Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. |
Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 11.674 | LUMP | 70,000.00 | 70,000.00 | 100,000.00 | 100,000.00 |
0002 | 202-02-02020 | Removal of Asphalt Pavement | 318.2 | SQYD | 20.00 | 6,364.00 | 35.00 | 11,137.00 |
0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 390 | SQYD | 16.00 | 6,240.00 | 75.00 | 29,250.00 |
0004 | 202-02-14500 | Removal of Guard Rail | 907 | LNFT | 30.00 | 27,210.00 | 18.00 | 16,326.00 |
0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" CMP) | 31 | LNFT | 16.00 | 496.00 | 111.00 | 3,441.00 |
0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" EQUIV. CMPA) | 31 | LNFT | 16.00 | 496.00 | 125.00 | 3,875.00 |
0007 | 202-02-32100 | Removal of Pipe (Cross Drain) (36" EQUIV. CMPA) | 35 | LNFT | 16.00 | 560.00 | 132.00 | 4,620.00 |
0008 | 202-02-32120 | Removal of Pipe (Side Drain) (24" RCP) | 16 | LNFT | 16.00 | 256.00 | 160.00 | 2,560.00 |
0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,349 | CUYD | 40.00 | 53,960.00 | 20.00 | 26,980.00 |
0010 | 203-10-00100 | Cleaning Existing Ditches | 25 | LNFT | 30.00 | 750.00 | 30.00 | 750.00 |
0011 | 204-06-00100 | Temporary Silt Fencing | 455.5 | LNFT | 5.00 | 2,277.50 | 5.00 | 2,277.50 |
0012 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 14,207 | SQYD | 12.50 | 177,587.50 | 14.00 | 198,898.00 |
0013 | 303-02-00100 | Removal of Existing Patches | 400 | SQYD | 20.00 | 8,000.00 | 15.00 | 6,000.00 |
0014 | 304-01-00100 | Lime | 41.5 | TON | 300.00 | 12,450.00 | 300.00 | 12,450.00 |
0015 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 2,635 | SQYD | 14.00 | 36,890.00 | 12.00 | 31,620.00 |
0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4,349 | CUYD | 120.00 | 521,880.00 | 140.00 | 608,860.00 |
0017 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 66.6 | CUYD | 100.00 | 6,660.00 | 50.00 | 3,330.00 |
0018 | 502-01-00100 | Asphalt Concrete | 17,077.9 | TON | 124.00 | 2,117,659.60 | 121.00 | 2,066,425.90 |
0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 3,046.5 | TON | 124.00 | 377,766.00 | 259.00 | 789,043.50 |
0020 | 509-01-00100 | Milling Asphalt Pavement | 8,402 | SQYD | 12.00 | 100,824.00 | 10.00 | 84,020.00 |
0021 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -292 | CUYD | 1.00 | -292.00 | 1.00 | -292.00 |
0022 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 26 | SQYD | 175.00 | 4,550.00 | 300.00 | 7,800.00 |
0023 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 155 | SQYD | 200.00 | 31,000.00 | 140.00 | 21,700.00 |
0024 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 964 | SQYD | 240.00 | 231,360.00 | 140.00 | 134,960.00 |
0025 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 32 | LNFT | 175.00 | 5,600.00 | 225.00 | 7,200.00 |
0026 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 32 | LNFT | 185.00 | 5,920.00 | 250.00 | 8,000.00 |
0027 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 40 | LNFT | 225.00 | 9,000.00 | 290.00 | 11,600.00 |
0028 | 701-05-01001 | Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) | 6 | LNFT | 75.00 | 450.00 | 65.00 | 390.00 |
0029 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 8 | LNFT | 95.00 | 760.00 | 130.00 | 1,040.00 |
0030 | 701-05-01066 | Side Drain Pipe (24" RCP) | 56 | LNFT | 125.00 | 7,000.00 | 195.00 | 10,920.00 |
0031 | 701-08-00100 | Relaying Pipe (24" RCP) | 4 | LNFT | 120.00 | 480.00 | 130.00 | 520.00 |
0032 | 701-08-00100 | Relaying Pipe (30" RCP) | 16 | LNFT | 125.00 | 2,000.00 | 130.00 | 2,080.00 |
0033 | 701-15-00100 | Concrete Collar | 18 | EACH | 900.00 | 16,200.00 | 2,000.00 | 36,000.00 |
0034 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 104 | LNFT | 2.00 | 208.00 | 6.00 | 624.00 |
0035 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 9 | EACH | 1,800.00 | 16,200.00 | 1,900.00 | 17,100.00 |
0036 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 100 | LNFT | 65.00 | 6,500.00 | 70.00 | 7,000.00 |
0037 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 78 | LNFT | 140.00 | 10,920.00 | 150.00 | 11,700.00 |
0038 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 175 | LNFT | 30.00 | 5,250.00 | 33.00 | 5,775.00 |
0039 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 95.00 | 9,500.00 | 100.00 | 10,000.00 |
0040 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 4,750.00 | 4,750.00 | 5,000.00 | 5,000.00 |
0041 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 3,400.00 | 10,200.00 | 3,800.00 | 11,400.00 |
0042 | 704-10-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 3,700.00 | 14,800.00 | 4,000.00 | 16,000.00 |
0043 | 706-01-00100 | Concrete Walk (4" Thick) | 305.3 | SQYD | 65.00 | 19,844.50 | 125.00 | 38,162.50 |
0044 | 706-04-00100 | Handicapped Curb Ramps (TYPE 5) | 2 | EACH | 1,600.00 | 3,200.00 | 2,000.00 | 4,000.00 |
0045 | 706-04-00100 | Handicapped Curb Ramps (TYPE 6) | 2 | EACH | 1,700.00 | 3,400.00 | 2,000.00 | 4,000.00 |
0046 | 706-04-00100 | Handicapped Curb Ramps (TYPE 7) | 5 | EACH | 1,750.00 | 8,750.00 | 2,000.00 | 10,000.00 |
0047 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 32 | SQYD | 100.00 | 3,200.00 | 150.00 | 4,800.00 |
0048 | 711-04-00100 | Geotextile Fabric | 32 | SQYD | 5.00 | 160.00 | 5.00 | 160.00 |
0049 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 90,000.00 | 90,000.00 |
0050 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 20 | LNFT | 1.00 | 20.00 | 1.10 | 22.00 |
0051 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.017 | MILE | 200.00 | 2,803.40 | 200.00 | 2,803.40 |
0052 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.125 | MILE | 500.00 | 4,062.50 | 600.00 | 4,875.00 |
0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 61.175 | MILE | 100.00 | 6,117.50 | 1,000.00 | 61,175.00 |
0054 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 3 | EACH | 100.00 | 300.00 | 125.00 | 375.00 |
0055 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 930 | EACH | 3.50 | 3,255.00 | 5.00 | 4,650.00 |
0056 | 716-01-00100 | Mulch (Vegetative) | 14.2 | TON | 650.00 | 9,230.00 | 600.00 | 8,520.00 |
0057 | 717-01-00100 | Seeding | 422 | LB | 11.00 | 4,642.00 | 15.00 | 6,330.00 |
0058 | 718-01-00100 | Fertilizer | 7,010 | LB | 0.60 | 4,206.00 | 0.50 | 3,505.00 |
0059 | 724-01-00100 | Rumble Strips (Centerline) | 3.91 | MILE | 400.00 | 1,564.00 | 1,500.00 | 5,865.00 |
0060 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.82 | MILE | 400.00 | 3,128.00 | 1,500.00 | 11,730.00 |
0061 | 724-03-00100 | Rumble Strips (Intersection) | 1 | EACH | 6,000.00 | 6,000.00 | 1,800.00 | 1,800.00 |
0062 | 726-01-00100 | Bedding Material | 91.6 | CUYD | 110.00 | 10,076.00 | 135.00 | 12,366.00 |
0063 | 727-01-00100 | Mobilization | 1 | LUMP | 460,000.00 | 460,000.00 | 330,000.00 | 330,000.00 |
0064 | 729-16-00200 | Object Marker Assembly (Type 2) | 72 | EACH | 100.00 | 7,200.00 | 60.00 | 4,320.00 |
0065 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 110.00 | 880.00 | 120.00 | 960.00 |
0066 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,033 | EACH | 6.00 | 18,198.00 | 7.00 | 21,231.00 |
0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 338 | LNFT | 15.00 | 5,070.00 | 15.00 | 5,070.00 |
0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 48.617 | MILE | 4,000.00 | 194,468.00 | 4,500.00 | 218,776.50 |
0069 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.191 | MILE | 1,000.00 | 6,191.00 | 1,100.00 | 6,810.10 |
0070 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) (STOP) | 1 | EACH | 800.00 | 800.00 | 700.00 | 700.00 |
0071 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 3 | EACH | 1,000.00 | 3,000.00 | 1,000.00 | 3,000.00 |
0072 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 2 | EACH | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 |
0073 | 732-05-00100 | Removal of Existing Markings | 3.52 | MILE | 5,000.00 | 17,600.00 | 5,000.00 | 17,600.00 |
0074 | 735-01-00100 | Mailboxes | 233 | EACH | 5.00 | 1,165.00 | 10.00 | 2,330.00 |
0075 | 735-02-00100 | Mailbox Supports (Single) | 159 | EACH | 150.00 | 23,850.00 | 180.00 | 28,620.00 |
0076 | 735-03-00100 | Mailbox Supports (Double) | 37 | EACH | 180.00 | 6,660.00 | 225.00 | 8,325.00 |
0077 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 26,000.00 | 26,000.00 |
0078 | 741-11-00100 | Adjusting Water Valve | 5 | EACH | 800.00 | 4,000.00 | 300.00 | 1,500.00 |
0079 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 1,228 | LNFT | 3.00 | 3,684.00 | 4.00 | 4,912.00 |
0080 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,044 | LNFT | 3.00 | 3,132.00 | 4.00 | 4,176.00 |
0081 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 2,272 | LNFT | 2.50 | 5,680.00 | 4.00 | 9,088.00 |
0082 | NS-500-00380 | Micro-surfacing Aggregate | 1,115.7 | TON | 175.00 | 195,247.50 | 200.00 | 223,140.00 |
0083 | NS-500-00400 | Micro-surfacing Asphalt | 32,132.1 | GAL | 5.00 | 160,660.50 | 5.00 | 160,660.50 |
| | | | | | | | |
| | CONTRACTOR TOTAL | | | | 5,352,127.50 | | 5,682,738.90 |