Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Barber Bros. Contracting Co., L.L.C |
Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 201-01-00100 | Clearing and Grubbing | 7 | LUMP | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 50,000.00 | 50,000.00 |
0003 | 202-02-02020 | Removal of Asphalt Pavement | 17,854.3 | SQYD | 15.00 | 267,814.50 | 10.00 | 178,543.00 |
0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 54,522.5 | SQYD | 10.00 | 545,225.00 | 10.00 | 545,225.00 |
0005 | 202-02-06060 | Removal of Concrete Catch Basin | 28 | EACH | 500.00 | 14,000.00 | 1,700.00 | 47,600.00 |
0006 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 1,589.2 | LNFT | 5.00 | 7,946.00 | 22.00 | 34,962.40 |
0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,068 | SQYD | 25.00 | 76,700.00 | 22.00 | 67,496.00 |
0008 | 202-02-06140 | Removal of Curbs (Concrete) | 5,853.7 | LNFT | 2.00 | 11,707.40 | 12.00 | 70,244.40 |
0009 | 202-02-14500 | Removal of Guard Rail | 1,368.8 | LNFT | 7.00 | 9,581.60 | 8.00 | 10,950.40 |
0010 | 202-02-26000 | Removal of Manholes | 6 | EACH | 420.00 | 2,520.00 | 2,000.00 | 12,000.00 |
0011 | 202-02-26300 | Removal of Median / Island | 1,822 | SQYD | 25.00 | 45,550.00 | 20.00 | 36,440.00 |
0012 | 202-02-32000 | Removal of Paved Ditches | 199 | SQYD | 25.00 | 4,975.00 | 40.00 | 7,960.00 |
0013 | 202-02-32100 | Removal of Pipe (Cross Drain) All Sizes | 399 | LNFT | 80.00 | 31,920.00 | 70.00 | 27,930.00 |
0014 | 202-02-32140 | Removal of Pipe (Storm Drain) All Sizes | 2,597 | LNFT | 20.00 | 51,940.00 | 40.00 | 103,880.00 |
0015 | 202-02-32180 | Removal of Pipe Headwalls | 3 | EACH | 2,500.00 | 7,500.00 | 3,000.00 | 9,000.00 |
0016 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 34,844 | SQYD | 22.00 | 766,568.00 | 20.00 | 696,880.00 |
0017 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 |
0018 | 203-01-00100 | General Excavation | 25,279 | CUYD | 15.00 | 379,185.00 | 30.00 | 758,370.00 |
0019 | 203-03-00100 | Embankment | 10,998 | CUYD | 35.00 | 384,930.00 | 45.00 | 494,910.00 |
0020 | 204-02-00100 | Temporary Hay Bales | 1,085 | EACH | 19.00 | 20,615.00 | 35.00 | 37,975.00 |
0021 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 18 | EACH | 180.00 | 3,240.00 | 500.00 | 9,000.00 |
0022 | 204-06-00100 | Temporary Silt Fencing | 13,643 | LNFT | 2.20 | 30,014.60 | 3.00 | 40,929.00 |
0023 | 302-02-10020 | Class II Base Course (10" Thick) (Crushed Stone) | 57,916.7 | SQYD | 61.00 | 3,532,918.70 | 60.00 | 3,475,002.00 |
0024 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 57,917 | SQYD | 21.00 | 1,216,257.00 | 35.00 | 2,027,095.00 |
0025 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 21,784 | SQYD | 20.00 | 435,680.00 | 110.00 | 2,396,240.00 |
0026 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,500 | CUYD | 25.00 | 37,500.00 | 100.00 | 150,000.00 |
0027 | 502-01-00100 | Asphalt Concrete (Base Course)(Level 1) | 8,704.7 | TON | 175.00 | 1,523,322.50 | 150.00 | 1,305,705.00 |
0028 | 502-01-00100 | Asphalt Concrete (Base Couse)(Level 1) | 2,378.6 | TON | 175.00 | 416,255.00 | 150.00 | 356,790.00 |
0029 | 502-01-00100 | Asphalt Concrete (Binder Course)(Level 2) | 11,083.3 | TON | 190.00 | 2,105,827.00 | 180.00 | 1,994,994.00 |
0030 | 502-01-00100 | Asphalt Concrete (Wearing Course)(Level 2F) | 5,286.3 | TON | 200.00 | 1,057,260.00 | 200.00 | 1,057,260.00 |
0031 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 75.7 | TON | 350.00 | 26,495.00 | 350.00 | 26,495.00 |
0032 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1.5 | CUYD | 0.01 | -0.02 | 0.00 | 0.00 |
0033 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) (13") | 1,677.6 | SQYD | 300.00 | 503,280.00 | 250.00 | 419,400.00 |
0034 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 140 | LNFT | 300.00 | 42,000.00 | 350.00 | 49,000.00 |
0035 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 1,904 | LNFT | 200.00 | 380,800.00 | 160.00 | 304,640.00 |
0036 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 34 | LNFT | 220.00 | 7,480.00 | 185.00 | 6,290.00 |
0037 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 496 | LNFT | 240.00 | 119,040.00 | 250.00 | 124,000.00 |
0038 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 1,132 | LNFT | 260.00 | 294,320.00 | 300.00 | 339,600.00 |
0039 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 416 | LNFT | 370.00 | 153,920.00 | 350.00 | 145,600.00 |
0040 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 196 | LNFT | 400.00 | 78,400.00 | 375.00 | 73,500.00 |
0041 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 4 | LNFT | 1,000.00 | 4,000.00 | 650.00 | 2,600.00 |
0042 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 134 | LNFT | 400.00 | 53,600.00 | 370.00 | 49,580.00 |
0043 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 246 | LNFT | 420.00 | 103,320.00 | 400.00 | 98,400.00 |
0044 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 734 | LNFT | 560.00 | 411,040.00 | 500.00 | 367,000.00 |
0045 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 40 | LNFT | 220.00 | 8,800.00 | 250.00 | 10,000.00 |
0046 | 701-11-01060 | Reinforced Concrete Pipe Arch (Extension) (30" Equiv.) | 34 | LNFT | 400.00 | 13,600.00 | 350.00 | 11,900.00 |
0047 | 701-11-01080 | Reinforced Concrete Pipe Arch (Extension) (36" Equiv.) | 180 | LNFT | 440.00 | 79,200.00 | 360.00 | 64,800.00 |
0048 | 701-14-00100 | Cleaning Existing Pipes | 2,078 | LNFT | 30.00 | 62,340.00 | 20.00 | 41,560.00 |
0049 | 701-15-00100 | Concrete Collar | 7 | EACH | 4,000.00 | 28,000.00 | 2,000.00 | 14,000.00 |
0050 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,138 | LNFT | 0.01 | 11.38 | 10.00 | 11,380.00 |
0051 | 702-01-00100 | Junction Boxes (Signal) | 1 | EACH | 5,500.00 | 5,500.00 | 5,500.00 | 5,500.00 |
0052 | 702-02-00100 | Manholes (MH-06) | 33 | EACH | 12,000.00 | 396,000.00 | 6,000.00 | 198,000.00 |
0053 | 702-03-00100 | Catch Basins (CB-01) | 18 | EACH | 6,000.00 | 108,000.00 | 7,500.00 | 135,000.00 |
0054 | 702-03-00200 | Catch Basins (CB-02) | 4 | EACH | 7,500.00 | 30,000.00 | 10,000.00 | 40,000.00 |
0055 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
0056 | 702-03-00500 | Catch Basins (CB-06) | 30 | EACH | 12,000.00 | 360,000.00 | 8,000.00 | 240,000.00 |
0057 | 702-03-00600 | Catch Basins (CB-07) | 10 | EACH | 15,000.00 | 150,000.00 | 12,000.00 | 120,000.00 |
0058 | 702-03-00700 | Catch Basins (CB-08) | 18 | EACH | 24,000.00 | 432,000.00 | 15,000.00 | 270,000.00 |
0059 | 702-03-00800 | Catch Basins (CB-09) | 6 | EACH | 14,000.00 | 84,000.00 | 13,000.00 | 78,000.00 |
0060 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 |
0061 | 702-07-00100 | Cross Drain Safety End (Type 1) | 2 | EACH | 8,000.00 | 16,000.00 | 10,000.00 | 20,000.00 |
0062 | 702-07-00300 | Cross Drain Safety End (Type 3) | 4 | EACH | 12,000.00 | 48,000.00 | 18,000.00 | 72,000.00 |
0063 | 702-08-00100 | Side Drain Safety End (Type 1) | 8 | EACH | 8,000.00 | 64,000.00 | 5,000.00 | 40,000.00 |
0064 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 |
0065 | 703-01-00100 | Shoulder Underdrain Systems | 10,479 | LNFT | 40.00 | 419,160.00 | 15.00 | 157,185.00 |
0066 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 275.2 | LNFT | 40.00 | 11,008.00 | 40.00 | 11,008.00 |
0067 | 704-03-00300 | Blocked Out Guard Rail – 31”, (3’-1 ½ ” Post Spacing) | 46.9 | LNFT | 60.00 | 2,814.00 | 55.00 | 2,579.50 |
0068 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 39.6 | LNFT | 50.00 | 1,980.00 | 200.00 | 7,920.00 |
0069 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,000.00 | 16,000.00 | 4,000.00 | 16,000.00 |
0070 | 706-01-00100 | Concrete Walk (4" Thick) | 3,475.2 | SQYD | 100.00 | 347,520.00 | 80.00 | 278,016.00 |
0071 | 706-02-00200 | Concrete Drive (6" Thick) | 2,393.4 | SQYD | 110.00 | 263,274.00 | 115.00 | 275,241.00 |
0072 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 524 | SQYD | 100.00 | 52,400.00 | 100.00 | 52,400.00 |
0073 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 283.9 | SQYD | 110.00 | 31,229.00 | 120.00 | 34,068.00 |
0074 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (4") | 2,703.5 | SQYD | 150.00 | 405,525.00 | 100.00 | 270,350.00 |
0075 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 4" | 1,343.3 | SQYD | 150.00 | 201,495.00 | 100.00 | 134,330.00 |
0076 | 706-04-00110 | Curb Ramps Type 6 | 164.4 | SQYD | 200.00 | 32,880.00 | 200.00 | 32,880.00 |
0077 | 706-04-00110 | Curb Ramps Type 7 | 13.3 | SQYD | 200.00 | 2,660.00 | 450.00 | 5,985.00 |
0078 | 707-01-00100 | Concrete Curb | 5,281.4 | LNFT | 55.00 | 290,477.00 | 22.00 | 116,190.80 |
0079 | 707-03-00100 | Combination Concrete Curb and Gutter | 15,916.5 | LNFT | 60.00 | 954,990.00 | 50.00 | 795,825.00 |
0080 | 708-01-00100 | Right-of-Way Monument | 56 | EACH | 600.00 | 33,600.00 | 600.00 | 33,600.00 |
0081 | 708-02-00100 | Right-of-Way Monument Witness Post | 56 | EACH | 200.00 | 11,200.00 | 200.00 | 11,200.00 |
0082 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 173 | SQYD | 130.00 | 22,490.00 | 160.00 | 27,680.00 |
0083 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 1,500,000.00 | 1,500,000.00 |
0084 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 5.875 | MILE | 3,000.00 | 17,625.00 | 2,500.00 | 14,687.50 |
0085 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 2.802 | MILE | 6,000.00 | 16,812.00 | 5,000.00 | 14,010.00 |
0086 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 18.719 | MILE | 11,000.00 | 205,909.00 | 11,000.00 | 205,909.00 |
0087 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 10 | EACH | 400.00 | 4,000.00 | 350.00 | 3,500.00 |
0088 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 3 | EACH | 400.00 | 1,200.00 | 350.00 | 1,050.00 |
0089 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 13 | EACH | 450.00 | 5,850.00 | 400.00 | 5,200.00 |
0090 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 627 | EACH | 12.00 | 7,524.00 | 11.00 | 6,897.00 |
0091 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 82 | EACH | 2,000.00 | 164,000.00 | 1,800.00 | 147,600.00 |
0092 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 37 | EACH | 300.00 | 11,100.00 | 250.00 | 9,250.00 |
0093 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 20,000.00 | 80,000.00 | 22,000.00 | 88,000.00 |
0094 | 716-01-00100 | Mulch (Vegetative) | 8.1 | TON | 1,000.00 | 8,100.00 | 2,500.00 | 20,250.00 |
0095 | 717-01-00100 | Seeding | 250 | LB | 20.00 | 5,000.00 | 15.00 | 3,750.00 |
0096 | 718-01-00100 | Fertilizer | 8,299 | LB | 1.00 | 8,299.00 | 2.00 | 16,598.00 |
0097 | 722-02-00100 | Project Site Laboratory (Equipped) | 3 | EACH | 10,000.00 | 30,000.00 | 10,000.00 | 30,000.00 |
0098 | 726-01-00100 | Bedding Material | 1,706 | CUYD | 150.00 | 255,900.00 | 100.00 | 170,600.00 |
0099 | 727-01-00100 | Mobilization | 1 | LUMP | 3,000,000.00 | 3,000,000.00 | 3,000,000.00 | 3,000,000.00 |
0100 | 729-01-00100 | Sign (Type A) | 1,441 | SQFT | 50.00 | 72,050.00 | 40.00 | 57,640.00 |
0101 | 729-04-00100 | Sign (Type D) | 287.4 | SQFT | 60.00 | 17,244.00 | 50.00 | 14,370.00 |
0102 | 729-06-00100 | Sign (Overhead Mounted) | 394 | SQFT | 70.00 | 27,580.00 | 55.00 | 21,670.00 |
0103 | 729-08-00100 | Mounting (2 1/2" Size Post) | 119 | EACH | 2,000.00 | 238,000.00 | 2,000.00 | 238,000.00 |
0104 | 729-08-00200 | Mounting (3 1/2" Size Post) | 12 | EACH | 2,500.00 | 30,000.00 | 2,200.00 | 26,400.00 |
0105 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 19 | EACH | 2,800.00 | 53,200.00 | 2,500.00 | 47,500.00 |
0106 | 729-09-00300 | Mounting (Overhead Truss) (Ground Mounted) (72' Span) | 1 | EACH | 130,000.00 | 130,000.00 | 120,000.00 | 120,000.00 |
0107 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 100.00 | 1,000.00 | 95.00 | 950.00 |
0108 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 2 | EACH | 60,000.00 | 120,000.00 | 60,000.00 | 120,000.00 |
0109 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 155 | EACH | 300.00 | 46,500.00 | 250.00 | 38,750.00 |
0110 | 731-02-00100 | Reflectorized Raised Pavement Markers | 551 | EACH | 30.00 | 16,530.00 | 22.00 | 12,122.00 |
0111 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) | 2 | EACH | 1,100.00 | 2,200.00 | 1,000.00 | 2,000.00 |
0112 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 5 | EACH | 550.00 | 2,750.00 | 500.00 | 2,500.00 |
0113 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 13 | EACH | 1,000.00 | 13,000.00 | 850.00 | 11,050.00 |
0114 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 550.00 | 2,750.00 | 500.00 | 2,500.00 |
0115 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 15 | EACH | 550.00 | 8,250.00 | 500.00 | 7,500.00 |
0116 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 1,200.00 | 2,400.00 | 1,000.00 | 2,000.00 |
0117 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 2 | EACH | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 |
0118 | 732-04-01130 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LTRC) | 3 | EACH | 3,300.00 | 9,900.00 | 3,200.00 | 9,600.00 |
0119 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 15 | EACH | 3,300.00 | 49,500.00 | 3,200.00 | 48,000.00 |
0120 | 732-04-01132 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TRC) | 6 | EACH | 3,300.00 | 19,800.00 | 3,200.00 | 19,200.00 |
0121 | 732-04-01133 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LC) | 4 | EACH | 3,300.00 | 13,200.00 | 3,200.00 | 12,800.00 |
0122 | 732-04-01134 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type T) | 6 | EACH | 3,300.00 | 19,800.00 | 3,200.00 | 19,200.00 |
0123 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 22 | EACH | 900.00 | 19,800.00 | 850.00 | 18,700.00 |
0124 | 732-04-19040 | Plastic Pavement Legends and Symbols (Shield - Interstate) (Preformed Heat Applied Retroreflective Thermoplastic) | 5 | EACH | 5,500.00 | 27,500.00 | 5,500.00 | 27,500.00 |
0125 | 732-04-20000 | Plastic Pavement Legends and Symbols (TO) | 2 | EACH | 600.00 | 1,200.00 | 550.00 | 1,100.00 |
0126 | 732-05-00100 | Removal of Existing Markings | 2.014 | MILE | 11,000.00 | 22,154.00 | 10,000.00 | 20,140.00 |
0127 | 735-01-00100 | Mailboxes | 7 | EACH | 20.00 | 140.00 | 22.00 | 154.00 |
0128 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 300.00 | 2,100.00 | 300.00 | 2,100.00 |
0129 | 736-11-00400 | Conduit (4" HDPE, Schedule 80) | 950 | LNFT | 45.00 | 42,750.00 | 45.00 | 42,750.00 |
0130 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 3 | EACH | 160,000.00 | 480,000.00 | 150,000.00 | 450,000.00 |
0131 | 740-01-00100 | Construction Layout | 1 | LUMP | 200,000.00 | 200,000.00 | 350,000.00 | 350,000.00 |
0132 | 805-01-00900 | Class A1 Concrete (Structural) | 14.24 | CUYD | 3,500.00 | 49,840.00 | 2,700.00 | 38,448.00 |
0133 | 806-01-00100 | Deformed Reinforcing Steel | 808 | LB | 3.00 | 2,424.00 | 3.00 | 2,424.00 |
0134 | 810-06-00100 | Concrete Pier Protection System (Vehicle) (Barrier) | 840 | LNFT | 1,200.00 | 1,008,000.00 | 1,300.00 | 1,092,000.00 |
0135 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 31,694 | INLF | 0.65 | 20,601.10 | 1.00 | 31,694.00 |
0136 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,274 | INLF | 0.65 | 828.10 | 1.00 | 1,274.00 |
0137 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 119,142 | INLF | 0.75 | 89,356.50 | 1.00 | 119,142.00 |
0138 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 6 | EACH | 10,000.00 | 60,000.00 | 11,000.00 | 66,000.00 |
0139 | NS-702-00100 | Paved Gutter Drain | 63 | EACH | 5,000.00 | 315,000.00 | 10,000.00 | 630,000.00 |
0140 | NS-706-00100 | Truncated Dome System (Asphalt Concrete Pavement) | 2 | EACH | 500.00 | 1,000.00 | 3,000.00 | 6,000.00 |
0141 | NS-DEV-73206 | MMA Pavement Striping (Dotted)(4 inch Width)(2' L) | 1,961 | LNFT | 6.00 | 11,766.00 | 5.00 | 9,805.00 |
0142 | NS-DEV-73210 | MMA Pavement Striping (Dotted)(8 inch Width)(2' L) | 655 | LNFT | 9.00 | 5,895.00 | 8.00 | 5,240.00 |
0143 | NS-DEV-73214 | MMA Pavement Striping (Dotted)(24 inch Width)(2' L) | 680 | LNFT | 30.00 | 20,400.00 | 25.00 | 17,000.00 |
0144 | NS-DEV-73220 | MMA Pavement Striping (Dotted)(8 inch Width)(3' L) | 963 | LNFT | 9.00 | 8,667.00 | 8.00 | 7,704.00 |
0145 | NS-DEV-73230 | MMA Pavement Striping (Solid Line) (4 inch Width) | 35,103 | LNFT | 11.00 | 386,133.00 | 10.00 | 351,030.00 |
0146 | NS-DEV-73232 | MMA Pavement Striping (Solid Line) (8 inch Width) | 2,952 | LNFT | 22.00 | 64,944.00 | 20.00 | 59,040.00 |
0147 | NS-DEV-73236 | MMA Pavement Striping (Solid Line) (24 inch Width) | 2,769 | LNFT | 66.00 | 182,754.00 | 60.00 | 166,140.00 |
0148 | NS-DEV-73240 | MMA Pavement Striping (Broken Line) (4 inch Width) | 7,162 | LNFT | 6.00 | 42,972.00 | 5.00 | 35,810.00 |
| | | | | | | | |
| | CONTRACTOR TOTAL | | | | 28,998,998.36 | | 31,346,833.00 |