Bid Tabulations for the Letting of 8/11/2021 LA DOTD Headquarters

Proposal:H.014124.6
Parish:Pointe Coupee
Routes:LA 414
Description:LA 414: 140' W LA 413 - LA 415
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, SUBGRADE TREATMENT, LIME TREATMENT, IN-PLACE STABILIZED BASE COURSE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,350,910.88
108584Madden Contracting Co., LLC$6,824,326.48
200046Barber Bros. Contracting Co., L.L.C$7,072,252.90
312031R.J. Daigle & Sons Contractors, Inc$7,789,768.61
406276Barriere Construction Co., LLC$9,502,017.85


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Madden Contracting Co., LLC
- 2 -
Barber Bros. Contracting Co., L.L.C
- 3 -
R.J. Daigle & Sons Contractors, Inc
- 4 -
Barriere Construction Co., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-06020Removal of Concrete Box Culverts 4'x3' RCB X 48'1     EACH5,000.005,000.0010,000.0010,000.008,777.278,777.271,500.001,500.00
0002202-02-06040Removal of Concrete Box Headwall 4'X3' RCB2     EACH1,500.003,000.005,000.0010,000.003,004.136,008.26695.001,390.00
0003202-02-06100Removal of Concrete Walks and Drives 487     SQYD13.006,331.0018.008,766.007.363,584.3225.0012,175.00
0004202-02-32100Removal of Pipe (Cross Drain) 18" RCP50     LNFT11.00550.0030.001,500.0016.82841.0013.00650.00
0005202-02-32100Removal of Pipe (Cross Drain) 24" RCP464     LNFT11.005,104.0030.0013,920.0017.818,263.8420.009,280.00
0006202-02-32120Removal of Pipe (Side Drain) 12" RCP125     LNFT11.001,375.0025.003,125.008.771,096.2513.001,625.00
0007202-02-32120Removal of Pipe (Side Drain) 18" CMP2,649     LNFT11.0029,139.0025.0066,225.009.2024,370.8011.0029,139.00
0008202-02-32120Removal of Pipe (Side Drain) 18" PP60     LNFT11.00660.0025.001,500.009.20552.0011.00660.00
0009202-02-32120Removal of Pipe (Side Drain) 18" RCP36     LNFT11.00396.0030.001,080.009.35336.6011.00396.00
0010202-02-32120Removal of Pipe (Side Drain) 24" CMP54     LNFT11.00594.0030.001,620.009.43509.2211.00594.00
0011203-07-00100Borrow (Vehicular Measurement) 647     CUYD30.0019,410.0050.0032,350.0060.6939,266.43110.0071,170.00
0012203-10-00100Cleaning Existing Ditches 3,900     LNFT7.5029,250.0010.0039,000.006.5925,701.0010.0039,000.00
0013204-02-00100Temporary Hay Bales 100     EACH19.501,950.0040.004,000.0022.002,200.0025.002,500.00
0014204-06-00100Temporary Silt Fencing 6,500     LNFT1.439,295.001.509,750.002.0413,260.002.5016,250.00
0015303-01-00400In-Place Cement Stabilized Base Course (12" Thick) 72,464     SQYD15.501,123,192.0010.00724,640.0011.33821,017.1216.851,221,018.40
0016303-02-00100Removal of Existing Patches 20     SQYD1.0020.0022.00440.0016.88337.6035.00700.00
0017304-01-00100Lime 1,540.77  TON295.00454,527.15225.00346,673.25220.40339,585.71270.00416,007.90
0018304-03-00400Lime Treatment (Type C) (12" Thick) 108,696     SQYD5.00543,480.002.50271,740.003.20347,827.2010.001,086,960.00
0019309-01-12000In-Place Cement Treated Subgrade (12" Thick) 72,464     SQYD10.00724,640.0012.00869,568.008.40608,697.6014.501,050,728.00
0020401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,612     CUYD97.48157,137.7635.0056,420.0062.15100,185.8071.00114,452.00
0021402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 100     CUYD76.007,600.0090.009,000.00152.5015,250.0077.007,700.00
0022402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 300     CUYD76.0022,800.0050.0015,000.00131.7739,531.00115.0034,500.00
0023502-01-00100Asphalt Concrete 19,605.1   TON88.151,728,189.5779.001,548,802.9098.001,921,299.80105.002,058,535.50
0024502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 731.5   TON266.08194,637.52150.00109,725.00145.00106,067.50235.00171,902.50
0025507-01-00100Asphalt Material (CRS-2P Emulsion) 47,305     GAL2.90137,184.502.85134,819.253.00141,915.003.50165,567.50
0026507-02-00200Aggregate (S2) 69,565     SQYD1.65114,782.251.80125,217.001.85128,695.252.15149,564.75
0027507-02-00300Aggregate (S3) 69,565     SQYD1.3090,434.501.50104,347.501.55107,825.751.80125,217.00
0028509-01-00100Milling Asphalt Pavement 57,971     SQYD4.62267,826.025.00289,855.005.60324,637.606.15356,521.65
0029509-02-00100Contractor Retained Reclaimed Asphalt Pavement -4,831     CUYD0.01-48.3110.00-48,310.000.01-48.319.50-45,894.50
0030701-02-01000Cross Drain Pipe Arch (24" Equiv. RCPA) 504     LNFT152.0076,608.00140.0070,560.00232.67117,265.68250.00126,000.00
0031701-02-01020Cross Drain Pipe Arch (30" Equiv. RCPA) 56     LNFT175.009,800.00175.009,800.00251.1614,064.96290.0016,240.00
0032701-02-01080Cross Drain Pipe Arch (48" Equiv. RCPA) 56     LNFT310.0017,360.00300.0016,800.00336.2218,828.32455.0025,480.00
0033701-06-00020Side Drain Pipe Arch (18" Equiv. RCPA) 3,132     LNFT69.00216,108.00125.00391,500.00113.01353,947.32113.00353,916.00
0034701-14-00100Cleaning Existing Pipes 70     LNFT31.002,170.0035.002,450.0019.031,332.1050.003,500.00
0035701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 616     LNFT2.001,232.005.003,080.0015.009,240.0010.006,160.00
0036702-03-00100Catch Basins (CB-01) Cast in place only2     EACH3,300.006,600.006,000.0012,000.004,500.009,000.009,700.0019,400.00
0037706-02-00200Concrete Drive (6" Thick) 215     SQYD81.0017,415.00100.0021,500.00102.0721,945.05195.0041,925.00
0038711-01-04000Riprap (55 lb, 18" Thick) 660     SQYD77.0050,820.00100.0066,000.00164.03108,259.80130.0085,800.00
0039713-01-00100Temporary Signs and Barricades 1     LUMP7,000.007,000.00300,000.00300,000.00600,000.00600,000.00580,000.00580,000.00
0040713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 24.59  MILE33.00811.47300.007,377.00110.002,704.90315.007,745.85
0041713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 20.99  MILE500.0010,495.00300.006,297.00550.0011,544.50630.0013,223.70
0042713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 64.11  MILE900.0057,699.00300.0019,233.00990.0063,468.901,200.0076,932.00
0043713-05-00400Temporary Pavement Legends & Symbols (RR Crossing) 6     EACH50.00300.0050.00300.0055.00330.0063.00378.00
0044713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 745     EACH2.501,862.503.002,235.007.255,401.253.002,235.00
0045714-01-00100Slab Sodding (Bermuda Grass) 739     SQYD10.998,121.6111.008,129.009.907,316.1011.008,129.00
0046720-01-02000Erosion Control System, Flexible (Channel Liner) (Type C) 2,000     SQYD1.843,680.002.004,000.001.943,880.002.505,000.00
0047722-02-00100Project Site Laboratory (Equipped) 1     EACH5,000.005,000.007,500.007,500.006,250.006,250.0040,000.0040,000.00
0048726-01-00100Bedding Material 1,682.9   CUYD75.00126,217.5070.00117,803.0045.1075,898.79115.00193,533.50
0049727-01-00100Mobilization 1     LUMP379,913.00379,913.001,050,000.001,050,000.001,000,000.001,000,000.00580,000.00580,000.00
0050729-16-00200Object Marker Assembly (Type 2) 50     EACH75.003,750.0078.003,900.0082.504,125.0095.004,750.00
0051731-02-00100Reflectorized Raised Pavement Markers 745     EACH6.504,842.506.805,066.007.155,326.758.005,960.00
0052732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 80     LNFT15.001,200.0015.751,260.0016.501,320.0018.501,480.00
0053732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 12.822 MILE3,800.0048,723.604,000.0051,288.004,179.3553,587.634,750.0060,904.50
0054732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.198 MILE950.003,988.101,000.004,198.001,045.504,389.011,200.005,037.60
0055732-04-18000Plastic Pavement Legends and Symbols (RR Crossing) 2     EACH850.001,700.00900.001,800.00935.001,870.001,100.002,200.00
0056735-01-00100Mailboxes 143     EACH1.00143.001.00143.0027.503,932.501.00143.00
0057735-02-00100Mailbox Supports (Single) 143     EACH170.0024,310.00180.0025,740.00165.0023,595.00215.0030,745.00
0058739-01-00100Hydro-Seeding 0.1   ACRE33,750.003,375.0035,000.003,500.0019,800.001,980.0022,700.002,270.00
0059740-01-00100Construction Layout 1     LUMP5,000.005,000.0035,000.0035,000.0058,050.1258,050.1250,000.0050,000.00
0060805-16-02700Reinforced Concrete Box Culverts (Extension) 4'X3' RCB X (8' Left +10' Right) (Cast in place only)18     LNFT980.0017,640.002,500.0045,000.002,722.8049,010.401,500.0027,000.00
0061NS-201-00022Stump Removal (36" - 48" Diameter) 1     EACH2,600.002,600.002,000.002,000.001,650.001,650.005,650.005,650.00
0062NS-500-00300Traffic Maintenance Asphalt Concrete 89     TON330.1629,384.24180.0016,020.00142.2812,662.92230.0020,470.00
             
  CONTRACTOR TOTAL   6,824,326.48 7,072,252.90 7,789,768.61 9,502,017.85