |
6.00 |
300.00 |
8.00 |
400.00 |
|
|
| 736-11-B |
conduit (2" pec schedule 80)
|
1,385   |
LNFT |
4.00 |
5,540.00 |
5.00 |
6,925.00 |
6.50 |
9,002.50 |
|
|
| 736-11-C |
conduit (3" pec schedule 80)
|
1,100   |
LNFT |
7.00 |
7,700.00 |
8.00 |
8,800.00 |
11.00 |
12,100.00 |
|
|
| 736-12-A |
conductor 10c (signal #14 awg)
|
6,350   |
LNFT |
3.00 |
19,050.00 |
3.00 |
19,050.00 |
4.00 |
25,400.00 |
|
|
| 736-12-B |
conductor 3c (emergency vehicle cable)
|
3,385   |
LNFT |
2.00 |
6,770.00 |
2.00 |
6,770.00 |
2.75 |
9,308.75 |
|
|
| 736-12-C |
conductor 3c (power)
|
385   |
LNFT |
6.00 |
2,310.00 |
7.00 |
2,695.00 |
9.50 |
3,657.50 |
|
|
| 736-12-D |
conductor 2c (street light cable, #6 awg)
|
3,430   |
LNFT |
6.00 |
20,580.00 |
7.00 |
24,010.00 |
9.50 |
32,585.00 |
|
|
| 736-12-E |
conductor 2c (loop lead-in, #14 awg)
|
1,675   |
LNFT |
6.00 |
10,050.00 |
7.00 |
11,725.00 |
9.50 |
15,912.50 |
|
|
| 736-12-F |
conductor 3c (street sign cable, #14 awg)
|
1,815   |
LNFT |
1.00 |
1,815.00 |
1.50 |
2,722.50 |
1.70 |
3,085.50 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
250,000.00 |
250,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
50,000.00 |
50,000.00 |
80,000.00 |
80,000.00 |
50,000.00 |
50,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
873.12 |
LNFT |
100.00 |
87,312.00 |
225.00 |
196,452.00 |
84.00 |
73,342.08 |
|
|
| S-001 |
sawcuts in asphaltic concrete lifts
|
1,770   |
LNFT |
2.00 |
3,540.00 |
2.50 |
4,425.00 |
4.00 |
7,080.00 |
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
1,245   |
LNFT |
4.00 |
4,980.00 |
3.00 |
3,735.00 |
10.00 |
12,450.00 |
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
525   |
LNFT |
4.00 |
2,100.00 |
4.00 |
2,100.00 |
10.00 |
5,250.00 |
|
|
| S-004 |
unidirectional optical detector single channel
|
12   |
EACH |
650.00 |
7,800.00 |
750.00 |
9,000.00 |
10.00 |
120.00 |
|
|
| S-005 |
video detection camera device and connection (s.
harrell's ferry rd. @ s. sherwood forest blvd.) |
10   |
EACH |
6,000.00 |
60,000.00 |
7,000.00 |
70,000.00 |
9,200.00 |
92,000.00 |
|
|
| S-006 |
video detection camera system (i-12 @ s. sherwood
forest blvd.) |
2   |
EACH |
3,000.00 |
6,000.00 |
4,000.00 |
8,000.00 |
5,500.00 |
11,000.00 |
|
|
| S-007 |
internally illuminated street name sign (18" x varies)
|
8   |
EACH |
3,000.00 |
24,000.00 |
3,500.00 |
28,000.00 |
4,700.00 |
37,600.00 |
|
|
| S-008 |
thirty-six fiber (twenty-four (24) multi-mode fibers
and twelve (12) single mode fibers)communication cable/fiber optic |
1,000   |
LNFT |
5.00 |
5,000.00 |
6.00 |
6,000.00 |
8.00 |
8,000.00 |
|
|
| S-009 |
six fiber (4 multi-mode fibers and 2 single mode
fibers) communication drop cable/fiber optic |
50   |
LNFT |
5.00 |
250.00 |
7.00 |
350.00 |
8.00 |
400.00 |
|
|
| S-010 |
buried traffic fiber optics cable sign (4" x 12")
|
2   |
EACH |
60.00 |
120.00 |
120.00 |
240.00 |
94.00 |
188.00 |
|
|
| S-011 |
splice enclosure
|
2   |
EACH |
3,000.00 |
6,000.00 |
3,000.00 |
6,000.00 |
4,000.00 |
8,000.00 |
|
|
| S-012 |
preterminated patch panel
|
2   |
EACH |
500.00 |
1,000.00 |
600.00 |
1,200.00 |
700.00 |
1,400.00 |
|
|
| S-013 |
patch cord
|
2   |
EACH |
300.00 |
600.00 |
500.00 |
1,000.00 |
430.00 |
860.00 |
|
|
| S-014 |
ethernet switch, cat 5 cable
|
2   |
EACH |
7,000.00 |
14,000.00 |
8,000.00 |
16,000.00 |
10,800.00 |
21,600.00 |
|
|
| S-015 |
modify existing controller
|
lump |
LUMP |
88,000.00 |
88,000.00 |
100,000.00 |
100,000.00 |
138,000.00 |
138,000.00 |
|
|
| S-016 |
saw cutting concrete or asphalt
|
1,565   |
LNFT |
10.00 |
15,650.00 |
10.00 |
15,650.00 |
50.00 |
78,250.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
2,930,217.70 |
|
3,298,674.50 |
|
7,163,558.88 |
|
|
| | NUMBER OF DAYS BID AT $5,000 PER DAY. |
|
|
|
500,000.00 |
|
750,000.00 |
|
900,000.00 |
|
|
| | LIFE CYCLE COST |
|
|
|
|
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
3,430,217.70 |
|
4,048,674.50 |
|
8,063,558.88 |
|
|
|