| REBID |
|
| |
| Lead Project: 014-01-0009 |
| Parish: CALCASIEU |
| Routes: US 165, I-10 |
| Description: US 165: US 90 - JEFFERSON DAVIS PARISH LINE (CM) |
| Type Const:
patching, cold planing, overlay, pavement markings, and rela ted work
|
| Estimated Construction Cost: $594,314.12 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R. E. HEIDT CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 502-01 |
superpave asphaltic concrete
|
3,755.2 |
TON |
115.00 |
431,848.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
34,138   |
SQYD |
2.00 |
68,276.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 948   |
CUYD |
1.12 |
- 1,061.76 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,700.00 |
9,700.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.756 |
MILE |
243.00 |
183.71 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.818 |
MILE |
342.00 |
963.76 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
4.732 |
MILE |
552.00 |
2,612.06 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
120   |
SQYD |
89.00 |
10,680.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
611   |
EACH |
5.40 |
3,299.40 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.656 |
MILE |
2,258.00 |
21,803.25 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.699 |
MILE |
830.00 |
7,220.17 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,538.00 |
3,538.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
12,075.00 |
12,075.00 |
|
|
|
|
|
|
| S-001 |
dynamic message sign unit
|
4   |
EACH |
4,778.00 |
19,112.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
690,249.59 |
|
|
|
|
|
|
|