Lead Project: 451-06-0130
Parish: OUACHITA
Routes:
Description: TWIN CITY GATEWAY PROJECT
Type Const: landscaping, and related work.
Estimated Construction Cost: $332,574.00
 
RankLicenseBidderConstruction Bid
1 32044 QUALITY DESIGN & CONSTRUCTION, INC. $373,229.20
2 24876 LINCOLN CONCRETE, INC. $373,645.60
3 15099 AMETHYST CONSTRUCTION, INC. $381,880.00
4 26977 RAY ANDING CONSRUCTION INC. $465,212.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
QUALITY DESIGN & CONSTRUCTION, INC.
- 2 -
LINCOLN CONCRETE, INC.
- 3 -
AMETHYST CONSTRUCTION, INC.
- 4 -
RAY ANDING CONSRUCTION INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
713-01 temporary signs & barricades lump      LUMP 14,700.00 14,700.00 20,000.00 20,000.00 33,000.00 33,000.00 4,000.00 4,000.00
719-01-A plants (quercus nuttalli, nuttall oak, 2 1/2-3"
caliper, 9-10' ht x 5' spread, 48" single clear
trunk, 30 gal cont)
87      EACH 250.00 21,750.00 330.00 28,710.00 245.00 21,315.00 300.00 26,100.00
719-01-B plants (magnolia grandiflora, southern magnolia, 2"
caliper, 8-9' ht x 4' spread, 36" single clear
trunk, 30 gal cont)
42      EACH 250.00 10,500.00 340.00 14,280.00 265.00 11,130.00 290.00 12,180.00
719-01-C plants (acer rubrum "drummondii", drummond red
maple,2 1/2" cal,9-10'ht x 4' spread, 36" single
cl trunk, 30 gal cont)
118      EACH 250.00 29,500.00 320.00 37,760.00 245.00 28,910.00 300.00 35,400.00
719-01-D plants (taxodium distichum, bald cypress, 1 1/2-2" cal,
8' ht x 4' spread, 36" single clear trunk,
15 gal cont)
614      EACH 210.00 128,940.00 225.00 138,150.00 180.00 110,520.00 200.00 122,800.00
719-01-F plants (lagerstroemia indica 'natchez',natchez crape
myrtle,8-10' ht x 4-5' spread,3-5 stem min
multi-trunk, 30 gal con)
253      EACH 250.00 63,250.00 300.00 75,900.00 245.00 61,985.00 300.00 75,900.00
719-02-A top dressing mulch (8" depth)(pine straw) 20,604      SQYD 2.30 47,389.20 1.40 28,845.60 5.00 103,020.00 8.00 164,832.00
727-01 mobilization lump      LUMP 24,800.00 24,800.00 20,000.00 20,000.00 6,000.00 6,000.00 10,000.00 10,000.00
740-01 construction layout lump      LUMP 7,100.00 7,100.00 5,000.00 5,000.00 1,000.00 1,000.00 10,000.00 10,000.00
744-01 traffic control management lump      LUMP 25,300.00 25,300.00 5,000.00 5,000.00 5,000.00 5,000.00 4,000.00 4,000.00
                       
 CONTRACTOR TOTAL       373,229.20   373,645.60   381,880.00   465,212.00