Parish |
Letting Date |
Project |
Route |
Project Name |
Type Improvement |
Estimated Cost Range |
Length (miles) |
Acadia |
2024-03-13 |
H.014859 |
LA 365 |
La 365: La 370 - La 13 |
Patch, Mill & Overlay |
$2,500,000 to $5,000,000 |
1.96 |
Acadia |
2024-06-12 |
H.014220 |
|
Nation Road Over Coulee Duralde |
Bridge Replacement No New Alignment |
$250,000 to $500,000 |
0.00 |
Acadia |
2024-07-10 |
H.010222 |
LA 97 |
La 97: La 98 - La 368 |
Stabilize Base & Overlay |
$2,500,000 to $5,000,000 |
5.90 |
Acadia |
2024-07-10 |
H.011829 |
I-10, LA 100 |
Imp@la13 & La100 & I-10 Acc.Rd (Crowley) |
Widening, Class II Base, Base Rehab, and Asphalt Overlay |
$2,500,000 to $5,000,000 |
1.60 |
Acadia |
2024-07-10 |
H.015285 |
LA 755 |
La 755: La 368 - 0.406 Mi Sw Of La 3123 |
Mill, In-place Base Rehab & Overlay |
$5,000,000 to $7,500,000 |
3.60 |
Acadia |
2024-09-11 |
H.015618 |
LA 13 |
La13:0.2 Mi N Verm P/L ? 1.023 Mi N La92 |
Patch, Mill, and Overlay |
$5,000,000 to $7,500,000 |
3.87 |
Allen |
2024-06-30 |
H.015075 |
|
9th St: Up Xing (Kinder) |
Closure Of RR Crossing |
$0 to $100,000 |
0.02 |
Allen |
2024-06-30 |
H.015482 |
US 165 |
Us 165: Up Xing (Oakdale) |
Remove Crossing |
$0 to $100,000 |
0.01 |
Allen |
2024-08-14 |
H.015277 |
US 190 |
Us 190: Calcasieu River Br - US 165 |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
4.58 |
Ascension |
2023-12-13 |
H.014642 |
|
Pr 929 Overlay: US 61 - La 42 |
Mill, Patch and Overlay |
$1,000,000 to $2,500,000 |
3.38 |
Ascension |
2024-01-10 |
H.012057 |
LA 431 |
La 431:villar Canal and Drainage Bridges |
Bridge Replacement |
$7,500,000 to $10,000,000 |
0.49 |
Ascension |
2024-01-10 |
H.015422 |
LA 945 |
La 945: La 3089 - La 308 |
Asphalt Patching, Pcc Patching, Milling, Asphalt Overlay |
$500,000 to $1,000,000 |
1.46 |
Ascension |
2024-01-10 |
H.015438 |
LA 928 |
La 928: La 74 - La 427 |
Patching, Milling, Asphalt Overlay |
$1,000,000 to $2,500,000 |
5.68 |
Ascension |
2024-02-14 |
H.014116 |
LA 943 |
La 943: La 308 - La 1 N Intersection |
Stabilize Base & Overlay |
$2,500,000 to $5,000,000 |
7.81 |
Ascension |
2024-03-13 |
H.014762 |
LA 44 |
La 44: I-10 - La 621 |
Pcc Patching |
$500,000 to $1,000,000 |
4.61 |
Ascension |
2024-04-10 |
H.014088 |
US 61, LA 427 |
Us 61: Int. Improvements At La 427 |
Add Nb 2nd Left & Receiving Lane |
$2,500,000 to $5,000,000 |
0.51 |
Ascension |
2024-05-31 |
H.014634 |
LA 22 |
La 22: Ic RR Xing (Ascension) |
Replace Railroad Crossing Surface |
$0 to $100,000 |
0.01 |
Ascension |
2024-06-12 |
H.014422 |
LA 931 |
La 931 @ Roddy Rd. & Joe Sevario Rd. |
Roundabout |
$1,000,000 to $2,500,000 |
0.08 |
Ascension |
2024-06-12 |
H.014918 |
LA 73 |
La 73 Roundabout At Bluff Rd Connector |
Construct a Roundabout and Add a Southbound U-turn @ I-10 Wb |
$1,000,000 to $2,500,000 |
0.10 |
Ascension |
2024-07-10 |
H.014866 |
LA 30 |
La 30: Veteran's Blvd - US 61 |
Patch, Mill, Overlay |
$2,500,000 to $5,000,000 |
3.73 |
Ascension |
2024-07-10 |
H.015282 |
LA 73 |
La 73: La 429 - La 621 |
Mill, Patch, & Overlay |
$1,000,000 to $2,500,000 |
2.33 |
Ascension |
2024-08-14 |
H.014407 |
LA 621 |
La 621 At Roddy Rd |
Roundabout |
$1,000,000 to $2,500,000 |
0.08 |
Ascension |
2024-08-14 |
H.014409 |
LA 933 |
La 933 At Joe Sevario Road |
Roundabout |
$1,000,000 to $2,500,000 |
0.08 |
Ascension |
2024-08-14 |
H.015267 |
LA 431 |
La 431: Left Turn Lane At La 621 |
Add Left Turn Lane |
$1,000,000 to $2,500,000 |
0.29 |
Ascension |
2024-10-09 |
H.010795 |
LA 42 |
La 42: Roundabout At Joe Sevario Road |
Install Single Lane Roundabout |
$1,000,000 to $2,500,000 |
0.28 |
Ascension |
2024-11-13 |
H.015097 |
US 61 |
Us 61 Superstreet: Lowes Ave to La 44 |
Signalized Directional Medians |
$1,000,000 to $2,500,000 |
0.47 |
Ascension |
2024-11-13 |
H.015101 |
LA 44 |
Us 61 Superstreet: Lowes At La 44 Rndabt |
Construct Roundabout At La 44 and Lowes Ave |
$2,500,000 to $5,000,000 |
0.16 |
Assumption |
2024-01-10 |
H.015556 |
LA 308 |
La 308: La 1011 - Franklin Ave |
Patch, Mill, Thin Overlay(1" Dense Mix) |
$500,000 to $1,000,000 |
6.76 |
Assumption |
2024-01-10 |
H.015604 |
LA 3199-P |
Pear St At La 1: Drainage |
Enclose Drainage Canal and Remove Timber Bulkhead |
$1,000,000 to $2,500,000 |
0.12 |
Assumption |
2024-07-31 |
H.015651 |
|
Belle Rose Walking Trail |
Construction Of 860' Long Trail Connecting Local Businesses |
$0 to $100,000 |
0.00 |
Avoyelles |
2024-03-13 |
H.014879 |
LA 1196 |
La 1196: La 115 - Vick Rd |
Medium Overlay |
$2,500,000 to $5,000,000 |
8.35 |
Avoyelles |
2024-06-12 |
H.015593 |
LA 115 |
La 115: La 1188 - La 114 W Jct |
In-place Stabilize Base and Overlay |
$1,000,000 to $2,500,000 |
2.54 |
Avoyelles |
2024-07-10 |
H.012545 |
LA 454 |
La 454: Wiggins Bayou Bridge |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.22 |
Avoyelles |
2024-07-10 |
H.014273 |
|
Monroe Fabre Over Bayou Des Glaises |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.02 |
Avoyelles |
2024-09-11 |
H.015543 |
LA 452 |
La 452: Drainage At Caldwell St. |
Drainage Improvements |
$250,000 to $500,000 |
0.13 |
Avoyelles |
2024-11-13 |
H.015784 |
LA 1181, LA 1182 |
La 1181 & La 1182: Asphalt Overlays |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
3.00 |
Beauregard |
2024-01-10 |
H.015591 |
LA 3226 |
La 3226: US 190 - Vernon P/L |
Patch, Mill 2", Overlay 3.5" On Roadway and 1.5" On Shoulder |
$1,000,000 to $2,500,000 |
3.01 |
Beauregard |
2024-03-13 |
H.014800 |
LA 27 |
La 27: White Acres Rd - La 110 |
Microsurfacing |
$500,000 to $1,000,000 |
4.05 |
Beauregard |
2024-07-10 |
H.014792 |
LA 112 |
La 112: La 113 - Allen P/L |
Patch, Mill & Overlay |
$500,000 to $1,000,000 |
2.48 |
Beauregard |
2024-09-11 |
H.014083 |
US 171 |
Us 171: La 112 - Mlk Dr |
Mill and Overlay |
$500,000 to $1,000,000 |
1.25 |
Beauregard |
2024-09-30 |
H.014636 |
LA 3226 |
La 3226: Kcs RR Xing (Beauregard) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
Beauregard |
2024-10-09 |
H.013257 |
US 190 |
Us 190: Texas S/L - La 111 |
Thin Overlay |
$2,500,000 to $5,000,000 |
9.81 |
Bienville |
2024-02-14 |
H.012942 |
LA 797 |
La 797: La 507 to Lincoln Pl |
Asphaltic Concrete Pavement Resurfacing |
$1,000,000 to $2,500,000 |
3.34 |
Bienville |
2024-03-13 |
H.015297 |
US 80 |
Us 80: Ada - La 154 |
Chip Seal |
$250,000 to $500,000 |
4.68 |
Bienville |
2024-04-10 |
H.015299 |
US 371 |
Us 371: Red River P/L - Webster P/L |
Mill, Patch and Overlay |
$7,500,000 to $10,000,000 |
12.02 |
Bossier |
2024-01-10 |
H.015546 |
|
Caplis Sligo Road Over Red Chute Bayou |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.01 |
Bossier |
2024-03-13 |
H.015519 |
|
Smith Road Over Red Chute Bayou |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.04 |
Bossier |
2024-06-30 |
H.013021 |
|
Benton Rd: Kcs RR Xing (Bossier City) |
Install Median At Xing |
$0 to $100,000 |
0.03 |
Bossier |
2024-06-30 |
H.013708 |
|
Barksdale Blvd: Up Xing (Bossier City) |
Remove RR Crossing and Fill In With Asphalt |
$0 to $100,000 |
0.01 |
Bossier |
2024-07-10 |
H.014233 |
LA 160 |
La 160: Cypress Bayou & Relief Bridges |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.17 |
Bossier |
2024-09-11 |
H.012638 |
LA 3105 |
La 3105: Greenacres Blvd - La 72 Phase 2 |
Access Management |
$1,000,000 to $2,500,000 |
1.52 |
Bossier |
2024-09-11 |
H.015010 |
|
Local Road Striping & Signing (Bossier) |
Safety Study For Pavement Markings and Signage |
$2,500,000 to $5,000,000 |
20.85 |
Bossier |
2024-09-30 |
H.015474 |
LA 72 |
La 72: Kcs RR Xing (Bossier City) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
Bossier |
2024-10-31 |
H.015208 |
|
Schex, Roy & Gilbert Kcs Xings(Bossier) |
Install Two RR Gates and Close a Crossing |
$250,000 to $500,000 |
0.03 |
Bossier |
2024-11-13 |
H.014217 |
LA 537 |
La 537: Bridges Near Plain Dealing |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.50 |
Bossier, Caddo |
2024-03-13 |
H.015629 |
I-220 |
I-220: I-20 E to I-20 W Pavement Marking |
Replace Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
18.11 |
Caddo |
2023-12-13 |
H.012930 |
LA 3049 |
La 3049: Cowhide Bayou to La 530 |
Asphaltic Concrete Pavement Resurfacing |
$500,000 to $1,000,000 |
1.04 |
Caddo |
2024-01-10 |
H.015005 |
LA 173 |
La 173: Left Turn Lanes At Russell Road |
Add Left Turn Lanes On La 173 On to Russell Road |
$500,000 to $1,000,000 |
0.62 |
Caddo |
2024-01-10 |
H.015255 |
LA 3132 |
La 3132: I-20 - US 171 Signing |
Permanent Signing |
$5,000,000 to $7,500,000 |
5.18 |
Caddo |
2024-02-14 |
H.006474 737-09-0106 |
LA 3132, I-49, LA 526 |
Shreveport Immediate ITS Phase 2b |
Develop Sea For ITS Equipment Deployment |
$1,000,000 to $2,500,000 |
12.75 |
Caddo |
2024-02-14 |
H.014410 |
|
Linwood Avenue Reconstruction-phase Iii |
Roadway Reconstruction - Joint and Panel Repair |
$5,000,000 to $7,500,000 |
0.99 |
Caddo |
2024-02-14 |
H.014411 |
|
Linwood Avenue Reconstruction-phase Iv |
Roadway Reconstruction - Joint and Panel Repair |
$10,000,000 to $15,000,000 |
1.00 |
Caddo |
2024-03-13 |
H.012937 |
LA 3049 |
La 3049: Grimmit Dr to George Rd |
Asphaltic Concrete Pavement Resurfacing |
$1,000,000 to $2,500,000 |
4.15 |
Caddo |
2024-06-12 |
H.014229 |
|
Crawford Road Over Tiger Branch |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Caddo |
2024-06-30 |
H.015475 |
|
Several Up Xing (Hollywood Shreveport) |
Rr Signal Upgrades |
$500,000 to $1,000,000 |
0.03 |
Caddo |
2024-07-10 |
H.006472 737-09-0104 |
|
City Of Shreveport Traffic Sig Bkup |
Traffic Signal Power Generator Inst |
$250,000 to $500,000 |
0.00 |
Caddo |
2024-07-10 |
H.007404 744-09-0018 |
LA 530 |
Oil City Shared Use Path |
Shared Use Path |
$100,000 to $250,000 |
0.57 |
Caddo |
2024-07-10 |
H.010468 |
I-20 |
I-20: Monkhouse to I-49 |
Remove and Replace Pcc, Widening |
$150,000,000 to $175,000,000 |
4.55 |
Caddo |
2024-07-10 |
H.014082 |
US 171 |
Us 171: La 3132 to US 80 |
Mill, Patch, and Overlay |
$2,500,000 to $5,000,000 |
4.61 |
Caddo |
2024-07-31 |
H.015646 |
|
American Rose Ctr Trail Restoration Ph3 |
Restoration Of 636' Of Walking Trail In a Nature Area |
$0 to $100,000 |
0.00 |
Caddo |
2024-08-14 |
H.014756 |
I-20 |
I-20: Decel Lane Ext Ex 8 |
Deceleration Lane Extension |
$1,000,000 to $2,500,000 |
0.41 |
Caddo |
2024-09-11 |
H.010206 |
LA 3132, LA 523 |
La 3132 At La 523: Extend C Of a |
Extend Control Of Access La 3132 At La 523 |
$1,000,000 to $2,500,000 |
0.63 |
Caddo |
2024-10-09 |
H.015677 |
I-49 |
I-49: Sb Exit Ramp At Southern Loop |
Southbound Right Turn Lane Addition |
$1,000,000 to $2,500,000 |
0.56 |
Calcasieu |
2024-01-10 |
H.014964 |
LA 27 |
La 27: 0.12 Mi S Richardson Rd ? La 12 |
Road Diet |
$250,000 to $500,000 |
1.01 |
Calcasieu |
2024-01-10 |
H.015598 |
I-210 |
I-210: Hurricane Laura Lighting Repairs |
Electrical/Lighting Repairs/Upgrades |
$7,500,000 to $10,000,000 |
3.31 |
Calcasieu |
2024-02-14 |
H.012083 |
I-10 |
I-10: Calcasieu River Bridge Int Repairs |
Bridge Interim Repairs |
$2,500,000 to $5,000,000 |
1.30 |
Calcasieu |
2024-02-14 |
H.014602 |
|
Dist 07 Hq Bldg |
Build New Hurricane Resistant Dist 07 Hq Building |
$2,500,000 to $5,000,000 |
0.00 |
Calcasieu |
2024-03-13 |
H.014782 |
LA 27 |
La 27: La 397 - La 14 |
Microsurfacing |
$250,000 to $500,000 |
3.94 |
Calcasieu |
2024-05-08 |
H.011196 |
|
Lake Charles Srts Proj. - Barbe Elem. |
Sidewalks, Striping and Signing |
$500,000 to $1,000,000 |
1.60 |
Calcasieu |
2024-06-12 |
H.012603 |
LA 27 |
Ellender Br Bearing and Span Lock Rehab. |
Movable Bridge Machinery Repairs |
$100,000 to $250,000 |
0.55 |
Calcasieu |
2024-07-10 |
H.014485 |
LA 14, US 171 |
La 14: Power Center Pkwy - US 90 |
Pccp Patch, Repair Joints, 1.5" Overlay, Ogfc |
$1,000,000 to $2,500,000 |
2.57 |
Calcasieu |
2024-07-10 |
H.015286 |
LA 397 |
La 397: Gayle Rd - La 27 |
Patch & Overlay |
$500,000 to $1,000,000 |
3.91 |
Calcasieu |
2024-08-14 |
H.014815 |
LA 3059 |
La 3059: Goos Ferry Rd - Red Marceaux Rd |
Patch, Mill & Overlay |
$1,000,000 to $2,500,000 |
3.99 |
Calcasieu |
2024-09-11 |
H.014796 |
LA 385 |
La 385: Cameron P/L - Black Bayou Br |
Widen, Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
2.24 |
Calcasieu |
2024-09-11 |
H.015278 |
LA 397 |
La 397: US 90 - 400' N Lebleu Cemetery R |
Pccp Patching and Pavement Rehab |
$1,000,000 to $2,500,000 |
1.26 |
Calcasieu |
2024-10-09 |
H.015304 |
I-10 |
I-10 Service Roads: Joint Clean & Seal |
Clean and Seal Pcc Joints |
$500,000 to $1,000,000 |
1.80 |
Calcasieu |
2024-10-09 |
H.015353 |
I-210 |
I-210: Eb Ryan St Exit Modifications |
Ramp Modifications, Widening, Fog Seal, Ada Improvements |
$500,000 to $1,000,000 |
0.54 |
Calcasieu |
2024-11-13 |
H.012052 |
LA 3092 |
La3092: Gauthier Rd @ Lake St Roundabout |
Add a Roundabout to Aid In Traffic Flow |
$2,500,000 to $5,000,000 |
0.59 |
Calcasieu |
2024-11-13 |
H.012685 |
LA 385, LA 3186 |
La 385: Ryan Street Intersection Imprs |
Systemic Signal Improvement, Striping Enhancement, Sidewalks |
$5,000,000 to $7,500,000 |
2.64 |
Caldwell |
2024-08-14 |
H.014249 |
LA 126 |
La 126: Bridge Creek Bridge |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.09 |
Caldwell |
2024-10-09 |
H.013202 |
US 165 |
Us 165: La 4 - Union Pacific Overpass |
Mill & Overlay |
$2,500,000 to $5,000,000 |
7.02 |
Caldwell |
2024-10-09 |
H.015777 |
LA 126, LA 849 |
La 126 & La 849: Asphalt Overlays |
Patch and Overlay |
$2,500,000 to $5,000,000 |
7.71 |
Caldwell, Concordia |
2024-08-14 |
H.015756 |
US 165, US 84 |
Us 165 & US 84 PCCP Patching |
Pccp Patching |
$1,000,000 to $2,500,000 |
15.29 |
Cameron |
2024-07-10 |
H.014809 |
LA 82 |
La 82: Mermentau Br - Vermillion P/L |
Patch, Mill & Overlay |
$5,000,000 to $7,500,000 |
24.49 |
Cameron |
2024-07-10 |
H.014870 |
LA 1143 |
La 1143: La 27 - Parish Rd 216 |
Patch, Widening & Overlay |
$1,000,000 to $2,500,000 |
7.15 |
Catahoula |
2023-12-13 |
H.014862 |
LA 1018-1, LA 923, LA 1018-3, LA 1018-2 |
La 923: La 126 - La 124 |
Asphalt Overlay |
$1,000,000 to $2,500,000 |
4.78 |
Catahoula |
2024-08-14 |
H.012842 |
LA 124-P |
La124 Extension Near Larto (Seg 2&3) |
New Roadway Construction/Re-construction, Bridge Replacement |
$7,500,000 to $10,000,000 |
4.34 |
Concordia |
2024-08-14 |
H.014118 |
LA 900 |
La 900: La 568 - US 65 |
Patch & Overlay |
$1,000,000 to $2,500,000 |
4.27 |
Concordia |
2024-10-09 |
H.014798 |
LA 565 |
La 565: La 129 - La 15 |
Patch, Mill & Overlay |
$1,000,000 to $2,500,000 |
8.48 |
Concordia, Tensas |
2024-01-10 |
H.014806 |
LA 568 |
La 568: US 65 - La 569 |
Patch, Mill and Overlay |
$2,500,000 to $5,000,000 |
6.18 |
DeSoto |
2024-02-14 |
H.012982 |
LA 3248 |
La 3248: Naborton Loop |
Asphaltic Concrete Pavement Resurfacing |
$2,500,000 to $5,000,000 |
3.66 |
DeSoto |
2024-04-10 |
H.012939 |
LA 3015 |
La 3015: US 171 to La 175 |
Asphaltic Concrete Pavement Resurfacing |
$1,000,000 to $2,500,000 |
6.82 |
DeSoto |
2024-06-30 |
H.014574 |
US 171 |
Us 171: Kcs RR Xing (Mansfield) |
Replace Crossing Surface |
$100,000 to $250,000 |
0.01 |
DeSoto |
2024-08-31 |
H.014462 |
LA 175 |
La 175: Kcs RR Xing (Frierson) |
Improve Road Aprroaches to RR Crossing |
$250,000 to $500,000 |
0.01 |
DeSoto |
2024-11-13 |
H.012614 |
LA 175 |
La 175: La 509 to La 5 |
Asphaltic Concrete Pavement Resurfacing |
$5,000,000 to $7,500,000 |
10.40 |
District 04 |
2024-05-08 |
H.009052 |
|
I-20: Pavement Marking Replacement Ix |
Plastic Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
0.00 |
District 08 |
2024-04-10 |
H.012641 |
|
District 08 Flashing Yellow Arrow Part 2 |
Traffic Signal Upgrades |
$2,500,000 to $5,000,000 |
0.00 |
District 08 |
2024-11-13 |
H.011960 |
|
District 08 Controller Upgrades |
Upgrade Of Existing Signal Controllers |
$250,000 to $500,000 |
0.00 |
District 61 |
2024-07-10 |
H.013096 |
|
Dist. 61 Hurricane Protection Screens |
Retrofit Existing Windows to 21 Buildings In District 61 |
$500,000 to $1,000,000 |
0.00 |
East Baton Rouge |
2023-12-13 |
H.013029 |
I-12 |
I-12 @ Sherwood Forest Ped/Bike Safety |
Crosswalk and Pedestrian Improvements |
$1,000,000 to $2,500,000 |
0.20 |
East Baton Rouge |
2023-12-19 |
H.015783 |
LA 410 |
La 410: Emergency Drainage Repair |
Install Drainage Structures and Repair the Roadway |
$250,000 to $500,000 |
0.03 |
East Baton Rouge |
2023-12-31 |
H.012499 |
|
Wards Creek Trail - Pecue Extension |
Construction Of a 5,700' Long By 12' Wide Ped/Bike Trail |
$250,000 to $500,000 |
0.00 |
East Baton Rouge |
2023-12-31 |
H.014932 |
|
Bbay RR Xings Preemption (Baker) |
Connect RR Crossing With Traffic Signals For Preemption |
$0 to $100,000 |
0.08 |
East Baton Rouge |
2024-01-10 |
H.013267 |
US 61-X, US 61 |
Scotlandville Pkwy to Dwtn Br Trail-ph 1 |
Construct Pedestrian/Bike Paths |
$2,500,000 to $5,000,000 |
5.73 |
East Baton Rouge |
2024-01-10 |
H.014319 |
|
Cedarcrest Avenue Over Weiner Creek |
Bridge Replacment No New Alignment |
$500,000 to $1,000,000 |
0.01 |
East Baton Rouge |
2024-01-10 |
H.014591 |
I-12 |
I-12: US 61 Bridges Girder Repairs |
Girder Repair and Over-height Impact Mitigation |
$250,000 to $500,000 |
0.60 |
East Baton Rouge |
2024-01-10 |
H.015142 |
|
Planchet Road Improvements |
Stabilize Base Course, Mill and Overlay, Widening |
$1,000,000 to $2,500,000 |
0.33 |
East Baton Rouge |
2024-01-10 |
H.015352 |
US 61 |
Us 190: US 61 Overpass Int. Repairs |
Strengthing Of the Concrete Girders Using Frp |
$1,000,000 to $2,500,000 |
0.03 |
East Baton Rouge |
2024-02-14 |
H.009290 |
|
Lsu Laboratory School Srts Project |
Bicycle Lanes and Education and Encouragement Activities |
$500,000 to $1,000,000 |
0.28 |
East Baton Rouge |
2024-02-14 |
H.010253 |
|
Bluebonnet Blvd. Pump Stat. Imp |
Upgrade Pump Station and Add Advanced Warning System |
$250,000 to $500,000 |
0.01 |
East Baton Rouge |
2024-02-14 |
H.012469 |
US 190 |
Us 190: Mrb - Navig Light Repl (Hbi) |
Navigational Lighting System Replacement |
$1,000,000 to $2,500,000 |
1.11 |
East Baton Rouge |
2024-02-14 |
H.015126 |
|
Baker Blvd Improvements: La 19 to Mchugh |
Mill and Overlay Baker Blvd From La 19 to Mchugh Rd |
$250,000 to $500,000 |
1.04 |
East Baton Rouge |
2024-02-14 |
H.015628 |
I-110 |
I-110: I-10 to US 61 Pavement Markings |
Replace Pavement Striping and Raised Pavement Markers |
$1,000,000 to $2,500,000 |
9.05 |
East Baton Rouge |
2024-04-10 |
H.015424 |
LA 67 |
La 67: Plank Rd. @airline - Girder Rep. |
Repair Of Bridge Girders Damage Due to Truck Impact |
$500,000 to $1,000,000 |
0.05 |
East Baton Rouge |
2024-04-10 |
H.015526 |
LA 3164 |
Chippewa St Pump Station Imp Phase 1 |
Lights, Gates and Signage to Warn Travelers Of High Water |
$250,000 to $500,000 |
0.42 |
East Baton Rouge |
2024-05-31 |
H.014632 |
LA 3164 |
La 3164: Ic RR Xing (Baton Rouge) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
East Baton Rouge |
2024-06-01 |
H.015239 |
|
Lincoln Theater Trail and Trailhead |
Contruction Of a 2700 Ft Bike/Ped Connector |
$100,000 to $250,000 |
0.09 |
East Baton Rouge |
2024-06-30 |
H.014897 |
|
Thomas & Leisure Rd: Ic RR Xings (Ebr) |
Install Upgraded RR Signs |
$0 to $100,000 |
0.10 |
East Baton Rouge |
2024-06-30 |
H.015145 |
|
Kcs Several RR Xings (Scotlandville) |
Rr Signal Upgrades and Closure |
$500,000 to $1,000,000 |
0.05 |
East Baton Rouge |
2024-07-10 |
H.010729 |
LA 67, US 61-X |
Traffic Signal Coord & Synch Ph Vi (Ebr) |
Traffic Signal Coordination & Synchronization |
$7,500,000 to $10,000,000 |
5.83 |
East Baton Rouge |
2024-07-10 |
H.011543 |
LA 3164, LA 408, LA 37, US 61-X, US 61 |
Traffic Signal Coord & Synch Ph Vii(Ebr) |
Traffic Signal Coordination and Signal Synchronization |
$7,500,000 to $10,000,000 |
8.27 |
East Baton Rouge |
2024-07-10 |
H.014171 |
LA 30 |
La 30(Nicholson Dr) Clearing & Grubbing |
Clearing and Grubbing |
$100,000 to $250,000 |
1.20 |
East Baton Rouge |
2024-08-14 |
H.010251 |
LA 3164 |
Chippewa St Pump Station Imp Phase 2 |
Replace/Upgrade Pump House Components |
$1,000,000 to $2,500,000 |
0.43 |
East Baton Rouge |
2024-08-14 |
H.014281 |
US 190 |
Us 190: Miss River Br Repair Ph. 3 (Hbi) |
Repair Of Stringer Connections and Finger Joints |
$7,500,000 to $10,000,000 |
1.11 |
East Baton Rouge |
2024-08-14 |
H.014318 |
|
Gurney Road Bridges |
Bridge Replacment No New Alignement |
$1,000,000 to $2,500,000 |
0.71 |
East Baton Rouge |
2024-09-11 |
H.002337 257-03-0025 |
LA 327-S |
La 327-s: Bayou Fountain |
New Bridge |
$1,000,000 to $2,500,000 |
1.90 |
East Baton Rouge |
2024-09-11 |
H.013073 |
|
Greenwell Springs & Wooddale Sidewalks |
Construction Of Sidewalks |
$500,000 to $1,000,000 |
1.39 |
East Baton Rouge |
2024-09-11 |
H.015251 |
LA 3006 |
La 3006: La 19 - La 67 |
Pms Recommends a Structural Overlay |
$2,500,000 to $5,000,000 |
2.54 |
East Baton Rouge |
2024-09-30 |
H.013864 |
US 61 |
Us 61: Ic RR Xing (Baton Rouge) |
Upgrade RR Crossing's Signal |
$250,000 to $500,000 |
0.01 |
East Baton Rouge |
2024-09-30 |
H.015717 |
|
College Dr: Kcs RR Xing(Baton Rouge) |
Add Better Raised Median & Mast Flashers In Median |
$250,000 to $500,000 |
0.03 |
East Baton Rouge |
2024-10-09 |
H.002320 255-30-0014 |
LA 3034, LA 408 |
Sullivan Rd (Wax - Hooper) |
4 Ln Divided Conc Hwy Raised Median |
$15,000,000 to $20,000,000 |
1.13 |
East Baton Rouge |
2024-11-13 |
H.015307 |
LA 410 |
La 410: La 408 - La 64 |
Asphalt Surface Treatment |
$250,000 to $500,000 |
8.17 |
East Baton Rouge, Livingston |
2024-04-10 |
H.012374 |
I-12 |
I-12 Ramp Meter Upgrades |
Improve Existing Ramp Meter System to Allow Variable Timing |
$1,000,000 to $2,500,000 |
14.68 |
East Carroll |
2024-07-10 |
H.015236 |
LA 134 |
La 134: Drainage Improvements |
Asphalt Lifts to Raise Roadway & Re-establish Exist. Ditches |
$100,000 to $250,000 |
0.12 |
East Feliciana |
2024-01-10 |
H.002365 259-01-0011 |
LA 63 |
La 63 Bridges Near Bluff Creek |
New Bridges |
$10,000,000 to $15,000,000 |
1.71 |
East Feliciana |
2024-04-10 |
H.015311 |
LA 67 |
La 67: Culvert Replacement (Clinton) |
Drainage Upgrades, Asphalt Overlay |
$250,000 to $500,000 |
0.05 |
East Feliciana |
2024-07-10 |
H.014251 |
LA 422 |
La 422: Bridge Over Unnamed Stream |
Bridge Replacement |
$500,000 to $1,000,000 |
0.29 |
East Feliciana |
2024-10-09 |
H.012554 |
LA 67 |
La 67: La 432 - Miss St Ln |
Stabilize and Overlay |
$2,500,000 to $5,000,000 |
3.90 |
Evangeline |
2024-01-10 |
H.014791 |
LA 106 |
La 106: La 10 - La 13 |
Mill, In-place Base Rehab & Overlay |
$7,500,000 to $10,000,000 |
9.16 |
Evangeline |
2024-07-10 |
H.015757 |
LA 13 |
La 13: La 104 - La 10 |
Scrub Seal & Thin Overlay |
$1,000,000 to $2,500,000 |
3.44 |
Evangeline |
2024-09-11 |
H.015619 |
LA 106 |
La 106: US 167 - Avoyelles P/L |
Mill, Base Rehabilitation, Asphalt Overlay |
$10,000,000 to $15,000,000 |
8.26 |
Evangeline |
2024-11-13 |
H.015621 |
LA 3277 |
La 3277: La 757 - La 104 |
Mill, Base Stabilization, and Overlay |
$5,000,000 to $7,500,000 |
4.90 |
Evangeline, St. Landry |
2024-09-11 |
H.015620 |
LA 758 |
La 758: US 190 - La 29 |
Mill, Base Rehabilitation, Asphalt Overlay |
$2,500,000 to $5,000,000 |
3.10 |
Evangeline, St. Landry |
2024-11-13 |
H.015096 |
LA 29 |
La 29: La 13 - La 758 |
Patch, Mill & Overlay |
$5,000,000 to $7,500,000 |
5.41 |
Franklin |
2024-07-10 |
H.012199 |
US 425 |
Us 425: Winnsboro 5-lane |
Cold Plane & Overlay |
$2,500,000 to $5,000,000 |
3.05 |
Franklin |
2024-08-14 |
H.011564 |
LA 857 |
La 857: La 15 - La 132 |
Patch & Overlay |
$1,000,000 to $2,500,000 |
4.81 |
Grant |
2024-01-10 |
H.014840 |
LA 1239-2, LA 1239-1 |
La 1239: Creola St - US 71 |
Mill, In-place Base Rehab, and Overlay |
$500,000 to $1,000,000 |
1.34 |
Grant |
2024-01-10 |
H.015330 |
LA 472 |
La 472: Lincecum Village Rd - La 500 |
Patch, Mill, & Overlay |
$1,000,000 to $2,500,000 |
2.37 |
Grant |
2024-02-14 |
H.015063 |
LA 524, LA 502, LA 3169 |
La 3169, La 524, La 502: Overlays |
Base Stablization, Patching, Milling, Overlay |
$2,500,000 to $5,000,000 |
7.06 |
Grant |
2024-09-11 |
H.013205 |
US 165 |
Us 165: Sb Lane - La 1230 to Lasalle P/L |
Patching, Milling, and Overlay |
$500,000 to $1,000,000 |
2.13 |
Grant |
2024-10-08 |
H.015062 |
LA 3169, LA 524, LA 502 |
La 3169, La 524, La 502: Grant Parish Rt |
Provide $3,949,784 In Funds to Grant Parish |
$2,500,000 to $5,000,000 |
6.06 |
Grant |
2024-10-08 |
H.015244 |
LA 502 |
La 502: Village Of Georgetown Rt |
Provide $460,334 In Funds to the Village Of Georgetown |
$250,000 to $500,000 |
1.00 |
Iberia |
2023-12-13 |
H.015356 |
LA 3195 |
La 3195: La 182 - La 86 |
Patch, Mill, and Asphalt Overlay |
$1,000,000 to $2,500,000 |
1.82 |
Iberia |
2024-02-14 |
H.013083 |
LA 675 |
Jefferson Island Sidewalk |
Installation Of Sidewalk |
$500,000 to $1,000,000 |
0.43 |
Iberia |
2024-04-10 |
H.014830 |
LA 14, LA 674 |
La 14 At La 674 Int. Improvement |
Add Right Turn Lane and Widening |
$500,000 to $1,000,000 |
0.76 |
Iberia |
2024-06-12 |
H.009892 |
US 90 |
Us 90 Fr: Extension to La 329 |
Extend US 90 Frontage Road to La 329 |
$1,000,000 to $2,500,000 |
0.00 |
Iberia |
2024-06-12 |
H.010155 |
US 90 |
Us 90 Railroad Overpass Se Of La 85 |
Bridge Overpass Over Railroad |
$30,000,000 to $50,000,000 |
1.21 |
Iberia |
2024-06-12 |
H.012792 |
LA 675, US 90 |
La 675 @ Airport Rd Roundabout |
Roundabout |
$1,000,000 to $2,500,000 |
0.20 |
Iberia |
2024-06-12 |
H.013522 |
|
S Lewis St Widening |
Continuous Turn Lane |
$1,000,000 to $2,500,000 |
0.40 |
Iberia |
2024-06-12 |
H.015026 |
LA 87 |
La 87: La 3182 - 0.65 Mi Se Of La 3182 |
Mill, Patch, Asphalt Overlay, Drainage Improvements |
$500,000 to $1,000,000 |
0.64 |
Iberia |
2024-06-30 |
H.009862 |
|
Caroline St: Bnsf Xing (New Iberia) |
Close Crossing |
$0 to $100,000 |
0.01 |
Iberia |
2024-06-30 |
H.015722 |
|
Airport Blvd: Bnsf RR Xing(Iberia) |
Close Crossing |
$100,000 to $250,000 |
0.01 |
Iberia |
2024-07-10 |
H.007453 744-23-0007 |
LA 675 |
Hopkins Street Sidewalks, Phase II |
New Sidewalks |
$500,000 to $1,000,000 |
0.32 |
Iberia |
2024-07-10 |
H.011026 |
LA 182 |
La 182 Wb: Lasalle St. - Vine St. |
Drainage Structure Removal and Replacement, Roadway Work |
$500,000 to $1,000,000 |
0.30 |
Iberia |
2024-07-10 |
H.012627 |
LA 997 |
La 997: 2 Mi S Iberv Pl-3 Mi S Iberv Pl |
Roadway Embankment, Base Course, & Superpave Asphalt |
$1,000,000 to $2,500,000 |
1.00 |
Iberia |
2024-07-10 |
H.014278 |
LA 85 |
La 85: Patout & Drain Canal Bridges |
Bridge Replacement |
$500,000 to $1,000,000 |
0.15 |
Iberia |
2024-08-14 |
H.013140 |
|
Eighty Arpent Road Over Unnamed Coulee |
Bridge Replacement - No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Iberia |
2024-08-14 |
H.014833 |
US 90 |
Us 90 (Eb): La 83 - La 85 |
Mill & Overlay (Asphalt Section Only) |
$2,500,000 to $5,000,000 |
5.35 |
Iberia |
2024-09-11 |
H.014510 |
|
Iberia St Pavement Preserv and Bike Impr |
Rehabilitation Of Road Surface and Bike Improvements |
$500,000 to $1,000,000 |
1.39 |
Iberia, St. Martin |
2024-08-14 |
H.015270 |
US 90 |
Us 90 @ Aillet |
Uturn Signal Add Turn Lane and Signal Modification |
$250,000 to $500,000 |
0.28 |
Iberia, St. Martin |
2024-11-13 |
H.015617 |
LA 31 |
La 31: La 182 - 0.899 Mi S La 92 |
Patch, Mill, Asphalt Overlay |
$10,000,000 to $15,000,000 |
6.70 |
Iberville |
2023-12-13 |
H.014670 |
LA 1270 |
La1270: La77 to End Of Control Section |
Roadway Surface Treatment |
$1,000,000 to $2,500,000 |
0.50 |
Iberville |
2024-04-30 |
H.013438 |
|
Dorcy St: Up RR Xing (Iberville) |
Install Gates & Conc Surface On Dorcy |
$250,000 to $500,000 |
0.04 |
Iberville |
2024-06-12 |
H.013243 |
LA 997 |
Byu Pigeon Pontoon Br Elec Winches (Hbi) |
Movable Bridge Machinery Repairs |
$500,000 to $1,000,000 |
0.06 |
Iberville |
2024-06-30 |
H.012789 |
LA 74 |
La 74: Ic RR Preemption (St. Gabriel) |
Preempting 302-964m With Adjacent Traffic Signal |
$0 to $100,000 |
0.05 |
Iberville |
2024-07-10 |
H.013715 |
LA 1, LA 77 |
La 77: Up RR Xing (Iberville) |
Road Work & Upgrade Warning |
$500,000 to $1,000,000 |
0.18 |
Iberville |
2024-08-14 |
H.013968 |
LA 404 |
La 404: Bayou and Canal Bridges |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.46 |
Iberville |
2024-08-14 |
H.015440 |
LA 69 |
La 69: 0.5 Mi N Of La 404 - La 1 |
Pcc Patching, Clean & Reseal Joints |
$1,000,000 to $2,500,000 |
2.12 |
Iberville |
2024-08-23 |
H.012456 |
LA 77 |
La 77 Bank Repair At Bayou Plaquemine |
Repair Bayou Plaquemine Stream Erosion to Stabilize Roadway |
$5,000,000 to $7,500,000 |
1.00 |
Iberville |
2024-09-11 |
H.014837 |
LA 30 |
La 30: La 74 - Ebr P/L |
Patch, Mill, Overlay |
$1,000,000 to $2,500,000 |
3.76 |
Iberville |
2024-09-11 |
H.015636 |
I-10 |
I-10: Trinity Drainage Canal Br Repair |
Bridge Repair Due to Vehicle Impact |
$250,000 to $500,000 |
0.02 |
Iberville, St. Martin |
2023-12-20 |
H.015571 |
I-10 |
I-10: Atch Basin Speed Enforcement Ph 3 |
Install Speed Detection Cameras |
$10,000,000 to $15,000,000 |
0.80 |
Jackson |
2024-06-12 |
H.001553 068-02-0017 |
LA 4, LA 146 |
La 146 Bridges Near Kelleys |
New Bridges |
$7,500,000 to $10,000,000 |
6.85 |
Jackson |
2024-09-11 |
H.015322 |
LA 147 |
La 147: US 167 - Country Club Dr |
Thin Lift Overlay Inclusive Of Some Full Depth Patching |
$1,000,000 to $2,500,000 |
2.80 |
Jackson, Lincoln, Madison, Morehouse, Ouachita, Richland, Union, West Carroll |
2023-12-13 |
H.015594 |
LA 140, LA 139, LA 138, LA 134, US 80, LA 813-3, LA 609, LA 602-2, LA 602-1, LA 588, LA 563, LA 558, LA 557, LA 549, LA 544, LA 4, LA 34, LA 33, LA 2, L |
D05 Rumble Strips and Striping Ph 1 |
Installation Of Rumble Strips, Striping and Rpm's |
$5,000,000 to $7,500,000 |
179.97 |
Jefferson |
2024-01-10 |
H.014681 |
|
Nine Mile Point Rd: US 90 - La 18 |
Mill and Overlay |
$2,500,000 to $5,000,000 |
1.34 |
Jefferson |
2024-02-14 |
H.002264 249-90-0041 |
LA 302-P, LA 45, LA 3257 |
La 302: Bayou Barataria Mb Repl Phase 2 |
Bridge Repl.(Kerner's) |
$10,000,000 to $15,000,000 |
0.93 |
Jefferson |
2024-02-14 |
H.009794 |
I-910, LA 466, LA 18 |
Gretna Bicycle Access Improvements |
Signing, Pavement Markings, M/U Path & Related Work |
$250,000 to $500,000 |
0.39 |
Jefferson |
2024-02-14 |
H.012012 |
|
Ridgewood/Stroelitz (Airline to Loumor) |
Concrete Overlay |
$2,500,000 to $5,000,000 |
0.00 |
Jefferson |
2024-03-13 |
H.002956 430-01-0020 |
LA 3139 |
Earhart At Dakin |
Ramp Connector (Eb Earhart - Dakin) |
$2,500,000 to $5,000,000 |
0.01 |
Jefferson |
2024-03-13 |
H.015004 |
LA 3139 |
La 3139: Eb Ramp Ov La 3152 Nb Repair |
Repair Of Pretressed Concrete Girders |
$500,000 to $1,000,000 |
0.17 |
Jefferson |
2024-03-30 |
H.009884 |
|
Several Nogc Xings(Gretna) |
Rr Crossing Enhancement |
$250,000 to $500,000 |
0.01 |
Jefferson |
2024-04-10 |
H.007181 742-26-0043 |
|
L&a Road Improvements |
New Roadway and Alignment |
$2,500,000 to $5,000,000 |
0.00 |
Jefferson |
2024-05-08 |
H.012885 |
LA 466 |
La 466: 5th St Improvements (Gretna) |
Bike Lanes, Multi-use Paths, Ada Sidewalks |
$2,500,000 to $5,000,000 |
0.57 |
Jefferson |
2024-05-31 |
H.013825 |
|
Nopb RR Xings (Jefferson Parish) |
Install RR Active Warning |
$250,000 to $500,000 |
0.02 |
Jefferson |
2024-06-12 |
H.011805 |
LA 541 |
Jefferson Wb Miss River Mu Path 3b & 3c |
Multi-use Path |
$500,000 to $1,000,000 |
0.23 |
Jefferson |
2024-06-12 |
H.015578 |
I-10 |
I-10 @ Oaklawn Overpass |
Epoxy- Urethane Overlay |
$2,500,000 to $5,000,000 |
0.31 |
Jefferson |
2024-07-10 |
H.012594 |
LA 3134 |
La 3134: Intersection Imp @ La 45 |
Add J Turns & U Turns At the Intersection Of La 3134 & La 45 |
$100,000 to $250,000 |
0.28 |
Jefferson |
2024-07-10 |
H.012978 |
LA 301 |
La 301: 280' W Mcmurty - La 45 |
Milling and Overlay |
$500,000 to $1,000,000 |
2.98 |
Jefferson |
2024-07-10 |
H.014625 |
|
Terry Parkway: La23 - U.S. 90b |
Roadway Reconstruction |
$500,000 to $1,000,000 |
2.81 |
Jefferson |
2024-07-10 |
H.014759 |
LA 3152 |
La 3152: Left Turn Lane @ Village East |
Add an Additional Left Turn Lane On La 3152 At Village East |
$100,000 to $250,000 |
0.07 |
Jefferson |
2024-07-31 |
H.015653 |
|
Bucktown Harbor Levee Crossing Trail |
Construction Of a Trail Ramp Over Lake Ponchatrain Levee |
$250,000 to $500,000 |
0.05 |
Jefferson |
2024-08-14 |
H.014334 |
|
Bonnabel Blvd: Metairie Rd - I-10 |
Overlay |
$1,000,000 to $2,500,000 |
0.74 |
Jefferson |
2024-09-11 |
H.013370 |
LA 48 |
La 48: Kenner Levee Trailhead Expansion |
Sidewalks, Bicycle Facilities, Landscaping and Bus Shelters |
$250,000 to $500,000 |
0.06 |
Jefferson |
2024-09-30 |
H.014910 |
|
Central Ave: Nopb RR Xings (Jefferson) |
Upgrade Warning For the Crossings |
$100,000 to $250,000 |
0.11 |
Jefferson |
2024-11-13 |
H.014316 |
|
Lapalco Blvd:tanglewood to Victory Ph 2 |
Widen to 4 Lanes |
$10,000,000 to $15,000,000 |
0.63 |
Jefferson |
2024-11-13 |
H.014682 |
|
Veterans Blvd: David Dr - Clearview Pkwy |
Mill and Overlay |
$1,000,000 to $2,500,000 |
2.14 |
Jefferson |
2024-11-13 |
H.015120 |
|
Roosevelt Blvd: W Napoleon - W Metairie |
Reconstruct Pavement and Base Of Roosevelt Blvd |
$2,500,000 to $5,000,000 |
1.10 |
Jefferson Davis |
2023-12-13 |
H.015358 |
US 90, LA 97 |
Us 90 & La 97: Asphalt Overlays |
Asphalt,Pcc Patching,Mill,Overlay,Adj Man Holes,Pcc Curb Rep |
$1,000,000 to $2,500,000 |
1.82 |
Jefferson Davis |
2024-03-13 |
H.014235 |
|
West Racca Rd Over E Grand Marais Ditch |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.02 |
Jefferson Davis |
2024-04-10 |
H.014287 |
I-10 |
I-10: La 99 (Welsh) Intchg Lighting |
Replacement Of an Existing Interstate Lighting System |
$1,000,000 to $2,500,000 |
0.80 |
Jefferson Davis |
2024-04-10 |
H.015088 |
US 190 |
Us 190 @ La 26 Signalization |
Traffic Signals |
$500,000 to $1,000,000 |
0.01 |
Jefferson Davis |
2024-08-14 |
H.015287 |
LA 3166 |
La 3166: La 1126 - Castex Landing |
Thin Overlay |
$250,000 to $500,000 |
1.82 |
Jefferson Davis |
2024-09-11 |
H.015288 |
LA 1130 |
La 1130: US 190 - La 26 |
Thin Overlay |
$250,000 to $500,000 |
1.49 |
Jefferson, Lafourche, Terrebonne |
2024-01-10 |
H.015296 |
I-910, US 90, LA 56 |
District 02 Appr Slab Leveling Phase 4 |
Approach Slab Leveling With Asphalt Concrete |
$500,000 to $1,000,000 |
0.24 |
Jefferson, Orleans |
2024-09-11 |
H.015069 |
LA 428 |
La 428: Gen Degaulle Dr - Industry Canal |
Mill and Overlay Of Asphalt Roadway |
$2,500,000 to $5,000,000 |
2.68 |
Lafayette |
2023-12-13 |
H.013517 |
|
E St Peter St and N Church St Sidewalks |
Sidewalks |
$1,000,000 to $2,500,000 |
0.80 |
Lafayette |
2024-03-13 |
H.012867 |
|
S Larriviere Rd: La 92 - Chemin Metairie |
Add Center Turn Lane |
$1,000,000 to $2,500,000 |
1.20 |
Lafayette |
2024-05-08 |
H.014554 |
LA 3025 |
La 3025: Coulee Mine Scour Repair |
Scour Repair - Geotextile Fabric and Rip Rap |
$100,000 to $250,000 |
0.21 |
Lafayette |
2024-06-12 |
H.012866 |
LA 3025 |
South College Rd (La 3025) Sidewalks |
Construct Sidewalks |
$500,000 to $1,000,000 |
1.63 |
Lafayette |
2024-06-12 |
H.012868 |
|
Fortune Road Pavement Preservation |
Overlay |
$1,000,000 to $2,500,000 |
1.12 |
Lafayette |
2024-06-12 |
H.012914 |
LA 3073 |
La 3073: Ambassador @ Verot-chemin-bonin |
Extending Turn Lanes |
$1,000,000 to $2,500,000 |
1.35 |
Lafayette |
2024-07-10 |
H.009997 |
US 167 |
Us 167: Johnston St Improvements |
Access Management and Other Safety Countermeasures |
$7,500,000 to $10,000,000 |
0.99 |
Lafayette |
2024-07-10 |
H.013716 |
US 167 |
Us 167: Camellia Blvd-churchill Dr (Laf) |
Install Sidewalks, Handicapped Curb Ramps, Retaining Wall |
$250,000 to $500,000 |
0.17 |
Lafayette |
2024-07-10 |
H.014842 |
LA 3184 |
La 3184: La 3025 - I-10 |
Concrete Pavement Rehab, Asphalt Shoulders & Related Work |
$2,500,000 to $5,000,000 |
2.28 |
Lafayette |
2024-08-08 |
H.015372 |
US 167 |
Us 167 Interchange @ Willow Street |
Elevated Freeway Over Willow Street Using Concrete Segmental |
$300,000,000 to $350,000,000 |
3.24 |
Lafayette |
2024-08-14 |
H.014337 |
|
Acadian Hills Lane Over Drainage Canal |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Lafayette |
2024-09-11 |
H.014509 |
|
Doucet Rd Sidewalks |
Add Sidewalks and Striped Crosswalks |
$1,000,000 to $2,500,000 |
0.89 |
Lafayette |
2024-09-11 |
H.015053 |
LA 3298 |
Youngsville City Streets: Rehab/Drainage |
Repair Local Roads and Drainage Improvements (Former La 92) |
$1,000,000 to $2,500,000 |
2.98 |
Lafayette |
2024-10-09 |
H.011992 |
LA 343 |
La 343: Bayou Queue De Tortue Bridge |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.10 |
Lafayette |
2024-10-09 |
H.012864 |
LA 94 |
La 94/Carmel Drive Sidewalks |
Construction Of Sidewalks |
$500,000 to $1,000,000 |
1.44 |
Lafayette |
2024-10-09 |
H.014483 |
US 90 |
Us 90: Scott C/L ? (Former) La 182 |
Patch, Mill, and Overlay |
$2,500,000 to $5,000,000 |
2.19 |
Lafayette |
2024-10-09 |
H.015386 |
|
Lafayette Parish Fya (Lcg) |
Flashing Yellow Arrows and Signal Back Plates |
$2,500,000 to $5,000,000 |
0.00 |
Lafayette |
2024-11-13 |
H.012869 |
LA 182, LA 723 |
La 182(Univ) @ La 723(Renaud) Roundabout |
Roundabout |
$2,500,000 to $5,000,000 |
0.06 |
Lafayette, St. Martin |
2024-05-08 |
H.014560 |
LA 94 |
La 94: Vermilion River Bridge Repl. |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.28 |
Lafourche |
2023-12-05 |
H.015751 |
LA 1 |
La 1 Culvert Repair At Log Mile 2.344 |
Culvert Repair |
$0 to $100,000 |
0.00 |
Lafourche |
2023-12-05 |
H.015760 |
LA 316 |
La 316: Culvert Replacement At Ferry Rd |
Replacing a 48" Cmp Culvert |
$0 to $100,000 |
0.00 |
Lafourche |
2023-12-13 |
H.013403 |
LA 304, LA 20 |
La 20 & La 304 Sidewalk Imp (Chackbay) |
Ada Sidewalks |
$250,000 to $500,000 |
1.41 |
Lafourche |
2024-02-14 |
H.013269 |
|
Audubon Ave Ovly:la 1 to Terrebonne P/L |
Asphalt Overlay |
$1,000,000 to $2,500,000 |
1.44 |
Lafourche |
2024-02-14 |
H.013429 |
|
Downtown Thibodaux Sidewalks |
Enhancements - Upgrade Sidewalks to Ada |
$250,000 to $500,000 |
1.37 |
Lafourche |
2024-02-14 |
H.014924 |
LA 308 |
La 308: Bartley Ln to Laurel Valley Rd |
Shoulder Widening and Curve Signs |
$1,000,000 to $2,500,000 |
1.98 |
Lafourche |
2024-02-14 |
H.015579 |
LA 20 |
La 20 @ St. Patrick St Intersection Imp |
Turn Lane and Bulb Out Addition to Roadway |
$250,000 to $500,000 |
0.28 |
Lafourche |
2024-04-10 |
H.015857 |
LA 20, LA 1 |
La 1 & La 20 @ St Patrick Bridge Ped Imp |
Ada Compliant Sidewalks and Curb Ramps |
$0 to $100,000 |
0.07 |
Lafourche |
2024-07-10 |
H.014270 |
|
Lefort Bypass Road Over Cut Off Bayou |
Bridge Replacement, No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Lafourche |
2024-07-10 |
H.015752 |
LA 308 |
La 308: La 657 - T Bois Bridge |
Patching |
$250,000 to $500,000 |
1.94 |
Lafourche |
2024-07-10 |
H.015773 |
LA 652 |
La 652: La 182 - Bayou Cutoff Br |
Mill and Overlay |
$100,000 to $250,000 |
0.31 |
Lafourche, Terrebonne |
2023-12-05 |
H.015770 |
LA 3040, LA 311, LA 3087, LA 661, LA 316, LA 315 |
D02 Painted Traffic Striping 2023 |
Repainting Striping and Replacement Of Pavement Markings |
$0 to $100,000 |
4.94 |
Lafourche, Terrebonne |
2023-12-13 |
H.015035 |
LA 24, LA 316 |
La24&316 Mb Rprs(Presq is & B.Blue)(Hbi) |
Architectural, Electrical and Mechanical |
$500,000 to $1,000,000 |
0.08 |
LaSalle |
2024-03-13 |
H.015613 |
US 84 |
Us 84: Up RR Overpass Replacement (Hbi) |
Replacement Of Existing RR Overpass With New Bridge |
$10,000,000 to $15,000,000 |
0.54 |
LaSalle |
2024-06-30 |
H.001853 125-03-0031 |
LA 127 |
Up Several RR Xings (Olla) |
Upgrade RR Signals, Close Crossing, Improve Approach |
$100,000 to $250,000 |
0.04 |
LaSalle, Winn |
2024-11-13 |
H.012048 |
US 84 |
Us 84: Castor Creek and Relief Bridges |
Bridge Replacements |
$30,000,000 to $50,000,000 |
0.91 |
Lincoln |
2023-12-13 |
H.014781 |
US 80 |
Us 80: Walker Rd - Ouachita P/L |
Patch, Mill and Overlay |
$5,000,000 to $7,500,000 |
5.00 |
Lincoln |
2024-03-31 |
H.009871 |
|
Woodland Dr: Kcs Xing (Simsboro) |
Close RR Crossing |
$100,000 to $250,000 |
0.01 |
Lincoln |
2024-04-10 |
H.013720 |
|
Bonner St Bridge Ped Impr (Ruston) |
Ped Impr (Ramps, Signs, Striping, Ped Lighting) |
$500,000 to $1,000,000 |
0.68 |
Lincoln |
2024-05-08 |
H.015232 |
LA 146 |
La 146: Drainage Improvements |
Asphalt Lifts to Raise Roadway & Re-establish Exist. Ditches |
$250,000 to $500,000 |
0.25 |
Lincoln |
2024-06-12 |
H.015233 |
LA 823 |
La 823: Drainage Improvements |
Asphalt Lifts to Raise Roadway & Re-establish Exist. Ditches |
$250,000 to $500,000 |
0.13 |
Lincoln |
2024-06-12 |
H.015295 |
LA 818 |
La 818: US 80 - La 3012 |
Patch and Overlay |
$1,000,000 to $2,500,000 |
1.27 |
Lincoln |
2024-08-13 |
H.015060 |
LA 819-2, LA 819-1, LA 819-5, LA 819-4, LA 819-3 |
La 819: Choudrant Rt |
Provide $257,569 In Funds to the Village Of Choudrant |
$250,000 to $500,000 |
0.58 |
Lincoln |
2024-08-14 |
H.015059 |
LA 819-1, LA 819-3, LA 819-2, LA 819-5, LA 819-4 |
La 819 Repairs: Choudrant |
Patch and Overlay For Transfer to Choudrant |
$100,000 to $250,000 |
0.51 |
Lincoln |
2024-09-11 |
H.015471 |
|
E. Kentucky Ave: Goodwin to La 33 |
Reconst Pavement, Add Center Turn Lane, Subsurface Drainage |
$7,500,000 to $10,000,000 |
1.16 |
Lincoln, Madison |
2024-03-13 |
H.015418 |
I-20 |
I-20:lincoln/Madison Parish Tree Removal |
Tree Clearing |
$2,500,000 to $5,000,000 |
44.34 |
Livingston |
2023-12-13 |
H.015092 |
LA 22 |
La 22: Amite River Mb Repair (Clio) |
Electrical |
$0 to $100,000 |
0.09 |
Livingston |
2024-06-12 |
H.012622 |
I-12 |
I-12:livingston Par Approach Slab Rep P3 |
Replace 2 Existing Ppc Girder Brs W/2 New Ppc Girder Brs |
$15,000,000 to $20,000,000 |
1.60 |
Livingston |
2024-07-10 |
H.015355 |
|
W Colyell Bridge Replacement |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.00 |
Livingston |
2024-07-10 |
H.015363 |
LA 1029 |
La 1029: US 190 - La 447 |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
1.58 |
Livingston |
2024-08-14 |
H.015102 |
|
Centerville St Nw Improvements |
Mill and Overlay Centerville St Nw and Add Bike Lanes |
$500,000 to $1,000,000 |
0.27 |
Livingston |
2024-08-14 |
H.015163 |
|
Aydell Lane Bridge Replacement |
Replace Aydell Ln Structure W/ Box Culvert/Concrete Bridge |
$500,000 to $1,000,000 |
0.02 |
Livingston |
2024-09-11 |
H.014058 |
LA 16 |
La 16: Curve Realignment At Gourdon Lane |
Curve Realignment |
$1,000,000 to $2,500,000 |
0.40 |
Livingston |
2024-10-09 |
H.011520 |
LA 1019 |
La 1019: La 16-calmes Rd Drainage |
Remove and Replace Pipes, Catch Basins, And/Or Asphalt |
$250,000 to $500,000 |
0.50 |
Livingston, St. Helena |
2024-06-12 |
H.015690 |
LA 1025, LA 16, LA 1026 |
Dist 62: Raised Rumble Strips Evaluation |
Pavement Striping and Raised Pavement Markers |
$250,000 to $500,000 |
23.24 |
Livingston, St. Tammany, Tangipahoa |
2024-04-10 |
H.015691 |
LA 40, LA 16, LA 1077 |
Dist 62: Wet Reflective Pave Mark Eval |
Pavement Striping and Raised Pavement Markers |
$250,000 to $500,000 |
9.74 |
Madison |
2023-12-13 |
H.011446 |
|
Mound Rest Area Renovations |
Rest Area Renovation |
$15,000,000 to $20,000,000 |
0.00 |
Madison |
2024-06-12 |
H.015323 |
LA 577 |
La 577: Joe's Bayou Rd - 1500 Ft N I-20 |
Major PCCP Patching and Rehabilitation Of Asphalt Shoulders |
$1,000,000 to $2,500,000 |
0.63 |
Madison |
2024-06-12 |
H.015826 |
I-20 |
I-20: Miss. River Br. Repair @ Vicksburg |
Bridge Jacking and Repair |
$500,000 to $1,000,000 |
2.08 |
Morehouse |
2024-06-30 |
H.014904 |
US 425 |
Us 425: Up 2021 RR Xing (Mer Rouge) |
Improve/Upgrade Approaches |
$250,000 to $500,000 |
0.02 |
Natchitoches |
2024-01-04 |
H.015707 |
I-49 |
I-49: Maintenance Patching |
Replace Failed PCCP |
$100,000 to $250,000 |
0.42 |
Natchitoches |
2024-03-13 |
H.015360 |
I-49 |
I-49: Nb & Sb Slope Repair |
Embankment Repair |
$10,000,000 to $15,000,000 |
3.18 |
Natchitoches |
2024-03-31 |
H.015071 |
LA 6 |
La 6: Kcs RR Xing (Clarence) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
Natchitoches |
2024-06-12 |
H.012307 |
LA 6 |
La 6:install U-turn Lanes West Of I-49 |
Construct a Pair Of U-turn Lanes With Median Improvements |
$2,500,000 to $5,000,000 |
0.53 |
Natchitoches |
2024-06-12 |
H.015125 |
LA 495 |
La 495: Slide and Roadway Repair |
Curve Realignment |
$1,000,000 to $2,500,000 |
1.36 |
Natchitoches |
2024-07-10 |
H.010343 |
LA 174 |
La 174: Desoto P/L - I-49 Interchange |
Base & Overlay |
$2,500,000 to $5,000,000 |
5.01 |
Natchitoches |
2024-07-10 |
H.010359 |
LA 9 |
La 9: US 71 - La 156 |
Med Overlay |
$2,500,000 to $5,000,000 |
7.01 |
Natchitoches |
2024-07-10 |
H.014121 |
LA 480 |
La 480: US 71 to La 486 |
Mill, In Place Base Rehab. and Overlay |
$250,000 to $500,000 |
0.75 |
Natchitoches |
2024-08-14 |
H.015329 |
LA 1 |
La 1: La 6 - Johnson Chute Road |
Rubblize and Overlay |
$2,500,000 to $5,000,000 |
5.07 |
Natchitoches, Winn |
2024-04-10 |
H.000382 009-04-0010 |
US 71 |
Us 71: Bridges Near St. Maurice |
Bridge Replacement |
$20,000,000 to $30,000,000 |
1.04 |
Orleans |
2023-12-13 |
H.015504 |
I-910 |
Ccc Decorative Lighting |
Decorative Lighting On Ccc |
$15,000,000 to $20,000,000 |
0.57 |
Orleans |
2024-02-14 |
H.015612 |
LA 1264 |
La 1264: Ihnc Mb Repair (Ted Hickey) |
Improve Condition Of Deteriorated Nw Trunnion Column Pair |
$250,000 to $500,000 |
0.36 |
Orleans |
2024-03-13 |
H.012370 |
|
Morrison Rd: Mayo Ave - ¦bullard Ave |
Preservation Asphalt Overlay and Related Ada Curb Work |
$10,000,000 to $15,000,000 |
3.34 |
Orleans |
2024-04-10 |
H.014530 |
|
Almonaster Avenue Bridge Rehabilitation |
Movable Bridge Rehabilitation |
$20,000,000 to $30,000,000 |
0.39 |
Orleans |
2024-05-08 |
H.013094 |
US 90 |
Broad St - Read Blvd Ped Improvements |
Sidewalks, Multiuse Paths, Ramps, Ped Signals, Striping |
$1,000,000 to $2,500,000 |
1.01 |
Orleans |
2024-05-08 |
H.014886 |
US 90 |
Us 90: Tulane Ave - Danziger Br |
Mill and Overlay Of Asphalt Pavement |
$7,500,000 to $10,000,000 |
5.02 |
Orleans |
2024-05-08 |
H.015686 |
US 90 |
Us90:ihnc Mb Traffic Gates Rh (Danziger) |
Replacement Of Traffic Gates (Structural & Electrical) |
$100,000 to $250,000 |
0.61 |
Orleans |
2024-06-12 |
H.014752 |
LA 46, LA 3021 |
La 3021: Dual Turn Lanes @ La 39 |
Add Dual Left Turn Lanes From La 3021 to La 39 |
$500,000 to $1,000,000 |
0.16 |
Orleans |
2024-07-10 |
H.010331 |
US 90 |
Us 90: Floodwall - Victory Rd |
Installation Of Drainage Structures |
$1,000,000 to $2,500,000 |
0.83 |
Orleans, St. Charles, Terrebonne |
2023-12-05 |
H.015771 |
I-610, US 90, LA 631 |
D02 Bridge Rail Repair 2023 |
Repair Damaged Bridge Rails |
$100,000 to $250,000 |
0.00 |
Ouachita |
2024-01-10 |
H.013392 |
|
Mane Street Rehabilitation Phase 2 |
Mill and Overlay |
$1,000,000 to $2,500,000 |
0.60 |
Ouachita |
2024-01-10 |
H.014232 |
|
Ruffin Drive Over Drain to Youngs Bayou |
Bridge Replacement No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Ouachita |
2024-01-10 |
H.014295 |
US 165, LA 139 |
Us165&la139 Prep to Stop Beacons(Ouach) |
Signal Modification/Upgrade |
$500,000 to $1,000,000 |
3.26 |
Ouachita |
2024-03-13 |
H.013130 |
|
Red Cut Rd & Charles Rawls Rd Bridges |
Bridge Replacement - No New Alignment |
$1,000,000 to $2,500,000 |
0.03 |
Ouachita |
2024-05-08 |
H.007300 742-37-0028 |
I-20, LA 594 |
Kansas Lane-garrett Rd Connector |
Rd Connector & Interchange Imprvmnt |
$30,000,000 to $50,000,000 |
2.16 |
Ouachita |
2024-05-08 |
H.014646 |
I-20 |
I-20: US 165 - E. Of Garrett Rd |
Asphalt Widening and Overlay |
$15,000,000 to $20,000,000 |
2.00 |
Ouachita |
2024-06-12 |
H.013122 |
|
Pine St. & Harrison/Collier Bridges |
Bridge Replacement - No New Alignment |
$500,000 to $1,000,000 |
0.01 |
Ouachita |
2024-06-12 |
H.015265 |
US 165 |
Us 165: Int. Imp. Near Medical Park Dr |
Add Turn Lanes, Remove Crossovers |
$500,000 to $1,000,000 |
0.82 |
Ouachita |
2024-06-30 |
H.012439 |
LA 151 |
Kcs Several RR Xings (Ouachita) |
Rr Signalization |
$500,000 to $1,000,000 |
0.04 |
Ouachita |
2024-07-10 |
H.007528 744-37-0016 |
US 80 |
Us 80:6th St-lamy Ln Streetscaping |
New Sidewalks and Sidewalk Lighting |
$1,000,000 to $2,500,000 |
1.65 |
Ouachita |
2024-07-10 |
H.007530 744-37-0018 |
US 165-Y |
Jackson Street Corridor Enhancement |
New Sidewalks and Sidewalk Lighting |
$1,000,000 to $2,500,000 |
1.02 |
Ouachita |
2024-07-10 |
H.015303 |
LA 143 |
La 143: US 80 - Ridgedale Dr |
Pccp Patching |
$1,000,000 to $2,500,000 |
0.64 |
Ouachita |
2024-08-14 |
H.014108 |
US 165 |
Us 165: Rilla - La 15 |
Mill and Overlay |
$2,500,000 to $5,000,000 |
4.59 |
Ouachita |
2024-10-09 |
H.014398 |
|
Caples Road: Marion Sims Rd - La 3033 |
Rehabilitation |
$1,000,000 to $2,500,000 |
2.31 |
Ouachita |
2024-10-09 |
H.014679 |
|
Kiroli Rd Sidewalks and Striping |
Repair/Widen Sidewalks and Restriping Kiroli Rd |
$250,000 to $500,000 |
1.06 |
Ouachita |
2024-11-13 |
H.014851 |
US 80 |
Us 80: 670 Ft W La 3249 - La 617 |
Mill, Patch and Overlay |
$1,000,000 to $2,500,000 |
2.23 |
Plaquemines |
2023-12-05 |
H.015749 |
LA 23 |
La 23: Sarah Dr - L.M. 3.368 |
1.5" Avg Mill and 2" Overlay Above Cracks and Dips |
$100,000 to $250,000 |
12.73 |
Plaquemines |
2024-02-14 |
H.015020 |
LA 39 |
La 39 Raising At Caernarvon Levee |
Raise Roadway Grade Of La 39 |
$1,000,000 to $2,500,000 |
0.31 |
Plaquemines |
2024-06-30 |
H.015891 |
|
Kenneth & E 3rd St: Nogc Xs(Belle Chase) |
Rr Mast Flashers |
$250,000 to $500,000 |
0.02 |
Pointe Coupee |
2024-02-14 |
H.015441 |
LA 1 |
La 1: S Jct La 1 - N Jct La 1 |
Patching, Milling, Asphalt Overlay, Drainage Works |
$1,000,000 to $2,500,000 |
1.78 |
Pointe Coupee |
2024-06-12 |
H.012061 |
LA 1 |
La 1: Byu Moreau and Lateral W15#7a Brs |
Bridge Replacement |
$5,000,000 to $7,500,000 |
1.80 |
Pointe Coupee |
2024-07-10 |
H.015263 |
LA 10 |
La 10 Roadway Flooding: 0.2 Mi W Of La 1 |
Raise Roadway Elevation to Prevent Flooding |
$250,000 to $500,000 |
0.17 |
Pointe Coupee, West Baton Rouge |
2024-11-30 |
H.015133 |
LA 416, LA 985 |
La 416 & La 985: Kcs Xings(District 61) |
Upgrade RR Signals |
$500,000 to $1,000,000 |
0.04 |
Rapides |
2023-12-13 |
H.015314 |
LA 1, I-49 |
La 1: Rapides Station - I-49 Bridge |
Patch, Mill & Overlay |
$2,500,000 to $5,000,000 |
1.12 |
Rapides |
2024-01-10 |
H.014647 |
|
Elliott St. Rehab: Macarthur Dr to I-49 |
Roadway Reconstruction |
$2,500,000 to $5,000,000 |
2.00 |
Rapides |
2024-01-10 |
H.015266 |
LA 28 |
La 28: R-cut At St Clair Rd |
Add an R-cut At St Claire Intersection and U Turn Lanes |
$1,000,000 to $2,500,000 |
0.44 |
Rapides |
2024-06-30 |
H.015124 |
LA 116, US 165 |
Pardue Rd, Us165 & La116 Xings (Rapides) |
Upgrade Signs & Remove 2 Crossings |
$100,000 to $250,000 |
0.03 |
Rapides |
2024-07-10 |
H.012935 |
LA 121 |
La 121: La 112 to La 28- Ast |
Asphaltic Surface Treatment |
$500,000 to $1,000,000 |
3.49 |
Rapides |
2024-07-10 |
H.014255 |
|
Beeson Road Over Flagon Bayou Tributary |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.02 |
Rapides |
2024-07-10 |
H.014261 |
|
Doshie Road Over Cherry Winche Crk Trib |
Bridge Replacement No New Alignment |
$500,000 to $1,000,000 |
0.03 |
Rapides |
2024-07-10 |
H.014891 |
LA 1207 |
La 1207: La 115 to La 28 |
Thin Overlay |
$1,000,000 to $2,500,000 |
4.65 |
Rapides |
2024-07-10 |
H.015279 |
LA 1254 |
La 1254: E Of US 167 R/W - US 165 |
Base & Overlay |
$250,000 to $500,000 |
0.47 |
Rapides |
2024-08-14 |
H.015281 |
LA 3250 |
La 3250: US 71 - La 1208-4 |
Patch, Mill & Overlay |
$100,000 to $250,000 |
0.41 |
Rapides |
2024-09-11 |
H.011504 |
US 71, US 167 |
Alexandria ITS Phase 2 |
Installing Bridge Advisories, Cctvs, and Dmss |
$1,000,000 to $2,500,000 |
6.73 |
Rapides |
2024-09-11 |
H.015119 |
US 71 |
Us 71: Uprr Overpass Clr Adjustment |
Raise Structure to Provide Appropriate Clearance |
$1,000,000 to $2,500,000 |
0.18 |
Rapides |
2024-10-09 |
H.011597 |
LA 8 |
La 8: Vernon Parish Line to La 119 |
Base & Overlay |
$2,500,000 to $5,000,000 |
6.13 |
Rapides |
2024-11-13 |
H.015272 |
US 165 |
Us 165: Intersection Improvements |
Add and Improve Turn Lanes |
$500,000 to $1,000,000 |
0.35 |
Rapides |
2024-11-13 |
H.015476 |
|
Foisy Street Reconstruction |
Remove Brick and Reconstruct With Pcc |
$2,500,000 to $5,000,000 |
0.40 |
Red River |
2024-03-13 |
H.015274 |
US 71 |
Us 71: US 371 - La 515 |
Mill, Patch and Overlay |
$1,000,000 to $2,500,000 |
5.39 |
Red River |
2024-03-21 |
H.015072 |
US 84 |
Us 84: Up RR Xing (Red River) |
Replace Railroad Crossing Surface |
$100,000 to $250,000 |
0.01 |
Red River |
2024-06-12 |
H.011087 |
|
Westdale Plantation Road / Bayou Pierre |
Bridge Replacement |
$2,500,000 to $5,000,000 |
0.03 |
Red River |
2024-06-30 |
H.015199 |
|
Jones St: Kcs Xing (Coushatta) |
Close Crossing |
$100,000 to $250,000 |
0.02 |
Red River |
2024-09-11 |
H.015775 |
LA 515 |
La 515: US 71 - La 514 |
Thin Overlay |
$1,000,000 to $2,500,000 |
6.09 |
Richland |
2024-06-30 |
H.015229 |
|
Sumlin Ranch Rd: Kcs Xing(Richland) |
Close Or Upgrade Crossing |
$250,000 to $500,000 |
0.01 |
Richland |
2024-08-14 |
H.014811 |
LA 133 |
La 133: La 15 - US 80 |
Mill, In-place Rehab. & Overlay |
$2,500,000 to $5,000,000 |
8.26 |
Richland |
2024-10-09 |
H.011603 |
LA 132 |
La 132: La 135 to US 425 |
Patch Mill and Single Lift Overlay |
$1,000,000 to $2,500,000 |
5.68 |
Sabine |
2023-12-13 |
H.010345 |
LA 175 |
La 175: N Jct La 120 - Ray Canto Rd |
Stabilize and Overlay |
$2,500,000 to $5,000,000 |
3.46 |
Sabine |
2024-07-10 |
H.014093 |
LA 6 |
La 6: US 171 to Natchitoches P.L. |
Mill and Overlay |
$10,000,000 to $15,000,000 |
11.76 |
Sabine |
2024-08-14 |
H.015305 |
LA 191 |
La 191: La 476 North - La 1215 |
Asphalt Surface Treatment |
$500,000 to $1,000,000 |
12.38 |
Sabine |
2024-11-13 |
H.015328 |
LA 120 |
La 120: US 171 - Angela Lane |
In Place Stabilization and Overlay |
$1,000,000 to $2,500,000 |
1.82 |
St. Bernard |
2024-01-10 |
H.012752 |
LA 46 |
La 46 @ Weinberger Rd Intersection |
Intersection Improvement |
$1,000,000 to $2,500,000 |
0.57 |
St. Bernard |
2024-01-10 |
H.014049 |
LA 39, LA 47 |
St Bernard Pedestrian Improvements |
Signing, Striping, Signal, Crosswalk Improvements |
$500,000 to $1,000,000 |
0.64 |
St. Bernard |
2024-06-12 |
H.015797 |
LA 46 |
La 46: Webster St.-la 39 & La 39-la 300 |
Asphalt Patching and Striping |
$500,000 to $1,000,000 |
12.70 |
St. Bernard |
2024-07-10 |
H.013936 |
|
40 Arpent Trail Bike/Pedestrian Bridge |
Grade Separation Trail - Bike/Ped Bridge |
$2,500,000 to $5,000,000 |
0.00 |
St. Bernard |
2024-10-09 |
H.012891 |
LA 300 |
La 300: Bayou Laloutre Bridge |
Bridge Replacement |
$500,000 to $1,000,000 |
0.20 |
St. Bernard |
2024-11-13 |
H.015768 |
LA 300 |
La 300: La 39 - Asevado Rd |
Patch, Mill and Overlay |
$500,000 to $1,000,000 |
0.79 |
St. Charles |
2024-03-13 |
H.014899 |
I-10 |
I-10: Bonnet Carre Spillway Emer Re Ph 2 |
Repair/Replace Bridge Section Damaged By Fire |
$2,500,000 to $5,000,000 |
0.50 |
St. Charles |
2024-04-10 |
H.014050 |
|
Willowdale Blvd: US 90 - E. Heather Dr. |
Pavement Rehab, Turn Lane |
$250,000 to $500,000 |
1.15 |
St. Helena |
2024-07-10 |
H.014123 |
LA 1043 |
La 1043: La 10 - La 43 |
Mill & Overlay |
$2,500,000 to $5,000,000 |
7.46 |
St. Helena |
2024-07-10 |
H.014141 |
LA 43 |
La 43: Drainage Improvements |
Addition Of Cross Drain and Upsizing Culverts |
$0 to $100,000 |
0.50 |
St. Helena |
2024-07-10 |
H.015361 |
LA 16 |
La 16: Sawmill Rd - Tangipahoa P/L |
In Place Stabilize Base and Overlay |
$1,000,000 to $2,500,000 |
1.67 |
St. James |
2023-12-13 |
H.015637 |
LA 20 |
La 20: Bayou Chevreuil Br Replacement |
Replace Codekg Bridge With New Ppc Girder Bridge |
$15,000,000 to $20,000,000 |
0.44 |
St. James |
2024-04-10 |
H.015558 |
LA 44 |
La 44: La 3274 - 0.5 Mi W Of La 642 |
Patching, Milling, Asphalt Overlay |
$1,000,000 to $2,500,000 |
4.35 |
St. James |
2024-04-10 |
H.015603 |
LA 641 |
La 641: La 641 Over I-10 Bridge Repair |
Repair Of Bridge Damage Due to Over Height Truck |
$500,000 to $1,000,000 |
0.43 |
St. James |
2024-06-12 |
H.014416 |
LA 3125, LA 641, LA 3274 |
La 3125 @ La 3274 Roundabout |
Construct a Roundabout |
$10,000,000 to $15,000,000 |
1.15 |
St. James |
2024-07-31 |
H.014469 |
|
Hester,Joe Accardo,Kahn:ic Xings(Hester) |
Install F/L's and Gates, Close One Crossing |
$250,000 to $500,000 |
0.05 |
St. John Baptist |
2023-12-13 |
H.013239 |
US 61 |
Highway 61 Streetscape Improvements |
Bike/Ped Improvements |
$2,500,000 to $5,000,000 |
0.77 |
St. John Baptist |
2024-02-14 |
H.011515 |
LA 44 |
La 44: Palm St & Beech St Drainage |
Additional Pipe(S), Catch Basins, And/Or Asphalt |
$0 to $100,000 |
1.53 |
St. John Baptist |
2024-03-13 |
H.014736 |
|
St. John W. Bank Miss.R. Trail, Phase 2 |
10' Asphalt Trail, Ada Ramp, Bonfire Shelves and Benches |
$1,000,000 to $2,500,000 |
0.00 |
St. John Baptist |
2024-06-30 |
H.015416 |
|
Cardinal Dr: Ic Xing (Laplace) |
Close Ic Crossing |
$0 to $100,000 |
0.01 |
St. John Baptist |
2024-07-10 |
H.014109 |
US 61 |
Us 61: Wildcat Dr - Airport Rd |
Medium Overlay |
$1,000,000 to $2,500,000 |
2.97 |
St. John Baptist |
2024-07-10 |
H.014111 |
US 61 |
Us 61: Airport Rd - St James P/L |
Medium Overlay |
$10,000,000 to $15,000,000 |
5.19 |
St. John Baptist |
2024-07-10 |
H.015362 |
LA 628 |
La 628: Azalea Dr - St Charles P/L |
Patching, Milling and Overlay |
$1,000,000 to $2,500,000 |
1.92 |
St. John Baptist |
2024-08-14 |
H.010385 |
LA 3127 |
La 3127: St. James P/L - St. Charles P/L |
Cold Plane & Overlay |
$5,000,000 to $7,500,000 |
8.87 |
St. Landry |
2024-01-10 |
H.015790 |
LA 10 |
La 10: Palmetto Co Canal Br Replacement |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.34 |
St. Landry |
2024-02-14 |
H.013811 |
LA 104 |
La 104: 2.5 Mi Nw US 190 - US 190 |
Mill, Base Stabilization, and Overlay |
$2,500,000 to $5,000,000 |
2.50 |
St. Landry |
2024-02-14 |
H.014887 |
LA 3173 |
La 3173: La 105 - La 3174 |
Base Stabilization, Asphalt Overlay |
$500,000 to $1,000,000 |
0.63 |
St. Landry |
2024-02-14 |
H.015218 |
I-49 |
Grand Prairie Safety Rest Area Lighting |
Replaces Site Lighting System Currently Not Working |
$250,000 to $500,000 |
18.93 |
St. Landry |
2024-04-10 |
H.002176 219-07-0025 |
LA 10 |
La 10 Bridges |
New Bridges |
$10,000,000 to $15,000,000 |
1.22 |
St. Landry |
2024-04-10 |
H.015055 |
LA 3295 |
La 3295 - Eunice Local Road Repair |
Mill, Patch and Overlay As Mutually Agreed. |
$500,000 to $1,000,000 |
0.80 |
St. Landry |
2024-06-12 |
H.015357 |
LA 31, LA 182 |
La 31/La 182: La 742 - 0.355mi. N. La 31 |
Mill, Patch, Asphalt Overlay With Isolated Areas Of Base Reh |
$2,500,000 to $5,000,000 |
2.58 |
St. Landry |
2024-07-10 |
H.011549 |
US 190 |
Us 190 Eb: Drainage Improvements |
Remove Base & Surfacing, Reconstruct At Higher Elev |
$500,000 to $1,000,000 |
0.20 |
St. Landry |
2024-07-10 |
H.012534 |
LA 103 |
La103: Drainage Canal Bridge |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.20 |
St. Landry |
2024-07-10 |
H.015269 |
LA 182 |
La 182 @ La 3233 |
Add Turn Lane and Signal Modification |
$250,000 to $500,000 |
0.62 |
St. Landry |
2024-07-10 |
H.015774 |
LA 359 |
La 359: Local Road (Bolden) - La 10 |
Mill, In-place Base Rehab & Overlay |
$2,500,000 to $5,000,000 |
4.35 |
St. Landry |
2024-08-14 |
H.014552 |
I-49 |
I-49: La 31 Intchg Lighting (Opelousas) |
Replacement Of an Existing Interstate Lighting System |
$1,000,000 to $2,500,000 |
1.00 |
St. Landry |
2024-08-14 |
H.015057 |
LA 3116, LA 755-S |
La 3116 & La 755-s: Eunice Repairs |
Repair Of La 3116 and La 755-s to be Transferred to Eunice |
$500,000 to $1,000,000 |
1.45 |
St. Landry |
2024-09-11 |
H.011993 |
LA 10 |
La 10: Bayou Carron Bridge |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.30 |
St. Landry |
2024-09-11 |
H.014766 |
LA 10 |
La 10: Little Wauksha Br - US 71 |
Mill, In-place Base Rehab, and Overlay |
$2,500,000 to $5,000,000 |
4.70 |
St. Martin |
2024-01-10 |
H.014805 |
LA 328 |
La 328: I-10 - La 347 |
Mill, Base Rehab, Overlay, & Drainage Improvements |
$7,500,000 to $10,000,000 |
5.61 |
St. Martin |
2024-03-28 |
H.015573 |
I-10 |
I-10: W Atchafalaya Jt Repair @ Lk Pelba |
Finger Joint Replacement |
$500,000 to $1,000,000 |
0.00 |
St. Martin |
2024-06-12 |
H.013142 |
|
Ches Courville Rd Over Coulee Nicole G. |
Bridge Replacement - No New Alignment |
$500,000 to $1,000,000 |
0.01 |
St. Martin |
2024-07-10 |
H.014826 |
LA 347 |
La 347: La 351 - La 328 |
Mill, In-place Base Rehab. and Overlay |
$2,500,000 to $5,000,000 |
2.78 |
St. Martin |
2024-09-11 |
H.014793 |
LA 92-1 |
La 92-1: US 90 - La 182 |
Mill, In-place Base Rehab. & Overlay |
$2,500,000 to $5,000,000 |
3.09 |
St. Martin |
2024-11-13 |
H.014767 |
LA 182 |
La 182 @ Duchamp Intersection Imp. |
Add Left Turn Lanes On La 182 |
$250,000 to $500,000 |
0.56 |
St. Mary |
2024-01-10 |
H.015114 |
US 90-W |
Us 90-w: US 90 Over Bayou Ramos Repairs |
Repair Of Concrete Deck Girder Bridge Due to Barge Impact |
$500,000 to $1,000,000 |
0.14 |
St. Mary |
2024-06-12 |
H.015592 |
LA 3211 |
La 3211: RR Crossing - La 182 |
Base Rehabilitation and Asphalt Overlay |
$1,000,000 to $2,500,000 |
0.88 |
St. Mary |
2024-09-11 |
H.011706 |
|
Bnsf Several RR Xings (Baldwin) |
New Road Construction to Close Three Bnsf & Ldrr Crossings |
$1,000,000 to $2,500,000 |
0.00 |
St. Tammany |
2023-12-13 |
H.015090 |
US 90, LA 433 |
La433 & Us90:bonfouca & E Pearl Mb Rprs |
Mechanical and Electrical |
$100,000 to $250,000 |
0.24 |
St. Tammany |
2024-01-10 |
H.011775 |
US 190-Y, US 11 |
Us 11 & US 190 Bicycle and Ped Crossings |
Ped/Bicycle Crosswalks, Signs and Signals |
$500,000 to $1,000,000 |
0.23 |
St. Tammany |
2024-02-14 |
H.013268 |
LA 1129 |
La 1129: La 40 - La Tung Rd |
Patch, Mill, Overlay |
$2,500,000 to $5,000,000 |
5.36 |
St. Tammany |
2024-02-14 |
H.014142 |
US 190 |
Us 190: Drainage Improvements (Lacombe) |
Drainage Improvements |
$500,000 to $1,000,000 |
0.20 |
St. Tammany |
2024-02-14 |
H.014559 |
LA 3292 |
La 3292:la 40-wash P/L (Isabel Swamp Rd) |
Stabilized Base, Mill, Overlay and Related Work |
$1,000,000 to $2,500,000 |
2.36 |
St. Tammany |
2024-06-12 |
H.004957 852-33-0002 |
LA 434, LA 3241 |
La 3241:i-12/La 434 Interchange to La 36 |
New 4-lane |
$70,000,000 to $100,000,000 |
6.38 |
St. Tammany |
2024-06-12 |
H.013872 |
LA 1085, LA 22 |
La 22 @ La 1085 Roundabout |
Construct a Roundabout |
$500,000 to $1,000,000 |
0.66 |
St. Tammany |
2024-07-10 |
H.014888 |
LA 21 |
La 21: Int. Improvements At La 36 |
Intersection Reconfiguration |
$1,000,000 to $2,500,000 |
0.30 |
St. Tammany |
2024-07-10 |
H.015575 |
US 190-X |
Us 190b: US 190 - La 21 |
Patch, Mill and Overlay |
$2,500,000 to $5,000,000 |
1.68 |
St. Tammany |
2024-08-14 |
H.014845 |
US 190 |
Us 190: Cane Bayou - La 434 |
Mill, Patch, Overlay |
$2,500,000 to $5,000,000 |
4.27 |
St. Tammany |
2024-09-10 |
H.015054 |
LA 437 |
La 437: City Of Covington (Rt) |
Provide $79,653.77 In Funds to the City Of Covington |
$0 to $100,000 |
0.18 |
St. Tammany |
2024-10-09 |
H.014113 |
US 190 |
Us 190: La 434 - La 433 |
Mill, Patch, and Overlay |
$2,500,000 to $5,000,000 |
6.39 |
St. Tammany |
2024-10-09 |
H.014362 |
|
Lake Road - Big Branch Marsh Nwr |
Maintenance Of Existing Aggregate Road and Bridge Repair |
$250,000 to $500,000 |
1.18 |
St. Tammany |
2024-10-09 |
H.015283 |
LA 21 |
La 21: Fairgrounds Blvd - La 40 |
Asphalt Overlay |
$2,500,000 to $5,000,000 |
3.51 |
St. Tammany, Tangipahoa |
2024-07-10 |
H.015109 |
LA 1091, LA 1090, LA 59, LA 3234, LA 22, LA 21, US 51-X, US 51, US 190, US 11 |
Access Mgmt Impr Tangipahoa/St Tammany |
Intersection Improvements |
$500,000 to $1,000,000 |
0.99 |
St. Tammany, Tangipahoa |
2024-10-09 |
H.014414 |
LA 22 |
La 22:bedico Creek-pine Creek Dr. |
Widening and Intersection Improvements |
$5,000,000 to $7,500,000 |
4.50 |
Statewide |
2024-01-10 |
H.015599 |
|
Barge 305-035 5 Yr. Drydock (2023) |
Drydocking For Repairs, Maintenance, and Painting |
$250,000 to $500,000 |
0.00 |
Statewide |
2024-05-08 |
H.013841 |
|
Vdms System Replacement |
Sea, Rfp Development and Implementation Of Replacement Vdms |
$250,000 to $500,000 |
0.00 |
Statewide |
2024-05-16 |
H.015892 |
|
Barge 305-008 Dry Dock For Repair (2024) |
Drydocking For Repairs, Maintenance, and Painting |
$500,000 to $1,000,000 |
0.00 |
Statewide |
2024-06-12 |
H.015789 |
|
M/V Cameron II - 2024 Uscg Midcycle Dryd |
Drydock For Uscg Exam and Other Maint & Repairs |
$500,000 to $1,000,000 |
0.00 |
Tangipahoa |
2024-02-14 |
H.011519 |
LA 1063 |
La 1063: Glendale Dr - US 51 Drainage |
Additional Pipe(S), Catch Basins, And/Or Asphalt |
$100,000 to $250,000 |
0.30 |
Tangipahoa |
2024-02-14 |
H.014822 |
US 51 |
Us 51: US 190 - La 3234 |
Medium Overlay |
$1,000,000 to $2,500,000 |
1.26 |
Tangipahoa |
2024-03-13 |
H.011512 |
US 51 |
Us 51 @ Sycamore St Amite City Drainage |
Additional Pipe(S), Catch Basins, And/Or Asphalt |
$0 to $100,000 |
0.30 |
Tangipahoa |
2024-04-10 |
H.013938 |
LA 3234 |
La 3234 University Ave Sidewalks |
Sidewalks |
$2,500,000 to $5,000,000 |
1.09 |
Tangipahoa |
2024-06-12 |
H.010289 |
LA 22 |
La 22: Roundabout Dunson/Ridgedell Rds. |
Construct Roundabout @ La 22/Dunson/Ridgedell |
$1,000,000 to $2,500,000 |
0.37 |
Tangipahoa |
2024-07-10 |
H.007598 744-53-0016 |
LA 16 |
Amite La 16 Pedestrian Project - Phase I |
New Sidewalks |
$500,000 to $1,000,000 |
0.53 |
Tangipahoa |
2024-07-10 |
H.015275 |
LA 16 |
La 16: La 445 - Washington P/L |
Asphalt Overlay |
$5,000,000 to $7,500,000 |
6.00 |
Tangipahoa |
2024-07-10 |
H.015365 |
LA 16 |
La 16: St Helena P/L - La 1046 |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
1.61 |
Tangipahoa |
2024-09-11 |
H.015333 |
|
Easley Road Over Sweetwater Creek |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.02 |
Tangipahoa |
2024-09-11 |
H.015404 |
|
E Lewiston Road Over Wilson Branch |
Bridge Replacement |
$1,000,000 to $2,500,000 |
0.03 |
Tangipahoa |
2024-09-11 |
H.015407 |
|
Old Genessee Road Bridges |
Bridge Replacement |
$1,000,000 to $2,500,000 |
1.63 |
Tangipahoa |
2024-11-13 |
H.015309 |
US 51 |
Us 51: La 40 - La 16 |
Thin Overlay |
$1,000,000 to $2,500,000 |
6.26 |
Tensas |
2024-02-14 |
H.014136 |
LA 573 |
La 573: Cooter Point Rd. - La 892 |
Patch & Overlay |
$1,000,000 to $2,500,000 |
7.88 |
Tensas |
2024-02-14 |
H.014875 |
LA 3252 |
La 3252: La 573 - La 892 |
Thin Overlay |
$1,000,000 to $2,500,000 |
6.68 |
Tensas |
2024-07-10 |
H.014137 |
LA 608 |
La 608: La 605 - 7.9 Miles East |
Patch, Overlay, Base Stabilization |
$2,500,000 to $5,000,000 |
7.79 |
Tensas |
2024-10-09 |
H.014133 |
LA 608 |
La 608: 7.9 Mi. E. La 605 - La 887 |
Stabilize Base & Overlay |
$2,500,000 to $5,000,000 |
5.84 |
Terrebonne |
2024-02-14 |
H.013340 |
|
Valhi Blvd, Multi-use Trail, Phase 1 |
Multi-use Path |
$500,000 to $1,000,000 |
1.90 |
Terrebonne |
2024-03-13 |
H.015115 |
LA 24 |
La 24: La 24 Over Icww Repair |
Repair Of Steel Plate Girder |
$1,000,000 to $2,500,000 |
0.73 |
Terrebonne |
2024-04-10 |
H.015792 |
LA 24 |
La 24: Aviation Rd - La 3087 |
Asphalt Pavement Patching |
$250,000 to $500,000 |
1.42 |
Terrebonne |
2024-05-08 |
H.013199 |
|
Country Estates Dr Over St. Louis Bayou |
Bridge Replacement - No New Alignment |
$1,000,000 to $2,500,000 |
0.01 |
Terrebonne |
2024-06-12 |
H.012949 |
LA 315 |
Dularge Br Lock Bar Rehabilitation |
Movable Bridge Machinery Repairs |
$100,000 to $250,000 |
0.43 |
Terrebonne |
2024-07-10 |
H.014761 |
LA 57 |
La 57: Cedar Grove Rd - Bobtown Bridge |
Patch, Mill and Overlay |
$2,500,000 to $5,000,000 |
2.32 |
Terrebonne |
2024-07-10 |
H.014843 |
LA 24, LA 182 |
La 24: La 661 - La 664 |
Mill and Overlay |
$2,500,000 to $5,000,000 |
2.58 |
Terrebonne |
2024-09-11 |
H.015753 |
LA 24 |
La 24: West St - Rv Ct |
Patching |
$100,000 to $250,000 |
0.20 |
Terrebonne |
2024-09-11 |
H.015772 |
LA 662 |
La 662: La 182 - Terrebonne P/L |
Mill and Overlay |
$1,000,000 to $2,500,000 |
0.43 |
Union |
2024-11-13 |
H.015234 |
LA 15 |
La 33: Drainage Improvements |
Cross Drain Replacement and Full Depth Asphalt Patch |
$100,000 to $250,000 |
0.10 |
Vermilion |
2024-01-10 |
H.014465 |
LA 82 |
La 82: Vermilion River Mb Rh(Perry)(Hbi) |
Movable Bridge Rehabilitation |
$15,000,000 to $20,000,000 |
0.30 |
Vermilion |
2024-03-13 |
H.015058 |
LA 14-Y, LA 331 |
La 14-business & La 331: Erath |
Mill Patch & Overlay La 14-b. Bring La 331 Up to Standard |
$2,500,000 to $5,000,000 |
2.66 |
Vermilion |
2024-04-10 |
H.015056 |
LA 685 |
La 685: La 14-business - Bayou Tigre |
Repair and Reconstruct La 685 With Drainage Improvements |
$500,000 to $1,000,000 |
0.77 |
Vermilion |
2024-06-12 |
H.014223 |
|
Camile Road Over Bayou Grand Marais |
Bridge Replacement No New Alignament |
$1,000,000 to $2,500,000 |
0.00 |
Vermilion |
2024-06-12 |
H.015769 |
LA 3147 |
La 3147: La 82 - Front Ridge Road |
Asphalt Overlay |
$2,500,000 to $5,000,000 |
1.84 |
Vermilion |
2024-10-09 |
H.015507 |
|
Minos Road Over Coulee |
Bridge Replacement |
$500,000 to $1,000,000 |
0.00 |
Vernon |
2024-01-10 |
H.015369 |
LA 121 |
La 121: La 8 - La 28 |
Thin Overlay |
$100,000 to $250,000 |
3.91 |
Vernon |
2024-06-12 |
H.006338 713-58-0114 |
|
Holton Harris Road Bridge |
Bridge Replacement - No Realignment |
$1,000,000 to $2,500,000 |
0.12 |
Vernon |
2024-06-12 |
H.013098 |
|
Jim Cryer Lane Over Bayou Anacoco |
Bridge Replacement; No New Alignment |
$1,000,000 to $2,500,000 |
0.03 |
Vernon |
2024-07-10 |
H.010354 |
LA 111 |
La 111: US 171 - La 117 |
Patch, Cold Plane, and Overlay |
$1,000,000 to $2,500,000 |
8.82 |
Vernon |
2024-10-09 |
H.012058 |
LA 8 |
La 8: Forker Creek Bridge |
Bridge Replacement |
$5,000,000 to $7,500,000 |
0.20 |
Vernon |
2024-10-09 |
H.014839 |
US 171 |
Us 171: La 8 - Sabine P/L |
Medium Overlay |
$7,500,000 to $10,000,000 |
15.36 |
Vernon |
2024-11-13 |
H.015289 |
LA 184 |
La 184: Fort Polk - La 28 |
Thin Overlay |
$1,000,000 to $2,500,000 |
3.02 |
Washington |
2024-01-10 |
H.014169 |
LA 3124 |
La 3124: Bogalusa City Limits - La 10 |
Mill, Overlay, Waterline Relocation, Hc Ramps, Striping |
$1,000,000 to $2,500,000 |
2.74 |
Washington |
2024-03-13 |
H.014923 |
LA 1073, LA 1070 |
La 1070 & La 1073: Overlays |
Recommended Treatments Are a Medium and Thin Overlay |
$2,500,000 to $5,000,000 |
4.50 |
Washington |
2024-06-11 |
H.015061 |
LA 1070, LA 1073 |
La 1070 & La 1073: Washington Parish Rt |
Provide $1,966,681 In Funds to Washington Parish |
$1,000,000 to $2,500,000 |
4.50 |
Washington |
2024-06-12 |
H.010980 |
LA 10 |
La 10:cumberland St- Austin St(Bogalusa) |
Lane Configuration Modification |
$100,000 to $250,000 |
0.27 |
Washington |
2024-06-30 |
H.015502 |
|
Ontario St: Ic Xing (Bogalusa) |
Install RR Gates and RR Surface |
$500,000 to $1,000,000 |
0.01 |
Washington |
2024-07-10 |
H.011202 |
|
Franklinton Jr High School Sidewalks |
Sidewalks Striping and Signage |
$100,000 to $250,000 |
0.00 |
Washington |
2024-07-10 |
H.012159 |
LA 430 |
La 430: La 25 - La 1069 Drainage |
Remove and Replace Pipes, Catch Basins, And/Or Asphalt |
$100,000 to $250,000 |
0.18 |
Washington |
2024-07-10 |
H.015366 |
LA 1055 |
La 1055: La 38 - Esco Riley Rd. |
Patch, Mill and Overlay |
$1,000,000 to $2,500,000 |
3.53 |
Washington |
2024-09-11 |
H.014852 |
LA 21 |
La 21: St. Tammany Pl - Bogalusa Cl |
Mill, Patch, Overlay |
$7,500,000 to $10,000,000 |
6.65 |
Webster |
2024-06-30 |
H.015132 |
LA 164 |
La 164: Each Kcs Spur Xings (Doyline) |
Upgrade RR Signals |
$0 to $100,000 |
0.04 |
Webster |
2024-09-11 |
H.014228 |
LA 159 |
La 159: Bridges Near Shongaloo |
Bridge Replacement |
$7,500,000 to $10,000,000 |
0.53 |
Webster |
2024-10-09 |
H.015776 |
LA 160 |
La 160: Bodcau Creek to US 371 |
Medium Overlay |
$1,000,000 to $2,500,000 |
2.33 |
Webster |
2024-11-13 |
H.014218 |
LA 2-A |
La 2a: Thorny Branch & Indian Creek Brs |
Bridge Replacement |
$1,000,000 to $2,500,000 |
2.48 |
West Baton Rouge |
2024-02-14 |
H.015409 |
I-10 |
I-10: Miss R. Br W. Appr Girder Re Ph 1 |
Urgent Bridge Rehabilitation |
$1,000,000 to $2,500,000 |
0.43 |
West Baton Rouge |
2024-05-31 |
H.014013 |
|
La 1 & Ave G: Up Preemption (Port Allen) |
Connect Crossing With Traffic Signal For Preemption |
$0 to $100,000 |
0.03 |
West Baton Rouge |
2024-06-12 |
H.011558 |
LA 1, LA 990 |
Acadian Trail (West Baton Rouge) |
Construct Acadian Trail |
$500,000 to $1,000,000 |
0.62 |
West Baton Rouge |
2024-07-10 |
H.012394 |
LA 415 |
La 415: La 986 ? 0.24 Mi N La 620 |
Thin Overlay |
$2,500,000 to $5,000,000 |
5.00 |
West Baton Rouge |
2024-07-10 |
H.014258 |
LA 1 |
La 1:port Allen Canal Br Repl (Ph2)(Hbi) |
Bridge Replacement |
$70,000,000 to $100,000,000 |
1.10 |
West Baton Rouge |
2024-10-09 |
H.015560 |
LA 986 |
La 986: La 1 - Jefferson Ave |
Patching, Milling, Asphalt Overlay, Drainage |
$500,000 to $1,000,000 |
0.31 |
West Baton Rouge |
2024-11-13 |
H.015767 |
LA 1 |
La 1: Intracoastal Br ? US 190 Wb |
Pcc Patching, Patching, Milling, Overlay |
$10,000,000 to $15,000,000 |
5.97 |
West Baton Rouge |
2024-11-30 |
H.011133 |
LA 1 |
La 1: Up RR Xing (West Baton Rouge) |
Remove Crossing |
$250,000 to $500,000 |
0.00 |
West Carroll |
2024-01-10 |
H.014498 |
LA 17 |
La 17: 1.5 Miles N Darnell - Gaddis St |
Patch Mill and 2 Lift Overlay |
$10,000,000 to $15,000,000 |
12.48 |
West Carroll |
2024-01-10 |
H.015237 |
LA 589 |
La 589: Drainage Improvements |
Cross Drain Replacement and Full Depth Asphalt Patch |
$100,000 to $250,000 |
0.01 |
West Carroll |
2024-03-13 |
H.014838 |
LA 585 |
La 585: La 586 - East Carroll P/L |
Asphalt Surface Treatment |
$1,000,000 to $2,500,000 |
12.14 |
West Feliciana |
2024-04-10 |
H.013957 |
|
Sligo Road Over Walter Creek |
Bridge Replacement |
$500,000 to $1,000,000 |
0.03 |
West Feliciana |
2024-06-12 |
H.015559 |
LA 10 |
La 10: US 61 - 1.3 Mi E Of US 61 |
Patching, Milling, Asphalt Overlay |
$500,000 to $1,000,000 |
1.30 |
Winn |
2024-07-10 |
H.014820 |
US 167 |
Us 167: La 156 - South Of Dodson |
Thin Overlay |
$2,500,000 to $5,000,000 |
7.77 |
Winn |
2024-10-09 |
H.015313 |
LA 156 |
La 156: Sanders Cemetery Rd - La 501 |
Mill, In-place Base Rehab & Overlay |
$1,000,000 to $2,500,000 |
2.98 |